Skip to content
Website
🧱 CFC 411Low walls, retaining structures and external stairsChapter 7 of 10 in the section

The slope: stable gradient, rip-rap, greening and sliding after a storm

This chapter guides you step by step in sizing and consolidating a garden slope without the risk of scouring or landslides. You will learn how to determine the equilibrium gradient according to the exact nature of the soil, install self-stable rip-rap with its geotextile filter and establish plant cover with a deep root network capable of withstanding heavy stormy downpours.

Key takeaways

  • Profiling adapted to the nature of the ground prevents water saturation and shallow slips.
  • Standard SIA 318 sets out the requirements for earthworks and the stability of external slopes.
  • Gravity rip-rap requires a frost-free base, a sufficient batter and careful back-drainage.
  • Plant reinforcement combines a protective biodegradable mesh with native shrubs featuring taproots and spreading roots.

Determining the permissible gradient and installing rip-rap in accordance with standard SIA 318

Any excavation or filling for external works alters the mechanical equilibrium of the natural ground. During an intense summer storm, infiltrating water fills the soil interstices, which sharply increases its bulk density while creating pore water pressure that cancels out internal friction forces. If the slope angle exceeds the friction angle specific to the soil particles, a circular failure occurs and the upper layer slides downwards. Standard SIA 318 governs these landscaping earthworks by specifying the maximum permissible gradients without heavy shoring depending on the consistency of the soil encountered.

Equilibrium gradients and indicative limit angles according to the soil encountered in Western Switzerland
Type of dominant soilMaximum gradient ratio (H/V)Maximum indicative angleBehaviour under storm water
Sound, unfissured hard rock5:1 to vertical75° to 90°Virtually zero infiltration, heavy surface runoff
Well-graded compact moraine1:1 to 2:345° to 35°Good initial cohesion, sensitive to surface gullying
All-comer clean gravel and sand1:1.533° to 35°Highly draining, risk of rockfall if water scours the toe
Clayey silt and topsoil1:2 to 1:2.526° to 22°Swelling when wet, maximum risk of mudflow

When the layout of the plot requires cutting a steeper gradient than soil mechanics permit, a gravity rip-rap wall provides a rustic and long-lasting solution. For standard landscaping without traffic surcharge, limestone or granite blocks are laid dry, course by course. Stability depends exclusively on the mass of the stones, their mechanical interlocking and the batter applied to the face.

  1. Excavation of the subgrade and foundationExcavate a foundation trench below the finished ground level, taken down to the local frost-free depth, generally between 80 cm and 100 cm. Spread a blinding layer of lean concrete or unbound gravel compacted with a vibrating plate to a thickness of at least 20 cm.
  2. Laying the first course of blocksSelect the largest and widest blocks for the base course. Lay them using a sorting grab or an earthmoving crane, embedded one-third into the excavation, tilting them towards the upstream slope.
  3. Stacking with batter and staggered jointsBuild up successive courses while maintaining a batter of at least 15% to 20% towards the rear. Stagger vertical joints as for a masonry wall and wedge each element with trimmed stone chippings to eliminate any rocking play.
  4. Creation of the drainage mass and filterUnroll a non-woven geotextile over the excavated natural slope. Intercalate between the back of the rip-rap and the filter a clean granular material of 16/32 gauge at least 30 cm wide, connected to a perforated drain discharging water at the toe of the wall.

Retaining soil through soil bioengineering and deep rooting

On a slope kept as bare earth, the main risk lies in regressive erosion caused by concentrated runoff during stormy downpours. A simple ornamental lawn only develops a superficial root mat 5 cm to 10 cm deep, which proves insufficient to reinforce the soil in depth: rainwater saturates the sub-layer and the turf is torn off in entire sheets under its own weight. Biological stabilisation relies on the immediate combination of a biodegradable geotextile and native woody plants with vigorous root systems.

  • Purple willow or draping willow: a robust native bush producing an extremely dense root network that drinks pore water and fixes wet soil.
  • Bloodtwig dogwood: a vigorous suckering shrub developing a horizontal spreading root system that binds together the various strata of the fill.
  • Guelder rose or common privet: colonising woody plants stabilising limestone slopes while tolerating major variations in summer moisture.
  • Seed mixtures of grasses and legumes with deep fibrous rooting including creeping red fescue and white clover to cover bare soil within two weeks.

For installation, the slope profile must first be graded without bumps or hollows to prevent the formation of rills beneath the anti-erosion mat. The coconut fibre fabric is anchored at the top of the slope in a trench at least 30 cm deep which is backfilled and compacted, then unrolled from top to bottom with a 10 cm to 15 cm side overlap. The net is secured in the ground using trapezoidal metal staples or wooden pegs driven in at a rate of two to three pieces per square metre.

Interception of runoff water and crest drainage to ward off storms

During heavy storm events, slope failures almost never result from an inherent defect in the surface topsoil, but from a sudden rise in pore water pressure combined with concentrated runoff coming from upper plots. When water infiltrates down to the contact plane between the reworked layer and the compact natural ground or impermeable moraine subsoil, this plane becomes lubricated and forms a shear surface. Without rigorous management of surface flows at the top of the slope, no landscaping retaining structure, whether mineral or biological, can prevent the detachment of a slip surface.

  1. Creation of the crest interception ditchOpen a trapezoidal or triangular swale set back by at least one metre from the upper edge of the slope. This ditch intercepts upstream runoff sheets before they rush down the reworked slope and channels them to a stable outlet or a secure infiltration area.
  2. Installation of the geogrid or geotextile feltDeploy a high-permeability anti-contamination non-woven geotextile between the excavated natural ground and the fill body or rip-rap mass. This filter retains soil fines while allowing water to drain freely towards the toe of the structure, preventing the clogging of the drainage material.
  3. Implementation of the bedding layer and toe drainConstruct an embedding footing excavated in stable ground, tilted upstream. Install a perforated drainage pipe wrapped in washed filter gravel free of fines, connected to the plot's clear water drainage network, then compact the bedding layer with crushed all-comer material.
  4. Self-locking wedging of rip-rapPosition the blocks using an excavator, ensuring wedging on three distinct support points per block. The heaviest blocks form the lower base; their largest face rests perpendicular to the slope's thrust line.

Treatment of slip purges and combined stabilisation by bioengineering

After a devastating storm, immediate repair requires purging all destructed soil down to sound ground left in place. Directly filling the cavity with ordinary topsoil guarantees another collapse during the following rains. Repairing requires cutting the underlying ground into steps or horizontal terraces tilted inwards, to create failure ledges preventing any rectilinear shearing of the refill material.

Behaviour of slope soils and recommended stabilisation devices according to standard SIA 318
Geotechnical soil typeLimit stable dry gradientVulnerability to stormsRecommended combined retention technique
Compact gravelly moraine1:1 ratio (approx. 45°)Surface rill erosion, scouringLow toe rip-rap with biodegradable coir mat and hydroseeding
Sandy silt or loose soil2:3 ratio (approx. 34°)Rapid liquefaction, mudflow slideDrainage ballast steps, live wattle fencing and fascine bundles
Plastic clay or weathered marl1:2 ratio (approx. 26°)Swelling, mass sliding through loss of cohesionDeep spur drainage, vegetated timber cribs, staked willow cuttings

To permanently anchor a sensitive slope without relying exclusively on quarry stone, bioengineering exploits the complementarity of root systems. Ordinary grasses only offer a superficial root mat of ten to fifteen centimetres which slides with saturated soil. An open coconut fibre anti-erosion mat should be combined, anchored by hardwood stakes, with seeding of pioneer grassland species and the installation of deeply driven woody cuttings. Purple willow or bloodtwig dogwood cuttings, cut at an angle and driven perpendicular to the slope over at least fifty centimetres, act as living soil nails while actively pumping excess moisture out of the ground.

Procedure to follow in the event of a post-storm slide and intervention limits

When a summer storm saturates a freshly earthworked or poorly drained slope, failure most often manifests as detachment at the crest, a shear bulge at the toe or the subsidence of a row of rip-rap blocks. Facing this disorder, the site foreman must immediately neutralise the risk of regressive development before considering definitive repair.

  1. Securing and diverting surface flowsProhibit all access to the toe and crest of the slope. Open a provisional ditch with an excavator upstream of the crack to divert runoff water away from the detachment niche. Place a weighted waterproof tarp over the open area to prevent infiltration from subsequent rainfall.
  2. Purge and repair step earthworksAfter drying out, clear away the liquefied soil mass down to undisturbed sound ground. If the slope is to be rebuilt, excavate the substrate into successive steps tilted by at least two percent upstream to break the continuous sliding plane and anchor the new mass.
  3. Draining reconstruction and reinforced regreeningIntercalate an anti-contamination geotextile and rebuild the slope with a compacting frictional granular material in thirty-centimetre lifts. Install a three-dimensional biodegradable mat pre-seeded with pioneering shrub species, or rebuild the rip-rap on a drained footing.

The landscape constructor intervenes on land shaping, vegetated slopes and low retaining rip-rap integrated into private green spaces, in accordance with the provisions of standard SIA 318. When a slide threatens a carriageway, a building, or if the height difference exceeds the limits of unreinforced structures without stability calculations, the intervention strictly falls under the remit of a geotechnical firm and a civil engineer. Heavy shoring, nailed walls or reinforced concrete retaining works fall outside the scope of the trade.

Frequently asked questions

How to quickly stabilise a silty slope before an announced rain front?

On bare silty soil exposed to erosion, immediately unroll jute or coir fabrics stapled with at least three metal pins per square metre. Dig a provisional discharge swale at the crest connected to a stable outlet to prevent runoff from gully-eroding the slope. In the event of a steep slope exceeding one-to-one, placing a polyethylene sheet weighted down with tyres protects the site until work resumes.

When should cyclopean rip-rap be preferred over a plant mat?

Rip-rap is necessary when available space requires building a steeper slope than two-to-three in low-cohesion soil, or when resurgent groundwater inflows prevent root fixation. If the footprint allows maintaining a slope between one-to-one and one-to-two, the combination of a three-dimensional geogrid and hydraulic seeding of shrub species remains technically more flexible and more economical in the long term.

What ballast grading should be chosen for wedging a rip-rap slope?

For the rear wedging and base of a gravity rip-rap, strictly use clean crushed gravel of the 40/80 or 60/120 millimetre fraction, free of fines. This angular matrix mechanically locks the blocks through internal friction while ensuring immediate permeability. Rounded gravel or earthy all-comers are formally prohibited as they roll under load, quickly clog and generate destabilising hydrostatic pressures behind the wall.

Can site excavation soil be reused to form a new slope?

Reuse strictly depends on the geotechnical nature of the materials. Clean sandy gravels compact perfectly as structural fill in successive layers. Conversely, plastic silts, heavy clays and stripped topsoil on the surface must never serve as slope fill bodies. Topsoil is reserved exclusively for surface grading to a maximum thickness of ten centimetres over an already stable structure.

Texts and standards cited

  • norme SIA 318External works: requirements for earthworks, low retaining structures and surface greening

In the same section