Surface water: slope, drainage and infiltration: the execution standard

Intended for team leaders and site foremen in external works, this section details the complete management of rainwater on private plots. From the initial slope towards the outlet to the final watering tests, you have access to the practical rules and applicable tolerances to keep water away from buildings, size surface structures and comply with municipal infiltration or retention constraints in accordance with SIA 318 and VSS standards.

  • 10chapters
  • 22 000words
  • 6sections in the training course
  • 60chapters in total

Key values to remember 5

norme SIA 318

1.5%

Minimum crossfall of a sealed surfacing according to trade practice

norme SIA 318

2.0%

Recommended slope for paved surfaces with sand or grit joints

norme SIA 318

150 mm

Usual minimum clearance between finished ground and finished interior level without a channel

norme SIA 318

50 mm

Reduced clearance permitted in front of accessible threshold if an efficient grated channel is installed

art. 68 OTConst

1.50 m

Maximum depth of an unshielded excavation without regulatory safety sloping

Scope of work of the landscaper and professional boundaries

Runoff and surface water management on private plots is the first line of defence against moisture damage affecting superstructures. The landscape contractor steps in right after the structural work to shape the slope profiles of the natural ground, lay permeable or sealed surfacings, and install linear collection structures. The primary objective is to channel rainwater away from facades, French door thresholds and protruding masonry at a respectful distance, ensuring precise profiling from the earthworks platform to the surface layer.

This technical competence stops strictly at the boundaries of adjacent trades. The perimeter drainage installed at the base of foundation footings against subterranean walls falls exclusively under building structural work (CFC 201). Similarly, the bituminous or synthetic waterproofing of roof slabs, underground car parks and basement courtyards is the responsibility of waterproofers (CFC 226). The landscape contractor does not lay any mortar-bonded tiles or paving stones, as these services belong to the tiler (CFC 282). Finally, underground drainage networks beneath foundation slabs and pressure supply pipes remain the prerogative of sanitary installers (CFC 250).

Any anomaly noted in initial altimetry data transmitted by the client, particularly a threshold level that is too low relative to the finished ground level or a lack of functional stormwater connection, calls for vigilance from the site foreman. In accordance with art. 365 CO, the contractor must report without delay any defects in the ground or received data that compromise normal water drainage or the durability of the entrusted work.

Execution logic: from hydraulic analysis to acceptance checks

The success of surface works relies on a logical execution sequence that the ten chapters of this section detail step by step. It all begins with absolute mastery of flow slopes and accidental counter-slopes at the base of buildings. Even before laying the first paving stone or compacting the gravel, grading the platform requires a regular longitudinal and cross profile calculated to prevent any stagnation along the rendering or perimeter insulation.

  1. Linear collection and threshold clearanceInstall channels, drainage slots and kerbs according to the traffic class provided for by VSS standards, while maintaining the essential water clearance in front of each glazed bay or access door.
  2. Underground drainage and volume managementLay base drains in filtering materials and direct flow rates towards infiltration structures on the plot or temporary retention regulated by a flow limiter.
  3. Network visibility and neighbourhood respectBring inspection chambers flush with the finished level of the lawn or surfacings, while ensuring no harmful overflow is caused onto neighbouring properties.
  4. Special cases and formal handoverTake into account the environmental constraints of emptying private basins, then validate the conformity of the work through a joint watering test recorded in a report.

Strict compliance with this chronological order guarantees methodical installation and prevents costly earthwork rework. When channels are set too late, or the absorption capacity of the subsoil has not been measured beforehand by an infiltration test, defects appear from the very first thunderstorms. Monitoring these datasheets allows site teams to anticipate execution pitfalls, apply correct levelling tolerances and ensure snag-free handover upon delivery of external areas.

📘 Chapters in this section 10

Surface water: slope, drainage and infiltration

Fall: minimum away from facades, reverse fall and water at the base of the wall

Master the minimum slopes to definitively channel rainwater away from sensitive facade bases.

Surface water: slope, drainage and infiltration

The drainage channel: position, width, load class and sinking grating

Choose the correct channel class to prevent sagging grates under vehicle traffic.

Surface water: slope, drainage and infiltration

Infiltrating on site: municipal requirement, permeability test and soakaway

Successfully infiltrate rainwater on the plot in accordance with municipal directives and permeability tests.

Surface water: slope, drainage and infiltration

Retain before discharging: retention volume, imposed discharge rate and overflow

Precisely calibrate the retention volume and permitted discharge rate towards the public network.

Surface water: slope, drainage and infiltration

Subsurface drainage: subgrade drain, drain gradient and actual outfall

Lay your road drains with the required slope towards a functional and controlled outlet.

Surface water: slope, drainage and infiltration

Water on the neighbour's property: aggravated runoff, liability and solution

Prevent neighbourhood disputes by blocking any aggravated runoff towards private property boundaries.

Surface water: slope, drainage and infiltration

The threshold: clearance above ground level, flush accessibility and drainage channel in front

Create flush thresholds without flood risk thanks to a suitable and high-performing channel.

Surface water: slope, drainage and infiltration

Manholes: position, accessibility after external works, and manholes buried under grass

Place inspection chambers judiciously to ensure easy clearing without disfiguring lawns.

Surface water: slope, drainage and infiltration

Pool water: chlorine, prohibition of discharge into the natural environment, and neutralisation

Evacuate swimming pool discharge water without infringing water protection legislation.

Surface water: slope, drainage and infiltration

Water test: surface watering, recorded puddles and report

Validate the conformity of your slopes through a joint watering test before signing the handover report.