Planting, watering and living soils: the execution reference manual
Intended for team leaders, foremen and site managers in CFC 411, this guide covers the agronomic restoration of construction site soils, tree and shrub planting, turf establishment and watering networks. Applying JardinSuisse guidelines and SIA 318 standard, it establishes execution methods to ensure plant survival, control water expenses and sustainably protect adjacent surfaces against root damage.
- 10chapters
- 22 000words
- 6sections in the training course
- 60chapters in total
Key values to remember 4
12 m³
Minimum pit volume for a large canopy tree in a restricted environment
40 cm
Minimum subsoiling depth to break up the compaction pan of a construction site
2 %
Minimum raw soil grading slope to ensure surface water drainage
50 cm
Minimum legal planting distance for a hedge with a maximum height of 2 metres
Scope of work for the landscaper and site interfaces
The success of a landscaping project depends on a clear boundary between the structural work trades and the external works trades CFC 411. On private plots in Western Switzerland, the landscape contractor handles the reconstitution of the soil profile, plant layout, installation of permeable surfacings on a granular bedding layer, and the implementation of automated surface or drip irrigation systems. These interventions require precise technical coordination right from the general excavation phase to prevent the permanent asphyxiation of living horizons.
Under art. 365 CO, the landscape contractor must immediately notify site management of any compacted ground, soil contaminated with hydrocarbons or ground unsuitable for plant survival before beginning topsoil placement. According to art. 18 OLED, upper and underlying soil horizons stripped during previous phases must be fully recovered on the plot or through an authorised disposal channel, without mixing with mineral excavation spoil.
| Work element | Responsible trade | CFC 411 responsibility (Landscaping) | Pivot standard |
|---|---|---|---|
| Building excavation and walls | Structural earthworks contractor (CFC 201) | Acceptance condition report and final grading | SIA 118 standard |
| Load-bearing walls and concrete slabs | Masonry / Civil engineering (CFC 211.1) | Unreinforced gravity retaining walls < 1.20 m | SIA 318 standard |
| Roof waterproofing complex | Specialist waterproofing (CFC 226) | Filter layer, plant substrate and planting | SIA 318 standard |
| Water supply and backflow preventer | Sanitary installations (CFC 250) | Downstream solenoid valve, drip lines and sprinklers | SVGW guidelines |
| Stripped topsoils | Structural earthworks contractor (CFC 201) | Agronomic inspection, spreading and loosening | Waste Ordinance |
Execution order and methodical breakdown of the ten chapters
The chapter sequence follows the operational chronology of a successful landscaping project. Carrying out planting without having restored the physical and biological properties of the soil inevitably leads to plant decline and disputes over the survival guarantee. Each step technically conditions the next, from subgrade diagnosis to the first-year completion maintenance.
- Support soil regeneration and pit geometryChapters [V5-01] and [V5-02] cover the mechanical loosening of underlying horizons compacted by the passage of excavators and trucks, as well as the volumetric sizing of tree pits, root collar positioning and guy wire installation in accordance with SIA 318 standard.
- Plant material selection and water managementChapters [V5-03] and [V5-04] address the planting schedule, the strict distinction between wire-basket root balls and bare roots, JardinSuisse warranty criteria, and then the sizing of micro-irrigation networks programmed with a moisture sensor.
- Turfed surfaces and topsoil material controlChapters [V5-05] to [V5-07] detail fine seedbed preparation, the protocol for detecting and containing invasive alien species in accordance with environmental legislation, as well as the granulometric and chemical verification of imported topsoils.
- Structure coexistence and plant sustainabilityChapters [V5-08] to [V5-10] finalise the method through the installation of root barrier membranes to protect adjacent paving, compliance with legal distances and heights for boundary hedges, and the management of watering and training pruning during the first establishment year.
Scrupulously applying this workflow guarantees that the work complies with Swiss rules of the art, reduces plant losses to less than 5% and protects the company against claims related to soil subsidence or premature lifting of road kerbs.
📘 Chapters in this section 10
A construction site soil is dead: compaction by machinery, loosening and stagnant plants
Break up the compaction pan with the right tools to prevent immediate root asphyxiation of your plants.
Planting, irrigation and living soilsTree pit: useful soil volume, root collar at the correct level and staking
Calculate the useful volume of topsoil and position the root collar to the millimetre to save your trees.
Planting, irrigation and living soilsWhen to plant: favorable period, rootball or bare roots, and the survival guarantee
Choose the ideal climatic window and the correct root packaging to validate the contractual survival guarantee.
Planting, irrigation and living soilsPrecise watering: drip irrigation, programming, rain gauge and network protection
Regulate drip water supply without saturating the soil profile by using sensor-based management.
Planting, irrigation and living soilsLawn: seedbed preparation, seeding or turf laying, and the first watering
Prepare an even seedbed and control the first watering for a dense, weed-free lawn.
Planting, irrigation and living soilsInvasive alien plants: recognition, ban on moving soil, disposal pathway
Identify invasive plants on site and apply the legal disposal procedure without scattering the soil.
Planting, irrigation and living soilsImported topsoil: analysis, stones, weed seeds and soil sold for another purpose
Check the particle size distribution and composition of imported soils to reject non-compliant deliveries before spreading.
Planting, irrigation and living soilsRoots lifting paving: poorly chosen species, root barrier and distance
Install the essential root guides for planting trees in the immediate vicinity of private roads or paved areas.
Planting, irrigation and living soilsThe hedge: species, distance to the boundary, statutory height and neighbour's pruning rights
Apply the regulatory planting distances and heights to prevent any neighbour disputes right from the time of planting.
Planting, irrigation and living soilsThe first year: watering, formative pruning, instructions to the client and establishment
Hand over watering protocols and carry out installation pruning to ensure the longevity of the work until final handover.