Key takeaways
- The fifteen-metre safety perimeter around the brushcutter prohibits any third-party intrusion.
- The mesh visor always complements sealed safety glasses and must remain closed throughout the rotation.
- Cut-retardant trousers instantly jam a chainsaw chain through the stuffing of synthetic fibres.
- Contact with the upper quarter of the guide-bar nose triggers a violent kickback towards the operator.
Brushclearing: mark out the projection radius and lock the face protection
On private land or along road edges, a brushcutter rotor hurls gravel, wood splinters and metal fragments at speeds exceeding one hundred kilometres per hour. The kinetic energy transmitted to the aggregates is sufficient to shatter glass panels, puncture bodywork or cause irreversible eye injury. The Ordinance on the Prevention of Accidents and Occupational Diseases requires the employer to apply recognised technical and organisational measures to eliminate any danger to personnel and site users.
The team leader delineates a strict exclusion zone with a fifteen-metre radius around the worker. In the presence of stony slopes, road gravel or stabilised base layers, this ricochet exposure distance increases downslope. Pedestrian access must be barred by barrier tapes, temporary signs or lightweight construction site barriers. As soon as a colleague or resident approaches to give an instruction, the operator immediately disengages the throttle and cuts the engine speed before any communication.
| Exposed body part | Required equipment | Risk neutralised during operation |
|---|---|---|
| Eyes and face | Mesh visor and sealed safety glasses | Direct projection of stones, dust and plant particles |
| Hearing system | Ear defenders mounted on a headband or helmet | Continuous exposure to high thermal engine speeds |
| Lower limbs | Protective leg guards or reinforced trousers | Impact of stones thrown under the deflector guard |
| Feet and ankles | High-cut safety boots with rigid uppers | Sliding on a slope and direct impact against a hidden stump |
Chainsaw and cutting tools: mastering cut-retardant trousers and kickback
In landscaping work, felling small trees, pruning woody shrubs and cross-cutting sleepers require handling chain saws. The major risk lies in accidental contact between the sharp teeth and the lower limbs or upper body. In accordance with Swiss occupational safety legislation, the use of cut-retardant protective trousers is mandatory for anyone holding a chainsaw in hand, even for an intervention lasting just a few seconds.
- How cut-retardant textiles work
- The textile complex contains successive layers of very long, ultra-resistant synthetic threads. When the chainsaw cutters slash the outer fabric, they tear out these fibres, which immediately wrap around the drive sprocket. The mechanism jams abruptly in a fraction of a second, stopping the chain before it reaches flesh and arteries.
- Chain brake checkCheck the manual triggering of the front hand guard and its engagement by inertia with the engine stopped, then check the firm locking at fast idle on a log.
- Checking tension and sharpeningEnsure that drive links do not hang below the guide bar and that depth gauges are adjusted according to the manufacturer's instructions.
- Identifying the recoil zoneNever attack wood with the upper quarter of the guide-bar tip, which is the sector that generates the mechanical phenomenon of violent kickback.
- Stable posture and arm lockingWork with feet firmly anchored on the ground outside the cutting axis, gripping the front handle with the thumb firmly locked under the tube.
Brushclearing along private road edges and green spaces: managing projections and locking facial protection
On an external works site, the line or metal blade brushcutter turns foundation gravel, concrete chips and loose soil into ballistic projectiles. Thrown by a tool spinning at full speed, these hard bodies retain enough kinetic energy to pierce a glass pane, riddle the bodywork of a parked vehicle or severely injure a passer-by and members of the installation team.
The Accident Prevention Ordinance requires the employer to take all necessary provisions to protect personnel and third parties. In residential areas or near private roads, the safety perimeter is not presumed: it is enforced by physical marking consisting of cones, barrier tapes and temporary warning signs. As soon as someone enters the clearance zone, the machine operator releases the throttle and brings the engine down to idle until complete evacuation.
| Terrain configuration | Dominant ballistic risk | Retention device | Organisational measure |
|---|---|---|---|
| Slope along paving or asphalt | Razor-sharp ricochet on hard surface towards the roadway | Protective tarpaulin or mobile technical textile panel | Complete stop when pedestrians or vehicles pass |
| Planted bed on compacted gravel | Ejection of stones and raw mineral fragments | Original tool guard obligatorily in place | Preliminary visual raking to remove loose stones |
| Glass facade edge or metal fence | Direct impact causing broken glass or paint chips | Stone guard net held by a second equipped worker | Preferential use of a short nylon line head |
Adjustment cutting and cross-cutting: mastering kickback and wearing cut-retardant trousers
In landscaping work, petrol or battery-powered chainsaws are frequently used for coppicing trees, adjusting solid wood fencing or cutting retaining sleepers. These cutting phases on the ground or on a sawhorse directly expose the worker to the risk of chain kickback, the most violent and sudden accident in the profession.
- Chain kickback
- Violent and uncontrollable movement of the guide bar being thrown upwards and backwards, caused by attacking wood with the upper quarter of the bar tip or by pinching the chain during a cut.
To block this movement before the cutters reach the face or thorax, the motor reflex relies on the inertia chain brake. However, at the level of the lower limbs, only passive textile armouring can prevent amputation or fatal haemorrhage of the femoral artery. Cut-retardant trousers constitute the final inescapable mechanical safeguard whenever the tool is started.
- Thumb lock: the left hand must grip the front tubular handle while imperatively keeping the thumb locked underneath, so that the wrist mechanically triggers the hand guard in the event of a kick-up.
- Proscribed attack zone: never start a cut with the upper quarter of the guide-bar nose; cuts must be made at the pulling point or in controlled pushing with the base of the bumper spikes.
- Stable workstation: spread feet, bend knees and keep the engine offset to the right side of the body's median axis, never working at arm's length or above shoulder height.
- Integrity of safety trousers: high-tenacity fibres jam the drive sprocket through immediate jamming; trousers that are cut, torn or washed with aggressive solvents lose their stopping power and must be uncompromisingly discarded.
In accordance with the guidelines of the Federal Coordination Commission for Occupational Safety and the directives of the Swiss National Accident Insurance Fund, the use of cutting machines requires specific operator training. The Machinery Safety Ordinance requires the permanent maintenance of original protective devices: removing a brushcutter guard to lengthen a line or neutralising a chain brake constitutes a serious breach of construction site management.
Management of cutting incidents and emergency procedures on site
An incident on a landscaping site always occurs due to the breach of a basic instruction: a third party crossing a marked zone, a stone expelled by the cutting line or a chainsaw chain rubbing against a concrete kerf. As soon as an impact or abnormal contact occurs, the operator cuts the engine. Crisis management requires a methodical reaction to preserve the physical integrity of the team and secure the material situation.
- Immediate freeze of the area and rescueCut the engine and place the machine on the ground. In the event of bodily injury, provide emergency first aid and alert health rescue services. Never resume work with a machine whose protective guard is cracked or whose chain brake exhibits abnormal resistance.
- Joint inspection record of projectionsIf a shard has hit a neighbouring vehicle or glass pane, measure the exact distance between the cutting point and the impact. Photograph the condition of the brushcutter's lower guard, the cutting tool used and the safety perimeter signage before moving any equipment.
- Scrapping cut equipmentAny cut-retardant trousers whose protective fabric has been grazed by chainsaw cutters must be removed from service the same day. Severed or frayed blocking fibres no longer guarantee any stopping of the sprocket upon a second contact.
In accordance with the Accident Prevention Ordinance, the employer documents every dangerous event in the site logbook. The safety officer analyses non-compliance with the projection perimeter or the pivoting of the guide bar in the critical zone in order to adapt daily instructions. If a mesh visor has let dense dust through or if a worker has lifted their face shield to breathe, the equipment must be supplemented with sealed safety glasses suited for external work.
Frequently asked questions
Does a mesh visor alone protect the eyes sufficiently during brushclearing?
No. The mesh visor stops large gravel and wood splinters, but it lets fine dust, pulverised quartz fragments and sap projected at high speed pass through. To comply with the Accident Prevention Ordinance, the operator must wear sealed safety glasses under their mesh visor and must never lift their screen while the cutting head is rotating.
What minimum safety distance should be adopted around a line or metal blade brushcutter?
The fundamental safety perimeter is at least fifteen metres on flat, clear terrain. In the presence of gravel, concrete kerbs or on a slope descending towards a roadway, stone projections can reach forty metres. The landscaper must then prohibit passage, deploy mobile stone guard nets or suspend rotation when pedestrians pass.
Can cut-retardant trousers be mended after superficial contact with the chainsaw?
No. The principle of cut-retardant trousers relies on internal layers of long synthetic fibres designed to wrap around the sprocket to instantly stall the motor. If the chain has slashed the protective fabric, the fibres are severed or stretched. Ordinary stitching blocks the sliding of the protective fibres. The garment is technically destroyed and must be replaced without delay.
How to avoid chainsaw kickback when cutting roots or stakes?
Kickback occurs when the upper quarter of the guide-bar nose comes into contact with hard wood, a stone or metal. The operator must always saw with the lower part of the guide bar, pulling the machine against the wood. They must keep the left thumb locked under the tubular handle and never cut above shoulder height.
Texts and standards cited
- OPARegulations on protective measures and installations as well as the use of personal protective equipment against occupational accidents
- OTConstRegulations on workstation safety, safe use of site machinery and protection against projections and falling materials
