🧱 CFC 271Fire protection and acoustics of dry constructionChapter 1 of 10 in the section

Installing a fire-resistant partition: complete system, no equivalence and test record

This chapter gives you the method for installing fire-resistant partitions in compliance with VKF/AEAI approvals. You will learn to identify the inseparable elements of a tested system, to refuse unvalidated substitutions of supplies on the construction site and to complete the conformity record required for acceptance of the work without reservations.

Key takeaways

  • A fire-resistant partition forms an inseparable assembly tested in accordance with the VKF/AEAI fire protection directives.
  • Replacing a mineral wool or a specific screw with a third-party product voids the certificate of use.
  • Stone wool insulation must comply with the exact bulk density and the VKF/AEAI RF1 classification.
  • The record of the installed system commits the company and is a condition for the issue of the final occupancy permit.

The VKF/AEAI approval of a fire-resistant partition covers the complete system

In Switzerland, the fire resistance of a lightweight partition made of plasterboard or fibre-reinforced boards does not rest on the isolated performance of a single component, but on the thermal and mechanical behaviour of a system approved as a whole. The Association of Cantonal Fire Insurers (VKF/AEAI) issues a certificate of use on the basis of standardised furnace tests. The metal framing, the sheet thickness, the type of profile, the stud spacing, the type of plasterboard, the fixings, the jointing material and the insulation form an inseparable thermal assembly. As soon as one component differs from the manufacturer's test report, the EI 30, EI 60 or EI 90 rating ceases to exist, legally and technically.

VKF/AEAI RF1
Swiss reaction-to-fire classification designating a material that makes no contribution to fire (non-combustible), corresponding to Euroclasses A1 and A2-s1, d0, required for the thermal and acoustic insulation incorporated in certified fire-resistant partitions.

The ban on component substitution applies strictly to the mechanical fixings and the load-bearing framework. A screw for high-density plasterboard has a specific thread geometry and steel treatment to ensure retention at temperatures exceeding 800 °C. Using a standard screw for type A board causes the edge of the board to fragment as the temperature rises, leading to premature pull-off of the exposed facing and immediate exposure of the metal core. Likewise, a CW stud with a nominal thickness of 0.6 mm cannot be replaced by a lighter profile or one of different geometry without destroying the stability of the framing under thermal expansion.

The contractor is liable for the conformity of the materials it installs. Under art. 365 CO, the contractor is responsible for the good quality of the material it supplies. In the field of fire protection, delivering an assembly that deviates from the declaration of conformity constitutes a serious defect. In the event of a fire, breaching the recognised rules of construction exposes the persons carrying out the work to the criminal provisions punishing the endangerment of life or bodily integrity through failure to observe these rules, as set out in art. 229 CP.

Substitutable components, absolute prohibitions and drafting of the test record

The team leader and the foreman must know the real room for manoeuvre granted by dry-construction system manufacturers in their technical manuals approved by the VKF/AEAI. While some peripheral accessories tolerate standardised variants, the core of the work requires absolute fidelity to the system supplier's catalogue.

Substitution rules for lightweight fire-resistant partitions (EI 30 to EI 90)
System componentSubstitution statusConsequence for the approval
Facing boards (DF, F, acoustic, fire-resistant)Strictly prohibited to change brand or referenceImmediate cancellation of the VKF/AEAI certificate of use
Metal framing (CW studs, UW tracks 0.6 mm)Substitution permitted only if approved by the manufacturerLoss of the guarantee of mechanical stability in fire
Self-drilling screws and screws for reinforced boardsStrictly prohibited: certified type, length and pitch requiredPremature fall of the facings during pyrolysis
Internal RF1 insulation (mineral wool)Tolerance on the brand, strict compliance with material and densityThermal collapse if the melting point is insufficient
Jointing compound and tape (paper or fibre)Mixing is prohibited: compound tested with the boardEarly cracking and premature passage of hot gases
Resilient perimeter sealing stripReplacement possible with an equivalent RF1-certified productConformity maintained if fire resistance is demonstrated
  1. Checking deliveries and technical data sheetsCheck on the delivery note that the boards, metal profiles, bonding compounds and mineral insulation correspond strictly to the references stated in the VKF/AEAI certificate of the chosen system.
  2. Checking screw spacing and crossed layersObserve the prescribed screw pitch (often 250 mm for the outer skin and 750 mm for the underlying layers), and offset the horizontal and vertical joints between the different layers of plasterboard.
  3. Rigorous treatment of intermediate jointsFill the joints of each skin with fire-resistant compound, including the intermediate layers that are not visible, before applying the reinforcing tape to the final face.
  4. Drawing up the record of the installed systemComplete the manufacturer's execution certificate with the VKF/AEAI approval number, the precise location of the walls, and the signatures of the qualified installer and of the site management.

Checking critical components: the physical limits of the approved system

In a lightweight fire-resistant partition, each material has been tested in an accredited testing laboratory as part of an inseparable assembly. As soon as fire attacks the exposed face, the thermo-mechanical behaviour depends on the precise balance between the dehydration of the gypsum, the strength of the fixing network, the expansion of the sheet-steel profiles and the inertia of the internal insulation. Changing just one of these parameters destroys the technical conformity approval issued by the Association of Cantonal Fire Insurers.

Admissibility analysis of components in fire-resistant assembly under VKF/AEAI approval
System componentSubstitution statusDecisive technical requirementConsequence for the classification
Special fire-resistant plasterboardTotally prohibitedBulk density, glass-fibre reinforcement and additives of the certificate-holding manufacturerEarly mechanical failure, immediate loss of the fire rating
Mineral wool blanketSubstitution restricted to tested variantsMineral (rock) nature, certified minimum bulk density and VKF/AEAI RF1 melting pointThermal collapse of the insulating core, overheating of the unexposed face
Plasterboard screwsProhibited to modify spacing or geometryMinimum length ensuring anchorage in the framing, screw pitch for timber or metal framingShearing of the fixings during deformation at high temperature
Jointing compound and tapeProprietary system mandatoryJointing compound tested in the laboratory with the prescribed type of facingCracking of the junctions, passage of hot gases and flames
Metal framing profilesTolerance according to manufacturer's specificationMinimum galvanised steel thickness of 0.6 mm and flange width in accordance with the testExcessive buckling of the studs and loss of stability of the partition

The screws are another critical point. In a fire, the water vapour released by the plaster softens the core of the board at the fixings. The screw spacing specified by the certificate holder must be scrupulously observed, as must the minimum penetration depth into the metal or timber framing. An unsuitable screw pitch or a spacing arbitrarily increased to 35 centimetres instead of the tested 20 or 25 centimetres causes the boards to pull off under thermal pressure.

Responsibility of the installer and traceability of the installation record

The responsibility of the dry-construction plasterer begins the moment the partition is declared as a fire-resistant element in the execution drawings or the tenders. Under the Code of Obligations, the contractor is liable for the good quality of the material supplied and for the conformity of the work with the recognised rules of the trade. The cantonal fire protection authority or the municipal safety commissions accept the work only on the basis of an impeccable as-built file.

  1. Checking deliveries and technical data sheetsOn arrival at the construction site, check that the boards, metal profiles, screws, reinforcing tapes, compounds and mineral wools correspond exactly to the references cited in the VKF/AEAI certificate of the chosen system.
  2. Checking fixing pitch and sealingCheck the screw spacing before jointing and document with photographs the continuous installation of the RF1-class insulation, the perimeter sealing at the connections and any reinforcements to door frames.
  3. Closing the facings and treating the jointsApply the approved compound with the specified reinforcing tape, including on the underlying layers of multi-layer facings, in accordance with the approval requirements.
  4. Drawing up and signing the conformity recordComplete the company's installation certificate, stating the VKF/AEAI registration number, the exact reference of the manufacturer's system data sheet, the batch numbers of the products installed and the quantities concerned.

In the event of a fire or a dispute at acceptance of the work, the absence of a record or a falsified certificate deprives the work of its recognition. If a spot check reveals the presence of an unapproved mineral wool or the use of non-conforming screws, complete removal and total rebuilding of the partition can be demanded at the sole expense of the executing company. Rigorous compliance with the system approved as a whole is the only technical and contractual guarantee for the finishing-work professional.

Handling approval deviations and refusal of acceptance on the construction site

On the construction site, the discovery of an unapproved component immediately halts the issue of the certificate of conformity. When a subcontractor installs an uncertified mineral wool in place of the insulation prescribed by the VKF/AEAI conformity report, or when an installer uses standard screws instead of the fixings for dense boards, the partition loses its fire rating. The substitution strips the element of its qualification. The dry-construction plasterer can under no circumstances sign a conformity record attesting a correct installation if even a single element departs from the manufacturer's data sheet.

If the site inspector or the fire quality assurance officer of the site management refuses the work, the project manager must document the deviation. Two technical routes exist. If the product installed has an equivalent test report within the documentation of the same manufacturer, the latter may issue a specific technical assessment certificate authorising the variant. Without the explicit agreement of the holder of the system approved as a whole, no administrative regularisation is admissible. Zero tolerance applies to the VKF/AEAI reaction-to-fire requirements for RF1-category materials.

Without formal validation by the system supplier's technical department, complete rebuilding is required. For glass wool wrongly installed in an EI 60 partition requiring rock wool of defined bulk density, the team must remove the facing on one side, clear out the faulty insulation, insert the correct blanket in accordance with the specifications, then close up and redo the fire-resistant joints. For non-conforming fixings whose spacing or diameter does not comply with the approval, adding certified screws according to the official diagram is sometimes tolerated, subject to written approval.

The record of the installed system commits the direct liability of the company towards the client and the building authority. The doctrine of the SIA 118 standard on notices of defects requires any contradiction between the architect's drawings and the constraints of the certified system to be notified without delay, failing which the company must bear all the costs of dismantling and rebuilding.

Frequently asked questions

Can the prescribed mineral wool be replaced by an equivalent competing brand?

No. Even if the substitute wool has a VKF/AEAI RF1 class and an identical apparent density, its thermomechanical behaviour at high temperature may differ from that validated during the official laboratory tests. The ban on component substitution applies strictly. Only insulation explicitly listed in the VKF/AEAI recognition of the partition manufacturer is permitted. An unauthorised substitution voids the system approved as a whole and prevents the issue of the record.

What should be done if a batch of uncertified screws has been installed on a DF facing?

Substituting screws compromises mechanical strength under thermal stress and risks causing the joints to open early. The technical department of the manufacturer of the approved system should be consulted immediately. Depending on the configuration, the manufacturer may validate a complete intermediate re-screwing with the prescribed conforming screws, observing the minimum spacings in the VKF/AEAI report, before the joints are treated with the approved compound, thus avoiding the complete removal of the plasterboard.

Who must complete and sign the fire-resistance conformity record?

The record of the installed system is drawn up and signed by the foreman or project manager of the plastering company awarded the work. This document certifies on honour that the framing, the stud spacing, the fixing to the structural work, the type of insulation, the facing thickness and the treatment of the joints faithfully comply with the VKF/AEAI certificate for the work. It is forwarded to the fire protection authority to obtain the occupancy permit.

Can an ordinary jointing compound be used to finish a fire-resistant partition?

The compound is an integral part of the fire barrier of the facing. Using a standard compound not tested within the approved system leads to the immediate downgrading of the work. The VKF/AEAI fire protection requirements make it mandatory to use exclusively the jointing paste or jointing plaster specified in the manufacturer's technical report. In a multi-layer partition, filling the joints of the underlying layers also remains mandatory to ensure tightness against hot gases.

Texts and standards cited

  • norme SIA 118General conditions for the execution of construction work, duties of notification and handling of defects in the work