🧱 CFC 271Fire protection and acoustics of dry constructionChapter 10 of 10 in the section

Proving it ten years later: system data sheets, photos before closing and labels

A closed fire-rated dry-lining partition can no longer be checked destructively without ruining the work. You will learn how to structure the execution evidence step by step: preparing system data sheets for each room, taking time-stamped photographs of the framing and insulation before the closing board is fitted, and compiling the as-built file for the client.

Key takeaways

  • The time-stamped photograph taken before the last board is screwed on proves the internal build-up.
  • The system technical data sheet guarantees compliance with the AEAI RF1 class certificate.
  • Systematic recording room by room protects the plastering firm in the event of disputed acceptance of the work.
  • Handing the complete file over to the client discharges the plasterer's documentation obligations.

Building up the visual evidence before the last board is fitted

Once the last plasterboard facing is screwed on and jointed, the interior build-up of a fire-rated partition becomes completely invisible. Inspectors from the fire protection authority or representatives of site management can no longer check the metal framing, the stud spacing, the exact type of insulation or the number of underlying boards without destructive core drilling. Taking images before closing is the only technical means of certifying the conformity of the assembly without damaging the walls.

  1. Checking the first facing and the framingPhotograph the installed metal framing, showing the stud spacing measured with a tape measure, the insulating strips applied to the perimeter profiles and the perimeter fixings at the base and head of the partition.
  2. Checking the thermal and acoustic insulationFrame the whole bay filled with the mineral wool batt. The photo must show no voids between the studs, tight cutting around the openings and the manufacturer's marking visible on the panel.
  3. Recording the intermediate layersFor multi-layer partitions of type EI 60 or EI 90, record the fitting of the first layer of boards with its staggered joints and its specific screw fixing before the finishing facing is installed.
  4. Time-stamping and indexing the fileEnable geolocation and digital time-stamping on the site device. Name each image according to a fixed convention including the floor number, the room number and the structural axis on the plan.
Critical points to photograph before closing the facing
Building elementTechnical detail requiredVisual evidence required
CW/UW metal framingSpacing of 600 mm or 400 mmTape measure extended across two adjacent studs
Mineral woolNon-combustibility and thicknessManufacturer's label and continuous tight fit without gaps
Plaster base layerFirst-layer jointingScrew fixing at the required spacing and staggered joints visible
Structural work junctionResilient sealing stripJunction at the floor and at the underside of the concrete slab

Assembling the system file and handing over the data sheets by room

The traceability file is not just a series of scattered photos: it brings together all the technical elements linking physical execution to the administrative requirements of the Association of Cantonal Fire Insurance Establishments. For each separating element, the plasterer must present the declaration of conformity of the complete system, confirming the joint use of the boards, screws, reinforcing tapes, jointing compound and insulation material specified by the manufacturer holding the approval.

RF1 material according to AEAI requirements
Designates a construction material that makes no contribution to fire (non-combustible), certified under the Swiss fire protection regulations, and that releases no toxic smoke or incandescent droplets under standardised test conditions.
  • A copy of the approval certificate of the Association of Cantonal Fire Insurance Establishments for the partition or suspended ceiling concerned.
  • The technical data sheet of the complete system issued by the manufacturer of the cardboard-faced or fibre-reinforced plasterboards.
  • The environmental and safety data sheets of the rock or glass wool demonstrating the RF1 classification.
  • The location plan of the numbered rooms, annotated with the exact reference of each partition installed.
  • The register of time-stamped photographs filed by room number and date of execution.
  • The contractor's declaration of conformity signed by the technical manager of the plastering firm.

The complete file is formally handed over when completion of the works is notified to the client or their representative. This document is incorporated into the as-built records for the future maintenance of the building. Keeping a complete digital copy within the plastering firm for at least ten years protects management against disputes arising during later alterations to the premises.

Permanent labelling of the work and compliance with AEAI approvals

On French-speaking Swiss construction sites subject to the AEAI fire protection directives, fitting fire-rated boards and inserting mineral wool is not enough if the work cannot be formally identified after painting. Once the last reinforced plasterboard or calcium silicate board is screwed onto the metal framing, the whole interior build-up becomes invisible. Permanent labelling in situ is the direct link between the closed wall and the system data sheet in the technical file. Every EI 30, EI 60 or EI 90 separating partition, service shaft or suspended ceiling must bear an indelible marker. This plate states the AEAI certificate number, the manufacturer's exact system, the date of closing and the room number shown on the as-built plans.

Mandatory identification data for fire-rated plasterwork
Type of work carried outData required on the platePhysical location of the markingAssociated supporting document
EI 30 or EI 60 separating partitionAEAI certificate no., RF1 mineral wool, installer's name, dateTop edge of the door frame or ceiling voidTime-stamped photo of the filled framing and system data sheet
EI 60 or EI 90 vertical service shaftExact designation of the system, number of facings, dateInside face of the frame of the fire-rated access hatchDelivery note for the special boards and self-inspection report
Sealing of service penetrationsFire sealant reference, EI resistance class, dateImmediately next to the sleeve on the visible facingIntumescent sealant data sheet and close-up photo

To meet the AEAI requirements for RF1-rated materials, the foreman carefully checks the conformity of the associated consumables: self-drilling screws suited to the combined thickness of the facings, mineral reinforcing tapes and approved jointing compounds. Affixing the identification label to the metal stud marks the completion of the mechanical assembly and commits the firm to the conformity of an assembly that is now concealed.

Compiling the as-built file and formal handover to the client

According to the recognised rules of the SIA 118 standard and the general principles of the Code of Obligations applicable to latent defects, the plastering contractor's liability can be pursued long after acceptance of the work. A fully closed and painted dry-lining partition rules out any later visual inspection without heavy destructive probing. If a doubt arises several years after the works following a fire, an acoustic insulation failure or an unauthorised penetration made by another trade, the firm must prove that its original assembly was flawless.

  1. Gathering material evidence and system data sheetsCollect all the delivery notes proving the supply of the specific fire-rated boards and RF1 insulation. It is mandatory to attach the AEAI approval data sheet corresponding point by point to the geometry and performance of the room concerned.
  2. Rigorous indexing of time-stamped photographsFile the digital images by floor, by room and by partition reference according to the allocation plan. Each element must include an overall view placing the room in its context and a close-up showing the framing, the screw spacing and the continuity of the insulation.
  3. Drafting the certificate of compliant executionPrepare the formal declaration signed by the firm's technical manager, certifying that the framing, reinforcements, number of board layers and joint treatment strictly comply with the test reports and the fire protection directives.
  4. Formal handover against signature and archived duplicateHand the complete file over to the client or to site management at the acceptance stage. At the same time, archive a complete and tamper-proof digital copy on the firm's secure server to prevent any loss of documents.

Handing over this quality assurance file is a condition for obtaining the operating permit issued by the cantonal building police authority. By handing over a complete traceability file, the plasterer closes the construction site with absolute legal security: ten years after the finishes are completed, simply presenting the time-stamped photo showing the sealing and the fitting of the RF1 mineral wool before closing is enough to clear the firm of all liability.

Handling disputes and destructive opening where there is no evidence

A fire-protection dispute almost always arises after the event: during the conformity inspection by the cantonal fire protection authority, or during a technical audit years after the work was handed over. If the traceability file is incomplete, the doubt always favours public safety. Faced with a closed partition, neither the architect nor the inspector will sign off a record on good faith alone. The absence of time-stamped photographs showing the state of the framing, the mineral insulation and the internal sealing puts the firm in a critical position where the work is presumed non-compliant.

To limit costs and avoid stripping a partition completely, apply an agreed probing procedure. Propose to site management and the fire protection specialist one sample opening per room or per type of wall. Cut a clean window of about 30 by 30 centimetres between two vertical profiles, at mid-height and below the slab junction, in order to examine the insulation batt, the crimping of the studs and the resilient strip. Each probe must be recorded in a written joint inspection record, signed on the spot, noting the conformity observed.

Closing these probes again demands the same technical rigour as the original installation. It is not enough to fill the hole with plaster: metal splice plates must be screwed behind the existing facings to support the replacement piece, cut from a board identical to the approved system. The joints are then treated with the tape and compound recommended by the system data sheet, observing the setting times before repainting.

Always keep a complete copy of the as-built file in the firm's archives for at least ten years. The SIA 118 standard governs the rights and obligations of the parties at acceptance of the work. If the client mislays the data sheets or photographs handed over, the plasterer's ability to produce the original certificate, the AEAI approvals and the visual evidence protects the tradesperson lastingly against any late dispute.

Frequently asked questions

What should you do if the fire inspector refuses to approve a partition whose photos have been lost?

Without time-stamped photos taken before closing, the inspector cannot confirm the presence of the RF1 mineral wool or compliance with the stud spacing. You must arrange a representative destructive probe in the presence of the safety officer. A localised cut allows the board thickness and the insulation to be checked. Once conformity is confirmed in a record, close the opening with metal splice plates, wool and jointing finish conforming to the tested system.

Is a smartphone's metadata enough to prove the date a photo was taken?

Yes, the EXIF data embedded in digital files records the exact time, date and geographical coordinates of the shot. However, to guarantee indisputable evidential value before an expert, it is recommended to include a physical site marker in the frame: the room number marked on the framing, the floor plan displayed or a traceability label. Name and file these images immediately in the project's computer folder.

Who must sign the fire-protection certificate of conformity handed to the client?

The certificate of conformity must be signed by the person responsible for execution within the plastering firm, generally the project manager, the site manager or the master plasterer. The signatory binds the company's civil liability by certifying that the partitions, suspended ceilings and sealing were installed in strict conformity with the AEAI approvals and the manufacturers' data sheets. The document is then passed to the safety engineer.

Can a specified RF1 mineral wool be replaced by another thermal insulation?

No, any change to the nature, density or reaction-to-fire class of the insulation voids the AEAI approval of the system. A standard thermal insulation without RF1 (non-combustible) classification may melt or release flammable gases in a fire, destroying the fire resistance of the partition. The plasterer must install exactly the product named in the test report and keep its delivery note.

Texts and standards cited

  • SIA 118General conditions for the execution of construction work