🧱 CFC 411Low walls, retaining structures and external stairsChapter 2 of 10 in the section

Gabions: tight filling, rear geotextile, settlement and wall bulging

This chapter details the rigorous execution of low gabion retaining walls for external works. You will learn how to select the correct rock grading, manually place visible facings, install reinforcing tie rods to eliminate any risk of bulging, and insert a filtering geotextile on the rear face to guarantee the long-term stability of the structure in accordance with professional standards.

Key takeaways

  • The stone size must exceed the metal mesh size by at least fifty percent.
  • Filling executed in thirds allows for the methodical tensioning of the transverse reinforcing tie rods.
  • Careful facing placement limits the void volume and prevents harmful subsequent settlement.
  • The rear non-woven geotextile prevents soil ingress while ensuring essential water drainage.

Methodical filling and internal tie rods: neutralising the risk of deformation

Retaining gabions operate on the principle of a flexible gravity mass-weight wall. Visible deformation of the wire mesh cage, commonly referred to as a wall bulge, systematically results from a lack of internal wedging and a shortage of transverse connections. On construction sites, directly dumping rock from an excavator bucket creates uncontrolled void pockets. Under the action of earth pressure and the dead weight of the materials, these voids settle over time, causing the lateral buckling of the galvanised wire mesh panels.

Grading selection and compaction determine the final density and crush resistance of the structure. For a 50 by 100 mm mesh cage, crushed rocks must be hard and frost-resistant. A grading of 80 to 150 millimetres constitutes the reference standard. Stones that are too small escape under pressure, while oversized blocks generate significant air pockets that are detrimental to the density of the retaining structure. To neutralise any movement, the visible face requires a methodical manual arrangement: the rubble stones are laid flat, with their widest face pressed against the external mesh.

  1. Filling the first lower thirdManually place the facing blocks on the facade up to a height of thirty centimetres, carefully fill the core of the cage with graded rubble stones, and compact the residual voids.
  2. Installing the reinforcing tie rodsFix the original galvanised wire transverse tie rods between the front and rear faces at the first third, tensioning them slightly without deforming the mesh to bind the walls together.
  3. Successive passes and lid closureRepeat the operation up to the two-thirds mark with a second layer of tie rods, manually adjust the final stone course so that it slightly exceeds the top edge, and then bind the lid with steel staples.
Assembly anomalies on gabion cages and on-site corrective measures
Observed defectTechnical cause on construction siteImmediate corrective action
Frontal bulging of the meshInternal tie rods missing, slack or poorly spacedDismantle the upper third and install transverse tie rods every forty centimetres.
Settlement under the lidLoose filling without manual wedging or compactionReopen the cage, fill the voids with hard rock chippings and re-close under tension.
Escape of materialsGranular grading smaller than the mesh dimensionsRemove undersized stones and use a grading larger than the mesh opening.

Rear filtration and fines management: role of the geotextile according to standard SIA 318

Low gabion retaining walls ensure their stability through their mass and natural permeability, which instantly evacuates groundwater without generating hydrostatic pressure. However, direct contact between clean crushed rocks and natural ground constitutes the weak point of these landscaped structures. Without physical separation, infiltration water travelling through the upstream slope inexorably carries fine soil or silt particles into the interior of the cage. This continuous leaching clogs the lower interstices of the gabion and creates erosion cavities beneath the retained ground, causing differential settlement and the progressive tilting of the mass.

According to standard SIA 318 for external works, the interface between the soil and the rock requires a needle-punched non-woven polypropylene geotextile on the rear face of the cage. This synthetic filter fulfills a dual mechanical role: retaining the fine in-situ soil matrix while allowing percolating water to pass through to the draining rock mass. To withstand installation stresses, the geotextile must feature a suitable puncture resistance class, preventing any perforation upon contact with the sharp edges of the rubble stones during backfilling.

Non-woven geotextile filter
Permeable synthetic textile layer installed on the rear face of a retaining structure to block internal soil erosion while guaranteeing the free drainage of infiltration water.

On-site implementation demands constant execution rigor. The geotextile strip is unrolled vertically against the rear of the cage as assembly progresses, providing a minimum overlap of forty centimetres between neighboring strips. The sheet is temporarily fixed to the top edge to prevent it from slipping or wrinkling under the dumping of earth during backfilling compacted in twenty-centimetre layers. At the base of the wall, the geotextile is folded back over the drainage system, channeling flows towards the plot's drainage network.

Cage deformation pathologies: bulges, residual settlement and tie rod breakage

A gabion wall almost never fails through global tilting on its foundation; its failure takes the form of a progressive deformation of its metal structure, commonly referred to as a "bulge". This phenomenon results from the combined action of gravity on heterogeneous stonework and the lateral pressure of the retained earth. When the stones are not individually wedged with their flat face oriented towards the grid, or if the infill run-of-mine material contains an excessively high void ratio, the material spontaneously rearranges itself under its own weight. This internal settlement generates considerable horizontal thrust components on the side walls of the cage.

Internal tie rods made of galvanised steel wire or zinc-aluminium alloy act as anti-spreading tie links. If these transverse elements are omitted, poorly stapled or positioned at incorrect intervals, the electro-welded mesh flexes from the first third of the filling. The traction exerted by the dead weight of the rubble stones accumulates towards the geometric center of the meshes. The failure of an internal tie rod under the effect of a point load or dynamic settlement leads to an immediate and irreversible deformation of the front grid, forming a bulge that is impossible to rectify without completely emptying the cage.

Diagnosis of structural anomalies on retaining gabion cages
Observation on the structurePhysical mechanism involvedInitial execution defectOn-site corrective action
Localized bulging of the visible face (bulge)Buckling of the mesh under internal thrustExcessive tie rod spacing or tie rods not hooked onto load-bearing wiresDismantling of the area, installation of diagonal intermediate tie rods and repacking
Sagging of the cage top (depression)Rearrangement of rubble stones and closing of voidsGranular grading too disparate or lack of manual compaction during assemblyOpening of the lid, addition of rubble stones of the same nature and re-tensioning under staples
Tearing of the mesh at the staplesConcentration of shear stresses at the edgesIncomplete crimping of spirals or excessive pinching by excavator bucketReplacement of damaged mesh by binding a doubled and tied panel
Progressive forward plumb deviationDifferential settlement or hydrostatic pressureInsufficient draining foundation or clogging of the rear filterClearing of the rear backfill, restoration of the filtering layer and resumption of drainage

The selection of material grading from the quarry must strictly correspond to the mesh of the metal basket. For a standard mesh of 100 × 50 mm or 100 × 100 mm, the grading of the hard crushed rock (hard limestone, granite, gneiss) must be between 80/120 mm and 100/250 mm. The introduction of finer elements or unsorted excavation run-of-mine material is to be avoided: under the action of precipitation and freeze-thaw cycles, fine elements migrate to the base of the cage, creating a material deficit in the upper part and destructive swelling in the lower third of the retaining structure.

Rear interface, geotextile continuity and rise of the draining backfill

The interface between the retained natural ground and the gabion wall determines the durability of the structure against water influxes. Gabions naturally form a highly permeable structure, but this permeability becomes a trap if fines from the surrounding soil penetrate the cage. Without an adequate filtration screen, the natural soil is leached during storm rains, causing sinkholes behind the structure and clogging the rocky matrix of the wall. This is where the application of standard SIA 318 takes on its full meaning for the landscape builder: guaranteeing soil stability while maintaining a continuous filtering transition.

  1. 1. Deployment and temporary anchoring of the geotextile sheetUnroll the needle-punched non-woven geotextile starting from the top of the sloping excavation down to the subgrade. Maintain sufficient extra length at the top to allow final folding over the draining gravel. Lateral overlaps must scrupulously respect a minimum width of 30 to 50 cm to prevent any joint opening during the placement of the earth.
  2. 2. Synchronized filling of the cage and loadingBuild the cage in successive horizontal slices of 30 cm. After each 30 cm pass of well-arranged and wedged rubble stones, install the horizontal anti-spreading tie rods by firmly hooking them onto two adjacent meshes to distribute the stress. Check the horizontality of the tie rods before pouring the next slice.
  3. 3. Placement of the draining material at the rear of the cageDeposit a layer of clean draining gravel (washed gravel type 16/32 mm free of fines) against the back of the cage over a width of at least 30 cm. This transition prism prevents direct contact between topsoil or silty soil and the gabion stones, ensuring the rapid gravity-fed routing of infiltration water to the foot of the structure.
  4. 4. Compaction in successive passes without jarring the structureBackfill the rear in layers of 20 to 30 cm maximum thickness. Compaction must be carried out using light machinery (low-tonnage vibrating plate or tamper) while strictly maintaining a 50 cm unvibrated safety band directly behind the rear face of the gabion, in order to avoid applying hydrodynamic thrust that would deform the cage outwards.
  5. 5. Closing of the filtration system at the wall headFold the upper end of the geotextile over the draining prism to form a cap impervious to fine particles. Then cover with arable topsoil to a thickness of 20 to 30 cm for turfing or surface planting, in accordance with the landscaping prescriptions of standard SIA 318.

A well-constructed gabion forms a semi-rigid monolithic entity that dissipates soil stresses. Rigorous coordination between rock compaction, the locking of metal tie rods and the containment of fines by a suitable textile eliminates any risk of bulging and dispenses with heavy corrective interventions during the structure warranty period.

Repair protocols and correction of defects on deformed cages

When a gabion wall shows excessive deflection or wall swelling, technical assessment is required as soon as visual defects appear. Lateral deformation exceeding standard tolerances signals the failure or unhooking of internal tie rods under the combined thrust of stones and earth. Settlement at the head of the structure, often accompanied by visible cavities under the top mesh, reveals a granular layout defect during initial installation. Direct dumping without manual compaction or precise stone wedging creates unstable voids that eventually collapse under the dead weight of the wall.

  1. Unloading of rear backfillClear the filtering gravel at the rear of the incriminated basket to cancel the lateral thrust on the metal structure.
  2. Controlled emptying of materialsEvacuate the facing stones and central run-of-mine material in successive strata down to the level of the broken or deformed tie rods.
  3. Repair of transverse reinforcementsStraighten or replace the mesh panels, then install new rigid internal tie rods every thirty to forty centimetres of height, securely anchored to the opposite meshes.
  4. Restoration of the filtering barrierInspect the rear face to repair any torn geotextile, applying an overlap of at least fifty centimetres to prevent any subsequent migration of fine soil particles.
  5. Methodical reconstruction of the fillingRebuild the layers by manually placing flat stones on the facade, with their bedding face parallel to the ground, while compacting the core to eliminate air voids before the final stapling of the lid.

When settlement is stabilised without lateral deformation, leveling is carried out by opening the top panel and manually adding calibrated rubble stones to restore the course line. In the event of fine leaching linked to a failing felt, repairing the filtering interface on the rear face prevents the definitive decompression of adjacent land.

Frequently asked questions

How to correct a gabion that is beginning to bulge in the lower part?

The bulge signals the failure or lack of tie rods under the weight of the rubble stones. The backfill located at the rear must be excavated to eliminate horizontal thrust, then the cage dismantled from the top down to the deformed area. After straightening or replacing the panels, reinstall suitable horizontal metal ties, then reposition the stones manually in compact courses, eliminating interstices before carefully closing the structure.

What should be done if topsoil flows through the stones of the wall?

This flow proves the absence or tearing of the geotextile on the rear face. Fines from the natural ground then infiltrate between the aggregates of the draining backfill and pass through the cage. You must excavate the filtering material at the rear of the wall to press a continuous non-woven geotextile across the entire rear wall, ensuring a generous overlap between edges, before reconstructing the draining area with washed gravel.

Why has the upper level of the gabion subsided by several centimetres?

This settlement results from rough filling with a mechanical shovel without manual compaction in the core of the cage. Under the effect of vibrations and gravity, the rubble stones tilt and progressively fill internal air pockets. To remedy this unsightly sagging, open the lid of the upper cage, add hand-arranged rocks of identical calibre to restore the horizontal course line, then re-close the mesh by tight stapling.

What calibre should be chosen to avoid both internal voids and escape through the mesh?

The calibre must clearly exceed the dimensions of the cage meshes, for example 80/150 millimetres for a 50 by 100 millimetre mesh. Aggregate that is too large generates giant voids that are impossible to wedge, favoring settlement and deformation. Aggregate that is too small escapes through the mesh. The landscape artisan selects a tight grading and positions the most regular blocks on the visible facing.

Texts and standards cited

  • SIA 318Installations for external works