🧱 CFC 411Section 4 of 610 chapters

Low walls, retaining structures and external stairs: the execution standard

Intended for team leaders, foremen and site managers in external works, this guide brings together the rules of good practice for successful landscaping level-change structures. It covers gravity retaining structures, small rockeries, gabions and steps on natural ground, incorporating systematic drainage, frost stability and strict compliance with property boundaries in accordance with applicable Swiss standards.

  • 10chapters
  • 22 000words
  • 6sections in the training course
  • 60chapters in total

Key values to remember 4

art. 68 OTConst

1 m 50

Maximum height of an unsupported excavation without special sloping

art. 23 OTConst

2 m 00

Fall height requiring a peripheral safety guardrail

norme SIA 318

80 cm

Minimum embedment depth to reach the frost-free depth on the Swiss Plateau

norme SIA 318

63 cm

Average target value of the stride equation for an external stair

Scope of application and limits of responsibility for the landscaper

Retaining and level-crossing works in external works (CFC 411) are subject to precise physical constraints. This section deals exclusively with self-supporting gravity structures or those subject to light loads, erected on the natural ground of a private property: dry-stone walls, gabions, masonry gravity walls, reinforced slopes and external stairs on grade. The objective is to stabilize topsoil or landscaped fills while ensuring immediate drainage of meteoric water, in accordance with the requirements of standard SIA 318.

A rigorous demarcation is required in relation to other building and civil engineering trades. As soon as a retaining wall exceeds the allowable limits for uncalculated pressure, supports heavy traffic surcharges or carries the loads of a building, the structure falls under structural work (CFC 211.1) and requires dimensioning by a civil engineer in accordance with standard SIA 261. Similarly, main excavation works with heavy shoring belong to CFC 201. Waterproofing of roof slabs or underground car parks falls under CFC 226, while the installation of bonded finishes on waterproofed slabs depends on CFC 282. The road and garden builder works on soft ground, without bonding mortar laid on a waterproofed screed.

The foreman's responsibility covers compliance with excavation geometry, checking the bearing capacity of the formation level and preserving personnel safety. In the presence of slopes deeper than 1 m 50, strict wall protection instructions apply immediately to prevent unexpected cave-ins.

Execution method: logical sequencing of chapters

The execution of a ground connection structure allows no improvisation. To guarantee profitability and durability on the construction site, the learning and application of techniques must follow the construction chronology of the landscaping project.

  1. Step 1: Diagnosis of earth pressures and property boundariesAnalysis must begin with official boundary demarcation and verification of neighbourhood rights (chapter V4-10). The magnitude of backloads, required drainage and geometric batter to be applied are then evaluated (chapters V4-01 and V4-08).
  2. Step 2: Base, anchorage and frost depthNo masonry structure can survive without a foundation footing protected against the destructive action of winter frost (chapter V4-04). Excavation depth and blinding concrete constitute the landscaper's ten-year guarantee.
  3. Step 3: Selection of the retaining systemDepending on the nature of the ground and the aesthetic finish, execution will focus on gabion cages with draining backfill (chapter V4-02), traditional coursed dry stone (chapter V4-03) or plant stabilization and slope rockery (chapter V4-07).
  4. Step 4: Finishes, steps and safety provisionsPedestrian traffic management requires stairs with ergonomic proportions and security against ice (chapter V4-05). Finally, mechanical protection via a drip-edge coping (chapter V4-09) and standardized railing fastening (chapter V4-06) complete the handover of the work to the client.

By reading through these practical datasheets in this order, field teams have clear technical benchmarks to avoid recurring defects: bulging gabion walls, thermal cracking due to missing joints, slippery steps or progressive earth sliding during the spring thaw.

📘 Chapters in this section 10

Low walls, retaining structures and external stairs

Earth pressure: height limit without calculation, rear drainage and wall inclination

Control earth pressure and install rear drainage to prevent the wall from overturning.

Low walls, retaining structures and external stairs

Gabions: tight filling, rear geotextile, settlement and wall bulging

Build perfectly straight gabions by bracing the facing to prevent bulging during backfilling.

Low walls, retaining structures and external stairs

Dry-stone wall: batter of the wall, courses, through-stones and wall holding without mortar

Course dry stone according to header rules to build a stable wall without mortar.

Low walls, retaining structures and external stairs

The foundation: frost depth, strip footing, minimum reinforcement and cracked wall

Cast your footing below the frost-free line to guarantee a foundation without concrete failure.

Low walls, retaining structures and external stairs

Outdoor stairs: lower rise, wider tread, drainage slope and frost

Calculate your treads and nosing slopes to ensure a walkable pedestrian path in wet weather.

Low walls, retaining structures and external stairs

External balustrades: fall height, fixing in a low wall and connection

Solidly anchor railing posts without cracking the masonry of the supporting low wall.

Low walls, retaining structures and external stairs

The slope: stable gradient, rip-rap, greening and sliding after a storm

Durably stabilize your road or landscape slopes using drained rockery and anti-erosion hydroseeding.

Low walls, retaining structures and external stairs

Long wall: expansion joint, regular vertical crack and joint position

Place expansion joints at the correct intervals to eliminate erratic vertical cracks on the facade.

Low walls, retaining structures and external stairs

The coping: cap, drip edge, slope and wall stained by run-off streaks

Install a functional drip-edge coping to prevent limestone staining and frost spalling.

Low walls, retaining structures and external stairs

At the boundary: boundary survey, permitted height, neighbour's consent and wall to be relocated

Check cadastral alignments and cantonal profiles before excavating against the neighbouring property.