Key takeaways
- The perforated board alone does not dissipate acoustic energy without the resistance of suitable mineral insulation.
- The integrated acoustic fleece prevents dust from falling and creates resistance to airflow.
- A high perforation ratio widens the absorbed frequency band, particularly in the voice frequencies.
- The wool thickness and the plenum height determine the absorption efficiency at low frequencies.
The mechanics of absorption: why the perforated board never works alone
On finishing work construction sites, installing a perforated ceiling meets the acoustic comfort requirements set by standard SIA 181. A classic mistake is to believe that perforated plasterboard absorbs sound simply by being there. In reality, a bare perforated board suspended under a slab absorbs almost nothing. It acts as an undamped resonator: the sound enters the holes, bounces off the concrete of the plenum and returns to the room without noticeable attenuation. To effectively reduce the reverberation time in classrooms, offices or canteens, the board must be part of a complete system combining perforation, acoustic fleece and fibrous insulation.
- Helmholtz resonator in a false ceiling
- Acoustic device combining a neck (the perforation in the board) and an air cavity (the plenum). The sound wave is dissipated there as heat when it meets suitable fibrous resistance.
The second element is the acoustic fleece, a non-woven fabric laminated to the back of the board in the factory. This technical textile provides specific resistance to air. When the sound vibration enters the perforation, the fleece generates viscous friction that dissipates a first part of the energy. It also conceals the inside of the plenum and retains dust. However, the fleece alone cannot absorb medium and low frequencies. Without a mineral wool blanket laid behind it, the ceiling resonates and does not provide the required attenuation.
| Configuration | Physical action | alpha_w index | Result in the room |
|---|---|---|---|
| Bare perforated board | Reflection off the upper slab | 0.15 to 0.25 | Strong reverberation, non-compliant with SIA 181 |
| Board with fleece only | Viscous surface friction | 0.50 to 0.60 | Medium absorption, low frequencies untreated |
| Board + fleece + wool | Complete thermal dissipation | 0.75 to 0.90 | Controlled and balanced acoustics |
Perforation ratio, fleece and wool thickness: building the complete system
The perforation ratio is the proportion of void created by the holes relative to the total surface of the board. In dry plastering, it generally ranges from 6% to nearly 20%, with round, square or slotted perforations, continuous or in blocks. A low ratio, below 10%, concentrates absorption on a narrow frequency, poorly suited to spaces open to the public. A ratio between 15% and 18% widens the absorption curve towards speech frequencies (500 Hz to 2000 Hz). The higher this ratio, the more easily the wave reaches the plenum to be dissipated by the insulation.
The thickness and density of the mineral wool placed in the plenum dictate the absorption efficiency at low frequencies, according to the objectives of standard SIA 181. Glass or stone wool 40 to 60 mm thick, with a density between 15 and 30 kg/m³, is enough to stabilise the acoustic curve from 250 Hz. Filling the whole plenum is unnecessary and would needlessly overload the metal suspension. The insulation is laid continuously over the profiles or boards, taking care to preserve a residual air gap in the plenum without compressing the wool.
- Checking the plenum and suspensionCheck the height under the slab and size the hangers to carry the build-up of boards and mineral wool without excessive deflection.
- Rolling out the mineral woolLay the 40 to 60 mm panels or rolls tightly butted on the secondary framework. Avoid any gap between the strips to prevent acoustic leaks.
- Screwing the perforated boardsFix the boards at regular centres. Align the lines of perforations rigorously with a string line or laser, taking care not to tear the fleece at the furring channels.
- Jointing and access hatchesTreat the joints without letting filler flow back into the open holes. Fit airtight hatches incorporating the same perforation and the same insulation blanket.
Execution on the construction site: laying the mineral wool and keeping the acoustic fleece intact
The acoustic behaviour of a suspended ceiling depends on the physical integrity of each of its components. The perforated plasterboard ensures acoustic transparency thanks to its network of openings, while the non-woven fleece heat-bonded to the rear face acts as the resistive element essential for dissipating sound energy. This fleece controls the resistance to airflow: if it is torn, pierced during screwing or soiled by filler runs during joint treatment, the local acoustic damping disappears. Installation therefore requires careful handling of the boards from unloading onwards. When cutting edges or openings for technical ducts, the fleece must be cut cleanly with a straight-blade cutter, without tearing or fraying, in order to maintain the uniformity of the absorbent surface across the whole room.
Above the board and its fleece, adding a mineral wool blanket turns the cavity into an effective sound trap. According to the acoustician's requirements or the bill of quantities, glass or stone wool with a density between 15 and 30 kg/m³ is used. The usual thickness varies from 30 to 60 mm depending on the space taken up by ducts. To play its role of dissipating medium and low frequencies, the blanket must never be forcibly compressed under a pipe or crushed against the concrete slab. The wool panels are butted edge to edge so that they fit tightly, laid directly on the metal framework or rolled out continuously. The slightest air gap between two panels creates a resonance channel that weakens the overall absorption coefficient of the build-up.
- Checking the plenum heightMeasure the clear distance between the back of the framework and the underside of the concrete slab. A plenum of less than 100 mm limits efficiency at low frequencies, even with dense wool.
- Cutting and laying out the insulation blanketsCut the mineral wool to the dimensions of the framework bays. Make precise notches at the hangers to ensure the strips lie perfectly flat, without tension or bulging.
- Controlled screwing of the perforated boardsFix the boards at strict centres using specific self-countersinking screws with a narrow head. Use a screwdriver bit with a depth stop to avoid tearing the facing and the rear fleece.
- Mechanical jointing without overflowApply the special filler using a cartridge gun or a suitable spatula, avoiding any backflow into the adjacent perforation holes. Brush off smears immediately before hardening.
Requirements of standard SIA 181 and frequency behaviour
As regards indoor acoustic comfort, standard SIA 181 sets precise requirements for the reverberation time in rooms open to the public, shared offices, canteens and teaching rooms. This reverberation time, expressed in seconds, depends directly on the equivalent absorption area of the ceiling in relation to the total volume of the room. A dry-lining plasterer cannot simply install a board chosen from a catalogue for its decorative appearance. The round, square or random perforation has a void percentage that must be coordinated with the presence or absence of the upper blanket in order to reach the design value targeted by the acoustician.
| Ceiling configuration | Void ratio | Behaviour at 250 Hz | Behaviour at 1000 Hz | alpha_w index |
|---|---|---|---|---|
| Standard perforated board without fleece or wool | 12 to 15% | Very low (reflection) | Poor (sharp resonance) | 0.20 to 0.25 |
| Perforated board with fleece only on the back | 12 to 18% | Low | Medium (limited porous effect) | 0.50 to 0.60 |
| Perforated board + fleece + 30 mm glass wool | 10 to 15% | Medium | Very good (continuous absorption) | 0.70 to 0.75 |
| Perforated board + fleece + 50 mm stone wool | 15 to 20% | High (resonator damping) | Excellent (wide band) | 0.80 to 0.85 |
As the test data show, the absence of insulation in the plenum causes a drastic drop in performance, particularly in the range of medium and low frequencies where the human voice is concentrated. Standard SIA 181 heavily penalises these spectral imbalances: a room whose ceiling absorbs only above 2000 Hz remains very reverberant, noisy and uncomfortable for understanding speech. In addition, the unperforated peripheral strips, generally left around the perimeter of the room over 100 to 300 mm to absorb layout tolerances, must be included in the overall calculation of the useful area. If cutting waste or excessive solid edges reduce the ratio of effective perforated area, the client may refuse acceptance of the work for failure to meet the contractual acoustic criteria.
Acoustic defects: diagnosis, rectification and handling of non-conformities
On a finishing work construction site, failure to meet the reverberation performance set by standard SIA 181 rarely stems from an initial calculation error, but almost always from a break in the continuity of the absorbent build-up. When an in-situ measurement reveals a reverberation time that is too high, the foreman must audit the work at three critical points: local absence of insulation, obstruction of the interposed fleece and lateral leaks from the plenum.
Forgetting the mineral wool behind the perforated boards is the most serious failure. Without this fibrous blanket, the Helmholtz resonator effect collapses at medium and low frequencies, turning the perforation into a simple ineffective resonant cavity. If the access hatches do not allow glass or stone wool panels to be slid in and spread with sufficient density over the whole surface, partial or complete removal of the screwed bays remains the only technical solution accepted by the site management.
Another frequent defect is unsealed cut-outs around technical ducts or against partition transoms. Air carrying sound waves rushes into the voids without passing through the porous material. The dry-lining plasterer remedies these failings by systematically sealing the cut edges with a flexible acoustic strip or a suitable acrylic sealant, ensuring the perimeter airtightness necessary for the balance of the plenum.
In the event of a dispute at acceptance of the work under standard SIA 118, a formal notice of defects obliges the company to prove that the wool thicknesses installed are compliant and that the prescribed perforation ratio has been maintained. Keeping the technical data sheets of the perforated boards and photographic records before the ceiling is closed are essential to clear the installer of responsibility in the face of later interventions by other trades.
Frequently asked questions
Can a perforated acoustic board be installed without any wool in the plenum?
Mechanically, installation is possible, but the ceiling will provide only marginal acoustic absorption, centred on a narrow frequency band. The rear fleece provides slight dissipation, but without a fibrous blanket to slow the particle velocity of the air, the overall absorption coefficient drops drastically. The work will not be able to meet the comfort or intelligibility requirements defined by standard SIA 181.
How do you repair an acoustic fleece torn during screwing or cutting?
A local tear exposes the plenum or the mineral wool and degrades absorption at that point. If the tear is spotted before final screwing, a patch of identical acoustic fleece should be bonded to the rear face with a spray adhesive without excess thickness. If the perforation is already visible or damaged on the facing, the board must be replaced by an intact one.
What minimum wool thickness should be provided above the perforated boards?
A thickness of 30 to 50 mm of semi-rigid mineral wool is generally enough to absorb the medium frequencies of the spoken voice, provided the plenum is at least 100 mm. To treat low frequencies in a conference room or classroom, the acoustician commonly specifies a thickness of 60 to 100 mm combined with a precise perforation ratio.
Why does the perforation ratio directly change the final acoustic result?
The perforation ratio, generally between 10% and 25%, defines the open area allowing the sound wave to enter the absorbent build-up. A low ratio shifts absorption towards low frequencies by increasing the vibrating air mass in each hole, while a high ratio widens absorption towards medium and high frequencies, which is essential for reducing the overall reverberation time.
Texts and standards cited
- SIA 181Noise protection in buildings: requirements for room acoustics and reverberation times.
- SIA 118General conditions for the execution of construction work: acceptance of the work and handling of notices of defects.