Key takeaways
- The metal external corner bead protects exposed corridor edges against mechanical impact.
- The paper-faced reinforced tape ensures total discretion on lightly exposed corners.
- Window reveals and jambs require a stop bead decoupled from the joinery frame.
- SIA 242 prohibits any visible localised bulge where the plaster meets the wing.
Selecting and installing the external corner bead according to the mechanical load
In heavily trafficked areas such as passages, stairwells or the corners of service shafts, a plaster edge left raw crumbles at the first contact with furniture. Mechanical protection relies on incorporating a perforated angle or a stiffened reinforced tape. The choice of component follows directly from the expected load and the required level of flushness. SIA 242 specifies the alignment and flatness requirements applicable to interior plasters and their junctions.
| Type of corner reinforcement | Recommended field of application | Required plaster thickness | Visibility after finishing |
|---|---|---|---|
| Perforated galvanised steel angle (round nose) | Thick gypsum plaster on masonry, high-traffic areas | 8 mm to 12 mm | Flush metal nose, perceptible in low light |
| Perforated aluminium angle with sharp arris | Thin skim coats, pillars and partition returns | 3 mm to 6 mm | Fine nose, can be concealed by careful smoothing |
| Reinforced tape with metal strip under kraft paper | Obtuse angles, light linings, lightly exposed living rooms | 1 mm to 2 mm | Invisible, perfect integration without bumps |
The recurring problem encountered on construction sites comes from the false plumb created when the plasterer blindly aligns the metal bead on a crooked masonry wall. If the load-bearing wall has a belly or a lean, the corner bead must be set with a laser or plumb line, leaving the thickness of plaster needed to make up the adjacent surface. Fixing is done with quick-setting plaster dabs spaced every 40 to 50 cm. For thin aluminium angles on board or under a thin undercoat, use mechanical crimping or embedding in a bedding plaster.
Treating window reveals, jambs and internal angles without cracking
Window reveals and jambs are sensitive points where materials with very different expansion coefficients meet. The outer edge of the reveal receives an external corner bead to withstand impacts when the sashes or interior blinds are operated. On the opposite side, against the subframe or the frame of the timber or aluminium window, applying plaster directly against the frame inevitably leads to a continuous separation over the course of thermal cycles.
- Positioning the self-adhesive stop bead with flexible lipStick a synthetic stop profile with a compressible foam strip and a self-adhesive protective flap, intended to hold the plastic masking film, around the perimeter of the frame.
- Setting the corner bead on the nose of the jambFit the metal corner bead in strict compliance with the splay specified by the execution drawings, checking perfect parallelism with the glazed frame using a calibrated gauge rod.
- Filling the opening with gypsum mortarSpray or lay the plaster between the internal stop bead and the metal edge using a corner trowel or a wide knife guided directly on the two reference ridges.
- Releasing the protective strip after dryingBreak off the tear-off strip of the stop bead after complete hardening to remove the protective film, leaving a perfectly calibrated elastic recessed joint along the joinery.
For internal angles or coves between two plaster walls of different types or at the wall-ceiling junction, using angle beads or forming a clean shadow gap prevents random cracking. If structural movement is feared, the stop bead defines a clean break or receives a flexible backing rod. The recognised rules of the trade require the gypsum plaster to be systematically decoupled from any structural element or rigid joinery in order to avoid the transmission of stresses.
Minimising the visual footprint of corner beads in high-quality finishing
Installing an external corner bead ensures the durability of an edge against everyday impacts, but this mechanical protection creates a local build-up. On an interior plastering construction site, the challenge is to eliminate the bump effect visible under raking light. The thickness of the metal or synthetic nose requires a perfectly spread plaster feather. To meet the requirements of SIA 242 for smooth surfaces of grades Q3 or Q4, the choice of bead directly determines the levelling time and the final discretion of the work.
| Type of profile | Nose thickness | Impact resistance | Required feathering width | Target finish (SIA 242) |
|---|---|---|---|---|
| Paper-faced tape with steel strip | Less than 1.0 mm | Medium (light furniture impacts) | 150 to 200 mm | Ideal for Q3 and Q4 on plasterboard |
| Standard perforated aluminium angle | 1.2 to 1.5 mm | High (standard circulation areas) | 250 to 300 mm | Standard for Q2 and Q3 on plaster blocks |
| Galvanised steel profile with wide expanded mesh | 2.0 to 3.0 mm | Very high (technical rooms, corridors) | 300 to 400 mm (screeded with a straightedge) | Thick gypsum plasters, Q2 recommended |
| Synthetic corner bead with fine drip edge | 1.0 to 1.2 mm | Good (corrosion-resistant) | 200 to 250 mm | Damp rooms, Q2 and Q3 |
For reception areas or walls washed by full-height glazing, the paper-metal reinforced tape is the most invisible solution. It has no rigid bead standing proud of the facing. It is bonded in a setting plaster pass, pressed with a corner knife or smoothing blade. Conversely, a conventional metal angle requires two passes of decreasing build, carried out with a blade at least 300 mm wide, in order to soften the break in slope between the top of the bead and the plane of the partition.
Stop beads and junctions: window reveals and special angle beads
The loads are not limited to the external corners of a corridor. Window reveals and jambs, subjected to the repeated vibrations of the sashes and to the thermal variations of the envelope, require specific technical profiles. Connecting gypsum plaster directly against a joinery frame without a suitable profile systematically produces a disorderly decoupling crack. Using self-adhesive junction beads with a compressible seal provides a clean, airtight and visually flawless termination.
- Stop profiles for joinery (APU type): fitted with a self-adhesive compressible foam tape and a flexible elastomer lip that absorbs the differential movements between the window frame and the plaster.
- Simple perforated stop beads: essential for delimiting the end of a plaster pass on a wall left as exposed raw concrete or for marking a clean stop before a flush skirting.
- Profiles for recessed joints (shadow-gap profiles): placed at the ceiling junction or along door frames without architraves, they create a deliberate set-back line of 5 to 15 mm avoiding any rigid contact.
- Flexible reinforced angle tapes: laid in internal angles between two light walls to guide the knife without locking the angle in a mass of crack-prone plaster.
- Preparing and bonding the jamb profileClean the window frame with a non-aggressive degreaser. Position the stop bead with its self-adhesive foam tape, checking vertical alignment with a plumb line or laser level. Apply uniform pressure along the full length to activate the adhesive.
- Applying the protective masking stripFold the detachable strip of the profile over the protective film of the window. This flap prevents soiling the finished joinery during spraying or manual application of the gypsum.
- Levelling the plaster on the revealFill the window reveal, bearing on one side on the nose of the external corner bead and on the other on the guide edge of the joinery profile. Screed the plaster with the straightedge held at an angle to obtain a rigorously flat splay.
- Releasing the tear-off stripAfter the plaster has stiffened and been fully smoothed in accordance with SIA 242, remove the detachable plastic strip in one continuous motion to reveal a clean, straight joint decoupled from the joinery.
Edge damage and non-conformities: methodical repair and dispute prevention
On a finishing-work construction site, sharp arrises are the areas most exposed to impacts from rolling scaffolding, lifting platforms or heavy handling. A distorted stop bead, a crushed external corner bead or a continuous crack along a window reveal caused by the lack of decoupling are immediate non-conformities with regard to the flatness requirements defined by SIA 242. When the metal nose is bent, no superficial filling can hide the defect under raking light: repair requires a clean cut and mechanical reconstruction of the substrate.
- Chasing out and cutting the damaged profileStrip the plaster on either side of the edge with a spatula over a width of 100 mm. Cut off the deformed metal wing with a nibbler or tin snips without damaging the board facing or the base coat on masonry, keeping the sound straight sections.
- Mechanical connection of the replacement profileFit a new section of the same external corner bead, carefully bevelling the ends to avoid any overlapping of thicknesses. Fix mechanically by stapling or by bedding in quick-setting plaster, checking alignment with a 2 m aluminium straightedge.
- Refilling and smoothing to the required tolerancesReapply the filling plaster in two crossed passes, incorporating a textile reinforcing tape over the transverse junctions, then level with a corner knife to the prescribed finish level before complete drying.
At jambs and window reveals, a rigid connection against the joinery frame inevitably leads to a break in the plaster film under the effect of thermal expansion. If the compressed foam seal or the stop bead with flexible lip was omitted during installation, the plasterer must cut a straight chase with a cutter blade over the full height of the reveal, vacuum the residual dust and extrude a compatible flexible sealant, ensuring the free expansion of the closing element.
Frequently asked questions
Can a crushed metal corner bead be straightened without replacing it completely?
No. Crushed aluminium or galvanised steel undergoes irreversible plastic deformation that creates a crack initiation point and weakens the protective nose. Straightening the metal with pliers leaves undulations that the plaster cannot hide without forming a ridge. The only compliant solution is to cut out the bent section with snips, butt a new straight element and re-plaster the area, respecting the alignments with the straightedge.
Why does a crack systematically appear at the junction between the window reveal and the frame?
This cracking comes from the rigid connection between materials with very different thermal expansion coefficients: the PVC, aluminium or timber of the window moves, while the plaster remains rigid. Without a decoupled stop bead or a junction profile fitted with a compressible sealing strip, plaster bonded directly to the frame breaks at the first variations in outside temperature or when the sashes slam.
How to correct a corner bead installed out of plumb without refilling the whole partition?
If the misalignment exceeds the tolerances accepted by SIA 242, local build-up is ruled out because it creates an unmistakable bump under raking light. Cut the embedding plaster with a cutter along the perforations of the wing, carefully extract the profile without tearing the board's paper facing, trim the facing edge with a plane, then reposition a new angle aligned with a plumb line before smoothing.
Is installing a metal bead on a sharp arris mandatory according to SIA 242?
SIA 242 requires protecting salient edges exposed to the usual mechanical loads in circulation areas and openings. Using a perforated metal profile or a reinforced tape with integrated reinforcement is the recognised rule for ensuring the durability of the edge. A sharp arris made solely of plain plaster is reserved for decorative cornices out of reach and is prohibited on regular passageways.
Texts and standards cited
- norme SIA 242Plastering, rendering, dry construction: geometric tolerances, substrate preparation and execution of interior plasters.
