🧱 CFC 271Interior plasters: substrates, coats and smoothingChapter 10 of 10 in the section

Protect before spraying: joinery, screeds, services and cleaning of overspray

By the end of this chapter you will be able to draw up a joint inspection record before spraying, choose adhesives compatible with joinery, seal electrical boxes and remove plaster splashes before they set, so as to avoid any dispute over adjacent work.

Key takeaways

  • A written joint inspection record made before work begins relieves you of responsibility for earlier scratches and impacts.
  • Masking tapes for powder-coated profiles must be removed without leaving residue, in accordance with the manufacturer's instructions.
  • Screeds and floors require an absorbent waterproof felt held in place by continuous overlaps with no gaps.
  • Plaster sprayed onto a finished frame is cleaned off with a clean sponge before setting begins.

Joint inspection record and watertight containment of joinery and screeds

Machine application of an interior plaster coat generates a mixing mist and splashes under pressure. Before setting up the spraying machine and unrolling the hoses, the drylining plasterer records the initial condition of the elements already installed by the other trades. Powder-coated aluminium window frames, timber joinery with factory finish, metal thresholds and window sills are examined carefully, by eye, in the presence of site management. According to art. 365 para. 3 CO, if a circumstance jeopardises the proper or timely execution of the work, the contractor informs the client.

Scratches on glazing, impacts on metal uprights or existing greasy stains are photographed, located room by room and listed in a signed joint inspection record before any preparatory work. Without this prior record, the plastering company bears the presumption of liability for every damage found at the final acceptance of the work.

Sheeting begins as soon as the condition record has been validated. External joinery and entrance doors require a polyethylene film at least 50 micrometres thick, fixed to the edge of the profile with a masking tape specific to smooth or lacquered surfaces. The use of aggressive site-type adhesives is prohibited on recent lacquer finishes, as adhesive may migrate or the paint film may be torn off when the masking is removed. The plasterer makes sure the film is laid without inward folds along the plastering edge, to guarantee a clean, sharp junction.

Choice of protection according to the type of adjacent work
Work to be protectedProtective materialType of adhesive or fixingPoints to watch
Powder-coated aluminium joinery50 µm PE film or electrostatic filmLow-tack Japanese paper masking tapeMust be removed within 15 days to avoid adhesive deposits.
Lacquered or oiled timber joineryStrong PE film with integrated feltLow-tack adhesive tape for painted woodTest the varnish's resistance on a masked area before application.
Cement or anhydrite screedAbsorbent non-woven felt backed with PE filmHeavy-duty cloth adhesive tape on the overlapsMinimum overlap of 10 cm between sheets, with no gaps at the foot of walls.

On the floor, the raw screed or technical raised floor must be protected from moisture and from encrusted material. A simple plastic sheet slips under the feet of mobile scaffolding and tears under the spray lance. The standard method is to lay a non-woven protective felt with a waterproof underside. The sheets are laid with a watertight overlap of at least ten centimetres, sealed with strong adhesive tape. This arrangement cushions falling lumps of plaster and prevents the mixing water from percolating into the substrate below.

Sealing off services and immediate neutralisation of stains

Electrical and sanitary installations are the second vulnerable area during spraying. The flush-mounting boxes for switches and sockets installed by the electrician must not receive any deposit of plaster. The drylining plasterer fits temporary red protective covers with fins or fills the recesses with closed-cell polyethylene foam. The ends of conduits and pipes left waiting in the lightweight partitions are sealed with watertight plugs or wide adhesive tape, to prevent any blockage by the mixing slurry.

During machine spraying, particles of plaster inevitably spill beyond the limits of the sheeting, blown by the hose air or when the lance is moved. The site supervisor organises the team in pairs: while the sprayer applies the plaster and the plasterer sets the straightedge, a fellow worker watches the surrounding work and steps in immediately in the event of accidental soiling.

  1. Removing the fresh massRemove the lump of plaster sprayed by mistake using a soft plastic spatula, never touching the finished surface with a steel edge.
  2. Washing with plenty of water, without rubbingImmediately soak the soiled area with a natural sponge saturated with clean water to dilute the binders before crystallisation begins.
  3. Rinsing and final wipingRinse with clear water from a second bucket free of gypsum particles, then dry the joinery with a clean, lint-free microfibre cloth.

According to art. 364 para. 1 CO, the contractor's liability is subject to the general rules of employment law, requiring careful and diligent execution. As soon as the smoothing phase of a room is finished, the masking of the edges must be removed before the plaster edge has fully hardened. This allows the break joint between the fresh plaster and the adhesive tape to be cut cleanly, avoiding chipping of the finishing coat along the door frame or window frame.

Installing passive protection: joinery, floors and technical recesses

Machine spraying of plaster generates a continuous wet mist and splashes under pressure that work their way into the smallest mechanical gap. On an interior plastering construction site, work never begins without rigorous sealing of the external and internal joinery, the screeds and the electrical or sanitary flush-mounting boxes. Window frames in powder-coated aluminium or varnished timber suffer irreversible damage if plaster laitance penetrates the sealing joints or attacks the surfaces by retaining water. A low-tack adhesive tape, specially formulated for lacquers and fine profiles, must always be combined with a polyethylene sheet at least one hundred microns thick to withstand lance impacts.

Protective materials and application criteria by type of adjacent work
Work to be protectedSpecified containment materialFixing method and precautions
Anhydrite or cement screedNon-woven protective felt with breathable waterproof membrane, or rigid waxed cardboardTen-centimetre overlap between sheets, bridged with wide waterproof tape; no penetrating mechanical fixings.
Powder-coated aluminium joineryTransparent stretch polyethylene film or electrostatic film with tape for delicate lacquerComplete edging without creases up to the frames; remove the adhesive tape before the adhesive hardens under UV.
Stained or oiled timber framesHeavy kraft paper or breathable micro-perforated film, doubled on exposed facesVery low-tack adhesive tapes, tested beforehand; do not use brown packing tapes.
Electrical boxes and sanitary manifoldsFoam sealing pads, temporary plastic covers with finsPushed in flush with the raw wall; mark their positions on the floor with grease crayon so they can be found after spraying.

Raw floors or flowing screeds require similar attention. Plaster spray on the floor forms a limescale crust that is difficult to scrape off and may compromise the adhesion of later levelling compounds applied by the screeders. The absorbent felt backed with a waterproof film on its underside prevents the passage of mixing water saturated with sulphate ions. At the foot of partitions, the protection runs up ten centimetres against the raw masonry to catch the plaster base and float smears without soiling the perimeter acoustic insulation strip.

For the embedded technical trades, junction boxes and recesses for fittings must receive temporary watertight caps. Without a cover, every corrugated electrical conduit becomes a receptacle for fluid mortar. When plaster fills a conduit, pulling the cables becomes impossible without destructive coring, which engages the direct liability of the plastering company at acceptance of the work.

Cleaning tolerances, chemical neutralisation and condition-record protocol

Calcium sulphate hemihydrate reacts on impact with metal oxides and varnished finishes. When a smear gets past the containment, it must be removed before crystallisation begins, that is within sixty minutes of application. Once the plaster has hardened, any attempt at mechanical scraping with a spatula or scraper tears off the powder-coating layer, scratches the float glass of insulating glazing or detaches the surface fibres of the timber. The method is to dampen the fresh drop with a natural sponge saturated with clear, lukewarm water, with no acid additive, then dry the area by gently dabbing with a microfibre cloth.

Dispute prevention rests on a joint inspection record drawn up before the spraying machine is brought onto the floor. Team leaders must methodically inspect the joinery frames, glazing, door thresholds and screeds already poured, in the presence of site management or the joiner. Every pre-existing scratch, impact mark or alignment defect is noted in writing and in a series of dated photographs attached to the site diary, in accordance with the general rules of the works contract under SIA 118.

  • Note micro-scratches and paint chips on delivered joinery before applying any masking tape.
  • Record any missing temporary covers on the electrical boxes supplied by the electrician.
  • Notify in writing any abnormal residual moisture in the screed that prevents laying a waterproof felt for an extended period.
  • Have the condition record countersigned by site management before the first machine mix.

When the protection is taken down at the end of the smoothing pass, the tapes are peeled off at an angle of forty-five degrees to the substrate, with a slow, continuous movement, to avoid tearing off the joinery finishes. A joint visual check at the end of the phase closes the work, confirming that the neighbouring surfaces are handed back without soiling or mechanical damage.

Plastering damage and disputes: what to do when protection fails

When sprayed plaster reaches unprotected powder-coated aluminium joinery or a timber frame, the setting kinetics turn the incident into technical damage. Hydrated calcium sulphate begins a mechanical bond with the surface micro-pores in less than forty-five minutes. If the spray has not been lifted off with clear water and a natural sponge before setting is complete, any later scraping tears off the varnish or irreparably scratches the powder coating. If a hardened smear is found, the team must immediately stop using metal spatulas and refuse the use of acid strippers, otherwise the chemical damage to the adjacent work will be made worse.

  1. Stopping work in the area and freezing aggressive strippingImmediately prohibit dry scraping with a filling knife. Using hydrochloric acid or abrasive pads on anodised or lacquered aluminium destroys the passive layer and makes the company fully liable.
  2. Written notification to site managementReport the damage by time-stamped email to site management before any third party intervenes. Attach close-up photographs showing the extent of the splashes and the condition of the delimiting tapes.
  3. Controlled soaking test on a sampleTest, on a masked area, a cotton wool compress saturated with lukewarm water held under stretch film for twenty minutes, in order to soften the crust without mechanical abrasion.
  4. Joint inspection record and costing of remedial workCall in the joiner who fitted the joinery to record the surface condition according to the rules of SIA 118, to determine whether technical polishing is possible or to approve replacement of a profile.

On floors and services, the discovery of hardened plaster residue in technical recesses or electrical boxes requires manual clearing with an industrial vacuum cleaner fitted with a non-marking polymer nozzle. If slurry has run under the edge strip of a floating screed, creating a rigid acoustic bridge, the formal agreement of site management is required to cut and vacuum out the gap before the floor coverings are laid. Strict compliance with the initial joint inspection record protects the applicator against being blamed for pre-existing damage.

Frequently asked questions

What should be done if plaster has hardened on a lacquered aluminium profile?

Never scrape the hardened smear with a metal knife or use acid. Good practice is to apply compresses soaked in lukewarm water, held under a gentle adhesive tape for half an hour, to soften the gypsum by capillary action. The residue is then removed by dabbing with a damp natural sponge. If the satin appearance remains altered, the polishing must be entrusted to a specialist engaged in agreement with site management.

How do you clear an electrical box filled with sprayed plaster?

Switch off the electrical supply before any work in the flush-mounting box. Do not use screwdrivers or pointed chisels, which cut the conduits or the pulled conductors. Break up the hardened plaster with light pressure using a hardwood or rigid plastic spatula, then immediately vacuum up the debris with a workshop vacuum cleaner. Clean the bearing edges with a dry microfibre cloth to ensure the cover plates can be fitted later.

Why draw up a condition record of the joinery before sheeting?

The joint inspection record fixes the state of the glazed frames and door/window frames before any mortar is sprayed. By recording in writing and in photographs the workshop scratches, transport knocks or existing fitting defects, the plasterer relieves himself of civil liability. Without this document validated by site management, any visible damage discovered at final unmasking will automatically be attributed to the plastering company at acceptance of the work under SIA 118.

Who is responsible for cleaning spray off a raw screed?

If the floor protection was not laid or proved defective, removing the lumps and runs is the sole responsibility of the plastering company. Cleaning is done with a floor scraper before complete drying, to preserve the adhesion of the future levelling compound. However, if the works contract did not include protection of the raw floor and the client refused this item, the removal costs are settled on a daywork basis under SIA 118.

Texts and standards cited

  • SIA 118General conditions for the execution of construction work