🧱 CFC 211.1Reinforcement: bending, laps and placementChapter 9 of 10 in the section

Penetrations and sleeves through the structure: installing without weakening

After this chapter, you will be able to set out, wedge and seal through-penetrations and sleeves without damaging the reinforcement or weakening the structural element. You will be able to identify critical bearing or tensile zones, refuse unapproved openings and formalise adaptation requests to the civil engineer in accordance with Swiss recognised rules of the art.

Key takeaways

  • Any unplanned opening compromises structural integrity and requires structural strengthening that is often costly.
  • Installing a penetration requires strict compliance with formwork and reinforcement drawings.
  • Any penetration located in a tensile or bearing zone requires the engineer's written approval.
  • Rigid wedging and sealing of the sleeve prevent displacements and grout penetration.

Anticipating openings and refusing critical penetrations without the engineer's approval

On a reinforced concrete construction site, core drilling a slab or a wall after the event is a high technical and financial risk operation. As soon as load-bearing rebar is severed, the mechanical resistance of the element drops sharply, which requires the installation of heavy strengthening such as bonded carbon-fibre plates or retrofitted steel frames. Anticipating penetrations for plumbing, electrical or ventilation ducts is the only way to preserve the structural safety of the structure right from the formwork phase.

Penetrations and embedments must be arranged and dimensioned in such a way as not to compromise the ultimate resistance, serviceability and durability of the load-bearing structure.

norme SIA 262

The basic rule for the formwork and reinforcement team is to systematically refuse the improvised placement of a sleeve in a tensile zone or in a bearing zone. In the span of a slab, the bottom layer takes up the maximum tensile stresses under the effect of bending. Cutting or pushing aside a bar at this location immediately reduces the effective steel cross-section calculated by the design office. Similarly, in the immediate vicinity of columns or load-bearing walls, the concrete is subjected to intense shear forces: a void created in this bearing zone sharply increases the risk of punching shear.

In the event of interference between the route of a building services conduit and main reinforcement, the chargehand must not cut the rebar with a disc cutter or roughly bend starter bars. The professional procedure requires suspending the installation of the service at this location and submitting a modification sheet accompanied by a dimensioned sketch to the site foreman or the construction manager. According to art. 365 CO, if any circumstance compromises the proper or punctual performance of the work, the contractor shall inform the client.

Impacts of penetrations according to their structural location
Location within the structureDominant main forcesConsequence of an unplanned penetrationMandatory measure on the construction site
Slab: mid-span (bottom layer)Maximum bending moments (tension)Failure of tensile steel, excessive deflectionTrimmer bars on either side and written approval
Slab: column perimeter (bearing zone)Shear force and punching shearLoss of bearing of compressed concrete, collapse riskStrict refusal of placement without complete recalculation
Wall: base of wall or shear wall cornerAxial compression and shearStress concentration, diagonal crackingAdditional edge stirrups required
Beam: central third of the spanAxial tension and pure bendingImpermissible weakening of the tension chordProhibition to cross the bottom half

Fixing, wedging and sealing of hollow inserts before concreting

Once the location has been validated by the civil engineer, the major challenge lies in rigidly holding the block-out or sleeve in place. During the pouring of fresh concrete and under the effect of the vibrating poker, penetrations are subjected to very strong hydrostatic uplift and buoyancy forces. A poorly secured plastic or polystyrene hollow insert will inevitably rise towards the surface, distorting the final level and drastically reducing the residual cover required by standard SIA 262.

  1. Rigorous setting out and markingTransfer centreline dimensions and external dimensions of the box or sleeve directly onto the clean formwork using a chalk line or permanent marker, checking technical riser alignments across several storeys.
  2. Installation of reinforcement strengtheningInstall the closed strengthening stirrups, links and diagonal bars specified on the drawing around the perimeter of the penetration to take up stress concentrations caused by the hole.
  3. Mechanical fixing to formworkNail or screw timber boxes or sleeve bases onto the decking. For wall penetrations, clamp pipes from one panel to the other using dedicated tie rods or internal props to resist lateral concrete pressure.
  4. Sealing and watertight closurePlug each end of the sleeve with a watertight cap clipped on or taped with reinforced adhesive tape. No cement grout must penetrate inside, otherwise future cable pulling could be permanently blocked.
  5. Stability check under vibrationCheck transverse wedging using annealed tie-wire locked onto adjacent stable reinforcement, never welding onto load-bearing bars without specific authorisation.
Watertight through-sleeve
Rigid prefabricated cylindrical device, equipped with a central anchoring flange ensuring water- and gas-tightness in reinforced concrete elements that are buried or subjected to groundwater pressure.

For elements cast against ground or subjected to water ingress, the sleeve must strictly incorporate a sealing flange or a hydrophilic swellable seal complying with structural waterproofing directives. The annular space between the reinforcement and the outer wall of the sleeve must ensure easy passage of the largest aggregate in the mix to avoid the formation of gravel pockets or voids beneath the penetration. Poor concrete compaction around a pipe creates a direct path for water and initiates corrosion of adjacent rebar.

Critical location: tensile zone, supports and reinforcement detailing

Locating a penetration or a sleeve is not merely a matter of coordinating plumbing or electrical runs. In a reinforced concrete structure dimensioned according to standard SIA 262, every void alters the resisting cross-section and redistributes internal bending and shear stresses. Placing a hollow insert indiscriminately amounts to severing load lines planned by the civil engineer, turning a building services opening into an incipient failure point.

The construction site rule requires identifying highly stressed sectors before marking openings on the formwork. Zones of direct bearing on pillars or walls concentrate shear forces and the risk of punching shear. Introducing a through-sleeve in this perimeter reduces the load-dispersion cone of the concrete and cuts transverse shear reinforcement (stirrups or link assemblies). Any routing conflict must be reported to the site management.

Structural behaviour according to penetration zone (standard SIA 262)
Zone of the elementPredominant forceMain risk linked to sleeveConstructive measure on formwork
Mid-span (bottom layer)Maximum bending moment (tension)Failure of load-bearing bars, excessive deflectionSpread bars without cutting or install anchored longitudinal trimmer bars
Support on wall or main beam (top layer)Support moment (surface tension)Through-cracking, water ingress, loss of continuityU-shaped top reinforcement or additional bars validated on drawing
Perimeter close to a pillarShear force and punching shearEarly shearing of concrete, brittle failureStrict refusal of openings within 2 times the slab thickness from the face of the support
Neutral axis in wall or beamModerate compression and shearLocal weakening of the concrete strutCrossed edge frames and diagonal distribution bars

According to art. 365 CO, the contractor is required to notify the client immediately if any circumstance compromises the proper execution of the work. Installing an unlisted large-diameter sleeve not shown on the formwork and reinforcement drawing provided by the engineer directly incurs the contractor's liability. No core driller or technical installer may unilaterally decide to drill through a compression strut or a tensile layer.

Reinforcement offsets, containment ties and written approval protocol

When a small penetration (plumbing sleeve or electrical box) intersects reinforcement, bars must never be cut with a petrol disc cutter or angle grinder to facilitate the passage of the pipe. The compliant technique consists in gently cold-bending the longitudinal reinforcement aside, maintaining a regular bending radius, provided the displacement does not create an excessive concentration of steel on adjacent bars.

  1. Joint check of the layoutMark the exact centreline of the sleeve on the formwork face using setting-out dimensions from the civil engineering and building services (MEP) drawings. Identify the stress zone.
  2. Supervised offsetting or interruption of rebarCrank continuous bars while maintaining regulatory cover relative to the sleeve. If a reinforcing bar must be interrupted, place parallel trimmer bars on either side of the void, with a calculated full anchorage length.
  3. Containment reinforcement and diagonal corner barsFit a closed mild steel link or perimeter stirrups around the penetration to take up stress concentrations at corners (so-called 45° moustache cracking).
  4. Rigid fixing and sealingNail or screw watertight blanking plates onto the formwork to prevent grout loss. Tie the pipe securely to the reinforcement cage with double tie-wire to prevent any movement under the pressure of the concrete.

Grouping several adjacent sleeves creates a continuous void comparable to an open floor opening. It is imperative to maintain a centre-to-centre distance of at least twice the diameter of the largest pipe between two parallel sleeves to allow full encasement and concrete compaction under vibration. If this clearance cannot be maintained due to building services space constraints, the steelfixer must install a strengthening stirrup enclosing the entire cluster in accordance with the design office instructions.

Managing placement deviations, omissions and unplanned openings

On a structural work construction site, a sleeve displaced by concrete pressure or a penetration omitted during formwork immediately creates a major technical conflict. Drilling or core drilling a load-bearing element without prior verification exposes the structure to severe damage, in particular cutting main reinforcement in the bottom slab layer or within the punching shear cone around pillars. Art. 365 CO para. 3 provides that if any circumstance compromises the regular or punctual execution of the work, the contractor shall inform the client. As soon as an omission or setting-out drift is noted, the chargehand stops all mechanical destructive work in the hardened concrete.

  1. Survey and locationIdentify the exact zone of the requested opening: check whether it is located in a tensile zone at mid-span of a slab, in a compression zone or on the perimeter of a critical support.
  2. Non-destructive detectionCarry out electromagnetic or ground-penetrating radar detection of the exact position of existing bars in order to establish a rebar avoidance plan.
  3. Submission to the civil engineerSend the core drilling sketch with dimensioned coordinates to the engineer. Await formal written approval, specifying any compensation measures.
  4. Implementation of strengtheningIf bars are cut, install the specified strengthening: bonding of carbon-fibre-reinforced polymer plates or addition of steel angle sections.

The cost of strengthening with bonded composites or steel sections is far higher than the initial incorporation of a wedged and sealed penetration box. Anticipation based on technical building services coordination drawings remains the only rational method. If demolition or drilling work endangers stability, CP punishes anyone who breaches the recognised rules of construction while directing or carrying out construction work.

Frequently asked questions

What should be done if a plumbing installer demands an unplanned core drilling in a slab bearing zone?

The site foreman immediately refuses the intervention. The bearing zone concentrates shear forces and punching shear stresses governed by standard SIA 262. Cutting rebar or reducing the concrete cross-section at this location directly compromises structural safety. Any opening requires a rebar detection plan and the prior written approval of the civil engineer, who will design a trimmer beam or retrofitted bonded carbon strips if necessary.

How do you ensure the tightness of a through-sleeve before the concreting stage?

The sleeve must be securely plugged at each end using threaded or push-fit watertight caps sealed with reinforced adhesive tape. Wall penetrations below groundwater level must strictly be fitted with a central hydrophilic swellable ring or flange fixed around the pipe in the middle of the wall. The pipe is firmly tied to the rebar to prevent displacement or uplift under the hydrostatic pressure of fresh concrete.

Is it permissible to slightly deflect a reinforcing bar to let a large pipe pass through?

Deflecting load-bearing reinforcement is strictly governed by standard SIA 262. A main reinforcing bar in a tensile zone must never be sharply cranked on site using a bending pipe. Any bypass around a penetration requires a gentle offset slope and, where necessary, additional containment ties at the bends to resist outward bursting forces. This path modification must receive formal written approval from the engineer.

Who bears the financial cost of structural strengthening after an omitted opening?

If the omission is caused by the masonry contractor who had validated penetration drawings in good time, the engineering fees, core drilling and installation of structural strengthening remain at its expense. Conversely, if the opening request results from a late modification to the route of building services by the design team, the additional costs are passed on to the client via a contract addendum prior to any slab sawing.

Texts and standards cited

  • norme SIA 262Design requirements and constructive detailing of reinforced concrete structures
  • CO art. 365Materials and site, obligation to inform the client in the event of circumstances compromising the work
  • CPBreach of the recognised rules of construction endangering life or limb