Key takeaways
- A service shaft without compartmentation acts as a chimney spreading flames from one floor to the next.
- Fire stopping at the level of each concrete slab guarantees the integrity of the building's vertical compartmentation.
- The RF1 plasterboard cladding must match the required fire-resistance class, often EI 30 or EI 60.
- Access hatches must have a VKF/AEAI certificate equivalent to the performance of the shaft.
Vertical compartmentation and stopping the thermal draught between floors
A service opening passing through several levels forms a direct air path inside the building. In a fire, this vertical volume generates a violent thermal draught: hot gases and toxic smoke rise at high speed, turning the shaft into a veritable chimney. If the shaft remains open between the floors, the compartmentation fails within a few minutes. The perimeter cladding carried out by the drywall plasterer only makes sense if the internal void is physically interrupted at each separating slab.
The horizontal fire stopping at each floor is carried out before the plasterboard lining is completely closed. Where the raw concrete slab has a through opening around sanitary or electrical pipes, the gap must be sealed. A rigid high-density mineral wool board is installed, coated with a certified intumescent sealant or paint, or a suitable fire-rated mortar grout is used. The plasterer makes sure that the perimeter joint between this seal and the sides of the structural work has no residual gap.
| Building use | Service shaft requirement | Reaction to fire of linings | Floor compartmentation required |
|---|---|---|---|
| Medium-height residential building (up to 30 m) | EI 30 or EI 60 | RF1 (non-combustible) | Mandatory at each floor slab |
| Office building | EI 60 | RF1 (non-combustible) | Mandatory at the planned fire-compartment level |
| Hospital accommodation facility | EI 60 or EI 90 | RF1 (non-combustible) | Mandatory with approved sealing |
Installing the fire-rated shaft and integrating the approved access hatch
The metal framework of a freestanding shaft, or one backed against an existing wall, rests on galvanised steel sections of the UW and CW type, sized according to the floor height. The floor and head tracks of the shaft receive a fire-rated sealing strip made of mineral wool or a certified intumescent seal. The structure must absorb potential thermal expansion without breaking the flatness of the system. The screwing of the studs and the stud spacing strictly follow the test report of the board manufacturer.
- Setting out and fixing the perimeter sectionsSet out the UW tracks on the floor and ceiling with a non-combustible RF1 isolation strip in between. Fix them mechanically into the concrete at the prescribed spacing.
- Erecting the vertical studs and trimmersInsert the CW sections at 600 mm or 400 mm centres depending on the tested system. Form a reinforced frame using CW or UA sections around the future access hatch.
- Checking the floor compartmentationCheck that the fire-rated sealing around the service risers is perfectly continuous before boarding the last face of the shaft.
- Fitting the fire-resistant liningScrew on the special fire-rated plasterboard (types F or DF) in one, two or three crossed layers. Stagger the horizontal and vertical joints by at least 300 mm between successive layers.
- Treating joints and sealsFill all joints and screw heads with the fire-rated filler appropriate to the system, without forgetting the careful pointing between the cladding and the adjacent masonry.
Inserting an access hatch is the most vulnerable point of the cladding. This hatch allows periodic access to shut-off valves or cleaning points, but it interrupts the continuous physical barrier of the plasterboard. It is therefore out of the question to install a simple standard aluminium frame with no fire-resistant properties. The hatch must form a laboratory-tested assembly, certified by a VKF/AEAI declaration of conformity corresponding to the fire resistance of the shaft, for example EI 30 or EI 60.
On the construction site, if the service openings through the slab have not been sealed by the structural work or building services contractors before your intervention, you must report the situation to the site management. Under art. 365 para. 3 CO, if a circumstance jeopardises the proper execution of the work, the contractor must inform the client. Closing a shaft without floor compartmentation conceals a major defect and directly makes you liable for the conformity of the finished work.
Continuity of fire resistance and treatment of penetrations through the cladding
The cladding of a service riser by the drywall plasterer is not limited to hiding drainage or supply pipes. As soon as an opening passes through several slabs without masonry fire stopping, the lightweight shaft becomes the sole enclosure of a vertical fire compartment. According to the fire protection regulations of the Association of Cantonal Fire Insurance Establishments, this shaft must provide a defined fire resistance, most often EI 30 or EI 60 in medium-height buildings, or even EI 90 for high-rise buildings or premises with particular risks. The metal structure and the linings must guarantee this tightness to flames and hot gases as well as thermal insulation, both from the inside of the shaft towards the occupied rooms and from the outside towards the shaft.
All components integrated in this service volume must belong to the VKF/AEAI reaction-to-fire category RF1, i.e. making no contribution to fire. This requires the exclusive use of glass-fibre-reinforced plasterboard of type F or non-combustible calcium silicate boards. Galvanised sheet steel sections at least six tenths of a millimetre thick form the load-bearing framework, mechanically fixed to the concrete structural elements. If a thermal or acoustic insulation blanket is placed behind the linings, it must be RF1 rock mineral wool with a melting point above one thousand degrees, free of any flammable organic binder or combustible vapour barrier.
The horizontal fire stopping carried out at each concrete slab stops the chimney effect. When plumbers or electricians pass through the vertical cladding to supply a floor, each penetration compromises the integrity of the wall. The plasterer must frame these openings using additional studs and cross-members. The annular space remaining between the lining and the sleeves or pipes must be sealed with a VKF/AEAI-approved system: intumescent acrylic sealant, fire-rated mortar or high-density mineral wool shells coated with ablative paint. No annular void is tolerated, as it would allow fire gases to pass immediately, before the sealing devices have reached operating temperature.
| VKF/AEAI class | Minimum lining (fire side) | Metal framework | Internal insulation required |
|---|---|---|---|
| EI 30 | 2 x 12.5 mm type F boards or 1 x 20 mm silicate | Single CW 50 studs at 600 mm centres | Optional, RF1 rock wool if there is an acoustic requirement |
| EI 60 | 2 x 15 mm type F boards or 2 x 20 mm silicate | Single or double CW 50 or CW 75 studs at 600 mm centres | RF1 rock wool, minimum thickness 40 mm, 40 kg/m³ |
| EI 90 | 3 x 15 mm type F boards or 2 x 25 mm special silicate | Reinforced CW 75 or CW 100 studs at 400 mm centres | RF1 rock wool, minimum thickness 60 mm, melting point > 1000 °C |
Rigorous integration and acceptance of the fire-rated access hatch
The presence of shut-off devices, meters or inspection traps in the riser requires an accessible opening to be provided. A standard access hatch represents a complete breach of the compartmentation. To maintain the continuity of the work, the opening must be closed by a VKF/AEAI-certified fire-rated access hatch whose fire-resistance class corresponds exactly to that of the service shaft (EI 30, EI 60 or EI 90). The leaf and its frame must come from a system tested in an accredited laboratory for thermal exposure on both sides.
- Forming the profiled trimmer frameDelimit the opening with double CW studs and horizontal UW cross-members firmly crimped or screwed. The framework must carry the self-weight of the hatch frame without deflection.
- Positioning and wedging the frameInsert the metal or fire-rated board frame into the opening. Adjust plumb and level to the millimetre using non-combustible fibre-cement shims.
- Perimeter mechanical fixingScrew the frame to the perimeter metal framework using the screws recommended by the hatch manufacturer, observing a maximum spacing of 150 to 200 mm between fixings.
- Sealing the perimeter gapPack the remaining space between the hatch frame and the lining boards with compressed RF1 rock mineral wool, then seal the rebate with an approved intumescent sealant.
- Checking the joints and closingCheck the presence and continuity of the intumescent strips around the rebate. Check that the square or cylindrical lock engages properly and that the smoke seal is compressed.
Completion of the cladding work on a service riser requires a systematic visual inspection before the finishing coats are applied. Corner joints and junctions with the raw concrete at ceiling and floor must be completed with plaster or fire-rated smoke-stop sealant. Finally, fitting a durable identification plate on the hatch frame and handing the completed VKF/AEAI certificate of conformity to the fire safety officer make the plastering company liable for the actual tightness of the compartment.
Handling non-conformities, notifying reservations and reworking the work
On the construction site, the service shaft is a critical point of the fire compartmentation. When a plumber or electrician passes through a cladding without an intumescent sleeve, or when a floor compartmentation has been damaged after the pipes were installed, the drywall contractor must never hide the defect by closing the linings. A void concealed without proper sealing spreads smoke and hot gases by chimney effect to the upper floors from the first minutes of a fire.
As soon as an unsealed penetration at the slab or a compromised through-fixing is found, the foreman stops the screwing operations on the bay concerned. He sends a written notice to the site management and records the reservation in the site diary, in accordance with the rules of standard SIA 118. Systematic photographic records of the slab penetrations before the RF1 boards are fitted protect the plastering company from any unjustified transfer of liability.
If a non-conformity is detected after installation, partial dismantling becomes unavoidable to remedy the area. The special RF1-classified plasterboard is carefully removed to expose the service penetrations. The through seals are then rebuilt using certified fire-rated sealing mortars or high-density mineral wool boards coated with an approved ablative paste. The linings are then refitted with staggered joints, with new treatment of the tapes and fillers to guarantee smoke tightness.
The clearing of reservations ends with the drawing up of a fire conformity declaration for the cladding and the fitting of the hatches. This document, sent to the cantonal or communal fire protection authority, makes the company liable for strict compliance with the approvals, thicknesses and fixings prescribed.
Frequently asked questions
Can a standard hatch be fitted with a fire-rated board added at the back?
No. Only prefabricated certified access hatches with a VKF/AEAI approval number are permitted in a fire-rated cladding. Improvising a standard hatch with a board screwed on the back guarantees neither the mechanical strength of the leaf under thermal pressure nor the tightness to combustion gases through the original intumescent seals. In a fire inspection, the work will be rejected immediately.
Who is responsible for carrying out the horizontal floor compartmentation in the shaft?
The allocation depends strictly on the contract documents of the file. The opening in the concrete and the main sealing of the opening generally fall to the structural work or to the building services trades for pipe penetrations. The drywall contractor ensures the perfect tightness of its vertical cladding at the perimeter of the raw slab and must never close up a gaping opening without a formal notification.
How should the fire-rated cladding be connected at a suspended ceiling?
The cladding of the service shaft forms a continuous compartment that must absolutely run up to the underside of the raw concrete slab. The drywall plasterer must never stop the fire-rated boards on the membrane of a standard suspended ceiling, even a demountable one. The suspended ceiling framework is then fixed against the RF1 lining of the riser, which has already been jointed.
What documentation must be handed to the site management at acceptance of the shaft?
The contractor issues a certificate of conformity for the fire protection system installed. This document certifies the compliant use of the cladding components, the RF1 class of the plasterboard, the VKF/AEAI approval reference of each access hatch fitted and the treatment of the joints. This file must include the photographs of the internal structures and joints taken before the final closing.
Texts and standards cited
- Norme de protection incendie AEAIDefinition of the requirements for vertical compartmentation, RF1 reaction to fire and fire resistance of service cladding
- Directives de protection incendie AEAITechnical requirements for escape routes, service shafts, fire-rated closures and certified access hatches
- Norme SIA 118General conditions for the execution of construction work, duty to notify, notification of defects and acceptance of the work