🧱 CFC 411Earthworks, foundation and compactionChapter 1 of 10 in the section

Excavation depth: depending on usage, pedestrian, vehicular, and in-situ soil

Excavating an external works surface requires adapting the foundation thickness to actual loads and ground conditions. This chapter guides you step by step to determine the required excavation depth, from pedestrian paths to vehicular access ramps. You will learn how to dimension the formation level according to Swiss standards and ensure the reliability of your sub-bases.

Key takeaways

  • A pedestrian path requires twenty to thirty centimetres of excavation compared to forty to sixty for a vehicular area.
  • Standard SIA 318 governs landscape architecture while VSS standards set road structures.
  • The bearing capacity of the subgrade directly dictates the thickness of unbound granular material and the addition of a geotextile.
  • The formation level must feature a minimum cross-fall to drain water before placing the layers.

Foundation thickness: from pedestrian path to vehicular garage ramp

The classic mistake on a construction site is opening a platform to a uniform depth without considering the intended use of the surfaces. Failures occur quickly: settlements under wheels, disjointed slabs, rutting or water stagnation. The SIA 318 standard governs landscaping and pedestrian external works, while the VSS standards regulate the dimensioning of pavement structures subjected to vehicular traffic. The total excavation depth corresponds to the sum of the heights of the finished surfacing, the bedding layer and the unbound granular foundation layer.

Indicative excavation depths according to operational load
Surface usageType of loadingSurfacing and bedding layerFoundation layerTotal excavation
Garden path and pedestrian terracePedestrians, wheelbarrows, light lawnmowersSlabs or pavers 4 to 5 cm on a 3 to 5 cm sand or grit bedding layerUnbound granular material 0/32 of 15 to 20 cm22 to 30 cm
Private vehicular accessPassenger cars, occasional delivery vansConcrete pavers 6 to 8 cm on a 3 to 4 cm crushed grit bedding layerUnbound granular material 0/45 of 25 to 35 cm35 to 45 cm
Garage ramp and heavy traffic areaHeavy vehicles, fire engines, manoeuvres with marked slopeInterlocking pavers 8 to 10 cm on a 3 to 4 cm bedding layerUnbound granular material 0/45 of 35 to 50 cm45 to 65 cm

The specific case of the garage ramp requires increased vigilance. In addition to vertical loads induced by repeated vehicle passage, the slope generates considerable tangential forces during braking and acceleration. If the sub-base is too thin or poorly restrained laterally, the surfacing slips down the slope. For a ramp, the excavation depth systematically integrates a reinforced foundation layer of at least forty centimetres, supplemented by a toe restraint and concrete kerbs wedged against any horizontal displacement.

Ground bearing capacity and frost susceptibility: adapting the excavation level

Theoretical thickness values are only valid on a rigid and stable foundation soil. When the excavator reaches the bottom of the excavation, the bearing capacity of the in-situ soil dictates the next operations. On clayey, silty or water-saturated soil, the formation level deforms under the bucket: the bearing capacity is insufficient to directly receive the foundation gravel. If 0/45 gravel is compacted on a plastic soil without precaution, fine particles from the ground rise into the granular structure by pumping, destroying the mechanical qualities of the structure.

  1. Complete stripping of topsoilScrupulously remove topsoil over its entire organic thickness. No humus or root residue must remain beneath the footprint of future paved areas.
  2. Check of subgrade bearing capacityVerify the deformability of the formation level by passing a heavy machine or by plate loading test according to VSS standards. On moving soil, carry out an over-excavation of ten to twenty centimetres.
  3. Interposition of a separation geotextileDeploy a needle-punched non-woven geotextile over the entire formation level as soon as the supporting soil is silty or clayey. The geotextile prevents mud intermixing and maintains the integrity of the gravel.
  4. Execution and compaction in layersSpread the unbound granular material in successive layers not exceeding fifteen to twenty centimetres of compacted thickness, watered if necessary to achieve optimum density with a vibrating roller.

Frost susceptibility also modifies the excavation depth according to altitude and the local climate of the plateau or alpine zones. Water-logged frost-susceptible soil swells under the action of frost and lifts pavers. The total granular structure must ensure sufficient clearance to drain rainwater away from the active surface.

Preparation of formation level and check of bearing capacity according to VSS standards

Opening the excavation is not limited to reaching a theoretical level. The excavation bottom, called the earthworks formation level or subgrade, constitutes the direct bed of the entire mineral assembly. VSS standards governing the dimensioning and construction of private and public roads require that the bearing capacity of this formation level be checked before any addition of unbound granular material. If the underlying natural soil is soft, clayey or water-saturated, its resistance under the load of a delivery truck or manoeuvring car proves insufficient. The site foreman must then determine whether soil replacement, lime treatment or the interposition of a separation geotextile is required to prevent punching shear.

For a pedestrian pathway or garden terrace, loading remains static and very low. A compacted soil featuring a modest deformation modulus is generally sufficient to guarantee the absence of differential settlement, provided topsoil has been completely stripped. Conversely, an access ramp to underground garages concentrates vertical efforts as well as significant horizontal shear forces generated by vehicle braking and acceleration. On this type of structure, the formation level must be trimmed with rigorous precision, respecting the definitive slope to ensure gravity drainage of infiltration water beneath the foundation.

Bearing capacity requirements and corrective measures according to the structure's destination
Surface allocationTargeted deformation modulus (ME)Nature of earthworksSoil / foundation interface device
Pedestrian pathway, terrace on sand bedAbout 15 to 20 MN/m²Stripping topsoil down to sound soft soilOptional non-woven geotextile depending on soil fineness
Parking space for light vehiclesAt least 30 to 35 MN/m²Clean excavation, purging of compressible pocketsSeparation geotextile of adapted resistance class
Garage ramp, shared vehicular roadAt least 45 to 50 MN/m²Reinforced earthworks, strict slope profilingAnti-contaminant non-woven geotextile or geogrid

Compliance control of the formation level is routinely carried out on site using the static plate load test or light dynamic plate test. If the values prescribed by VSS standards are not met, mechanical compaction of the formation level with a vibrating roller or heavy plate must be repeated. If the soil creeps under the effect of the roller due to excessive moisture content, laying a choking layer of coarse crushed rock armouring of 40/80 grading or reinforcement with a tridimensional geogrid makes it possible to reconstitute a stable platform without excessively deepening the excavation.

Execution of base layers and slope management according to standard SIA 318

Standard SIA 318 sets professional rules relating to external works, floor coverings and landscape masonry structures. Once earthworks are validated, adding foundation materials must be carried out sequentially. For a vehicular access ramp, unbound granular material type 0/32 or 0/45 is spread in successive passes not exceeding 15 to 20 centimetres in thickness before compaction. Carrying out the foundation in a single thick pass inevitably leads to a compaction defect at the bottom of the layer, creating delayed settlement under repeated axle passage.

In the case of a pedestrian path, the foundation fulfils a levelling and surface drainage function. Clean recycled gravel or 0/32 limestone gravel compacted to about ten centimetres provides a durable support for the paver or slab bedding layer. Conversely, for a garage ramp whose gradient frequently exceeds 10%, earthworks and stonework must incorporate special provisions to counter the progressive sliding of the sub-base structure. The excavation bottom must not feature any abrupt step likely to trap runoff water beneath the surfacing.

Management of underlying water remains inseparable from earthworks. Standard SIA 318 recommends a crossfall or longitudinal slope of at least 2 to 2.5% at the earthworks formation level to drain infiltrations towards the sides of the structure or towards a drainage bed. Without this precaution, water stagnates in the unbound granular material, causing loss of cohesion of fines during rainy periods and destructive frost-heaving in winter.

  1. Setting out and level tracingStaking out the footprint with precise indication of finished levels and calculation of deductions for each layer according to the layout plan.
  2. Selective excavation and disposalComplete stripping of loose soils, extraction of excavation materials down to the earthworks formation level and verification of bottom regularity.
  3. Verification and compaction of the formation levelVisual inspection of soft areas, compaction of the formation level with a roller or vibrating plate and laying of the anti-contaminant geotextile fabric.
  4. Placement of foundation by passesSpreading unbound granular material in regular layers with additional watering and methodical compaction to refusal before levelling the bedding layer.

Management of bearing capacity hazards and remediation on the formation level

On site, discovering a soft area, a pocket of residual topsoil or water-saturated soil directly calls into question the excavated formation level. Continuing to spread the foundation without treating this heterogeneity exposes the structure to rapid differential settlements, which are particularly destructive under the dynamic loads of a vehicular ramp. According to SIA 318 standard, any anomaly noted in the natural ground compared to initial bearing capacity assumptions must be subject to appropriate remediation before laying foundation gravels.

  1. Purging of compressible lensExcavate the degraded area until finding stable and sound ground, without trying to compensate for the defect by over-compaction which would aggravate the displacement of plastic fines.
  2. Laying a separation geotextileDeploy a non-woven fabric on the remediated excavation bottom to prevent contamination of base layers by fine subsoil particles under the action of frost and traffic.
  3. Replacement with imported gravelBackfill the over-depth in successive passes of non-frost-susceptible crushed gravel of 0/45 grading, methodically compacted with a vibrating roller or heavy self-propelled plate.
  4. Bearing capacity compliance checkVerify the compactness and deformation modulus of the platform according to the criteria prescribed by VSS standards before authorizing the placement of the bedding layer.

The remediation requirement directly depends on the surface destination. On a pedestrian path, soil with mediocre bearing capacity can be stabilized by a geotextile and a foundation layer increased to twenty-five centimetres without disproportionate extra cost. Conversely, on a garage ramp subjected to the regular passage of delivery vans, no compromise is tolerable. The slightest sagging of the formation level breaks pavings, opens joints and promotes infiltrations. Careful purging and replacement with draining gravel remain the sole guarantee of durability in compliance with SIA 318 standard and VSS standards.

Frequently asked questions

How to react if the soil remains elastic despite repeated compaction?

An elasticity phenomenon under the vibrating plate indicates a water-saturated soil or one rich in sensitive clays. Continuing compaction worsens the situation by pumping water up via capillarity. The solution consists of stopping machinery, removing surface water inflows, then stripping the softened upper slice. You then compensate for this excess thickness with clean crushed gravel type 0/45 separated from the excavation bottom by a geotextile, in accordance with VSS standard requirements.

Can excavation depth be reduced if the formation level is sound rock?

On sound and non-weathered rock, gross bearing capacity largely exceeds SIA 318 standard requirements. Foundation layer thickness can then be reduced, as the risk of structural subsidence disappears. However, imperatively maintain sufficient excavation to integrate paver thickness, three to five centimetres of bedding layer, and a minimum crushed regulating layer of at least ten centimetres to ensure levelling and transverse drainage of the structure.

Must a geotextile be laid over the entire earthworks of an access ramp?

Laying a non-woven geotextile fabric is essential when the in-situ ground contains silts or water-sensitive clays. It plays an anti-contaminant role: it prevents underlying soil from migrating into the granular skeleton of the foundation under traffic action. On naturally draining and load-bearing sandy-gravelly soil, the geotextile is not required by SIA 318 standard, except to stabilize cut slopes or purge areas.

What to do if torrential rains flood the excavation before laying gravels?

Stagnant water must be pumped out without delay without circulating at the bottom of the excavation to avoid churning up mud. Let the formation level dry out in the open air. Once the surface has drained, check soil cohesion with a spade. If the top five to ten centimetres have turned into loose paste, strip them carefully before spreading gravel. Laying a foundation on liquefied ground leads to inevitable settlement under vehicular load.

Texts and standards cited

  • norme SIA 318External works: dimensioning requirements, soil bearing capacity, slopes and foundation layer execution
  • normes VSSTechnical specifications relating to earthworks, bearing modulus and compaction tests for traffic routes