The hedge: species, distance to the boundary, statutory height and neighbour's pruning rights

On external works construction sites, a hedge planted without prior verification of boundaries exposes the client to immediate neighbour disputes and heavy grubbing-up costs. This chapter provides you with the method for planting your vegetation in accordance with municipal regulations, complying with permitted heights and preventing the right to cut back branches.

Key takeaways

  • Planting distances are always measured from the axis of the plant to the cadastral boundary.
  • The municipal building regulations set the maximum height of the hedge according to its setback.
  • JardinSuisse professional recommendations require anticipating the mature size of the chosen species.
  • The neighbour may demand the cutting of branches encroaching on their property after formal notice.

Check the municipal regulations and plant the hedge at the correct setback

Before any excavation of a planting trench, the team leader must reliably locate the property boundary stones using the official surveyor's mutation plan. Existing fences, old wire mesh or concrete borders do not constitute a reliable legal boundary. Swiss private law grants cantons and communes the competence to determine minimum planting distances and plant heights near neighbouring properties. In French-speaking Switzerland, municipal building police regulations or cantonal laws applying the Civil Code define precise thresholds that are binding on any landscaper.

The directives of the umbrella association JardinSuisse recall the need to design the landscaping by taking into account the mature volume of each species. Planting a young hornbeam, thuja or cherry laurel at the absolute minimum distance authorised by the commune is a common technical error. Over the years, the natural thickness of the vegetation causes the branches to spill over onto the neighbouring plot from the second or third growing season onwards. A plant installed without considering its final width forces the contractor or owner into continuous drastic pruning that degrades the landscape appearance and stresses the shrub.

Orders of magnitude for usual setbacks according to French-speaking cantonal and municipal practices
Type of hedge or speciesMaximum authorised heightMinimum distance to the boundaryRecommended planting precaution
Low ornamental hedge or living borderUp to 1 m 20From 0 m 50 to 1 m 00Reserve an axis setback of 0 m 80 for maintenance
Shared living hedge or common visual screenFrom 1 m 80 to 2 m 00From 1 m 50 to 2 m 00Position the axis at 1 m 50 minimum to allow the hedge trimmer to pass
Medium-stem trees integrated into a free-form hedgeGreater than 3 m 00From 3 m 00 to 5 m 00Increase the setback according to the mature branch radius

Certain district plans or municipal regulations impose strict indigenous species and totally prohibit invasive plants or those with dense evergreen foliage near agricultural or forest zones. The landscape contractor must demand a copy of local approvals from the site management or the client before ordering the plants from the nursery. If the planting pit is dug outside the legal dimensions, the civil judge or municipal authority will order cutting back to the regulatory height or complete grubbing up of the hedge at the offender's expense.

Maximum height, overhang management and neighbour's pruning rights

Managing the ridge height of a living hedge depends directly on its setback from the adjacent property. In most Swiss communes, a hedge planted fifty centimetres from the boundary must not exceed a height of between one metre and one metre twenty. As soon as the owner wishes to let the vegetation grow to two metres high to create a protective visual screen, the regulations generally require a full two-metre setback. These proportional relationships guarantee sunlight for neighbouring plots and reduce the risk of damage caused by creeping roots or stagnant moisture.

Operationally, the landscape contractor must warn the client about access constraints for periodic maintenance. To trim the outer face of a hedge planted at the edge of a plot, the gardener has no automatic right to enter the neighbouring property without the express permission of the occupant. If the axis of the shrubs is placed as close as possible to the property line, annual cutting back operations with a petrol or pole hedge trimmer become materially impossible from inside the garden without destroying the central foliage.

  1. Stake out the boundary and check municipal dimensionsLocate certified cadastral markers, stretch a reference string line along the plot and measure the setback dimension required by local regulations.
  2. Incorporate foliage spread into the trench axisAdd half the width of the mature hedge to the minimum legal distance so that future branches remain within the clearance envelope without spilling over onto the neighbourhood.
  3. Perform the initial training pruneCut back lateral shoots and the top leader upon planting to densify the base of the plant without exceeding the safety height set in the permit.
  4. Record dimensions in the daily reportTake metric photographs showing the position of the root balls in relation to the identified boundary stones and forward these items to the as-built documentation file.

When branches cross the property boundary, the plant material cut by the neighbour in the exercise of their pruning right belongs to them by right. However, to avoid disputes between owners and preserve neighbourly relations, the tradesperson ensures that a square hedge is installed, pruned to a plumb string line, and recommends a regular maintenance contract to prevent any unruly growth towards riparian lands.

Management of non-conformities: official cutting back, grubbing up and exercise of pruning rights

When a contradictory survey reveals that a plant grouping does not respect the planting distance to the boundary or exceeds the maximum height according to municipal regulations, the neighbouring owner may demand the reinstatement of the premises. Two technical outcomes then arise: severe pruning of the foliage or complete grubbing up of the plants. If the axis of the base is located within the setback zone prohibited by cantonal or municipal law, no pruning trick can regularise the situation: the removal of the disputed plant is mandatory. Swiss neighbourhood law tolerates no encroachment once damage is proven or legal distances are breached. The costs of bringing into conformity are borne entirely by the owner of the defective planting, as well as any surveyor fees necessary to re-establish the marking of the property boundaries.

The neighbour's right to have branches hanging over their plot cut is exercised according to a strict protocol. The injured party cannot act unilaterally: they must send the owner a written formal notice setting a reasonable execution time limit. Upon expiry of this term, if the owner of the vegetation has not intervened, the riparian owner may cut the branches encroaching on their land themselves or commission a landscaper at the offender's expense. On site, the commissioned landscape artisan must operate strictly from the cadastral boundary, without entering the neighbouring plot without agreement, making a clean cut at the exact vertical plumb of the boundary stones. The removal and collection of green waste resulting from this official pruning must also be organised cleanly, without leaving branches on the injured riparian owner's plot.

  1. Geometric assessmentLocate the cadastral boundary stones with a string line and measure the actual distance between the axis of each trunk at the collar and the plot boundary, as well as the total height relative to the natural ground level.
  2. Biological evaluationCheck the species' capacity to withstand severe pruning; conifers do not sprout on old wood, unlike many deciduous trees.
  3. Technical executionIf the axis respects the setback but the foliage extends beyond it, prune back to the strict vertical of the boundary stone; if the trunk encroaches on the legal distance, proceed with complete grubbing up.

JardinSuisse specification: choice of species and layout resetting at the boundary

To prevent conflicts, landscapers apply JardinSuisse recommendations. The professional association points out that the mature bulk of a shrub far exceeds the size of the container at delivery. Providing a planting distance to the boundary in compliance with municipal regulations requires integrating the mature thickness of the plant grouping and the circulation corridor for the passage of the hedge trimmer on private property. Positioning a vigorous species too close to the property marker condemns the owner to repeated pruning or early grubbing up, as natural development inevitably colonises the neighbouring airspace. Indigenous or rustic bush-form species require increased attention: their crown naturally flares out, which requires increasing the initial setback beyond the strict legal minimum in order to guarantee the durability of the plant screen without neighbourhood conflict.

Behaviour of species at property boundaries and maintenance setback
Plant speciesAnnual vigourReaction to pruningSetback recommended by JardinSuisse
Thuja occidentalisStrong (40 to 60 cm)None on old wood (browning)100 cm minimum for maintenance
Prunus laurocerasusVery strong (50 to 70 cm)Excellent (resprouts vigorously from the stump)100 to 150 cm to avoid overhang
Carpinus betulusMedium (30 to 40 cm)Very good (withstands string line pruning)60 to 80 cm from the cadastral boundary
Taxus baccataSlow (15 to 25 cm)Remarkable (buds on old wood)50 to 60 cm for narrow hedge

If grubbing up is made mandatory by a municipal decision, the construction site requires special precautions. A 1.5 to 2-tonne mini-excavator extracts the stumps without shaking the cadastral boundary stones or cracking neighbouring low walls. The landscaper locates underground pipes beforehand, which frequently run alongside private plot boundaries. After removing the debris to a composting facility, the trench is cleared of residual roots, then backfilled with screened topsoil and compacted methodically to prevent any subsidence along the riparian land.

Boundary disputes and remediation of non-compliant plantings

When a neighbour contests the installation of a plant alignment or the urban planning department notes an infraction, the team leader or site manager must neutralise the conflict through an immediate technical verification. The first intervention consists of uncovering the cadastral boundary stones buried under topsoil using a hand shovel and a cold chisel, without unseating them. From the official surveyor's marker, a tracing string line is stretched along the plot line to precisely measure the gap to the axis of the trunks. If the planting distance to the boundary proves to be less than the requirements of the cantonal law applying the Swiss Civil Code or the municipal regulations, the work is legally defective.

If the issue relates to the maximum height according to municipal regulations, remediation is carried out by pruning back. Workers intervene with the pole hedge trimmer and pruning saw to bring the crest below the authorised clearance profile, often set at 1 m 50 or 2 m depending on French-speaking communes. All lateral branches crossing the dividing line must be cut cleanly, flush with the bark, without tearing the cambium. This cut prevents the exercise of the neighbour's right to have branches cut that encroach on their property after formal notice.

  1. Inspection and contradictory stakingCheck the exact position of the surveyor's boundary stone, stretch an alignment string line and measure the setback of each base with a millimetre tape measure.
  2. Pruning back or mechanical stump removalTrim the top below the municipal limit or grub up the hedge using a mini-excavator equipped with a grading bucket to preserve the root system if replanting is agreed.
  3. Remediation of the trench and compliant replantingExcavate a new trench at the regulatory setback recommended by JardinSuisse, incorporate organic amendment and replant in a rigorous alignment.

Frequently asked questions

Where exactly is the planting distance measured in relation to the plot boundary?

The measurement is taken horizontally from the exact dividing boundary, materialized by cadastral boundary stones, to the geometric centre of the shrub's trunk at collar level. For a row of trees or a rustic hedge, neither the outer edge of the planting pit nor the initial foliage development is taken into account, but rather the woody axis of the plant at ground level of the finished natural terrain.

What does the owner risk if the branches exceed the shared fence?

According to the Swiss Civil Code, the inconvenienced neighbour can demand the removal of the overhang. They must grant a fair time limit to the owner of the plant to carry out the pruning. If nothing is undertaken upon expiry of this formal notice, the injured neighbour acquires the right to trim the invasive branches themselves or to have a landscaping company intervene at the defaulting owner's expense.

What maximum height should be adopted when installing a shared living hedge?

The absolute reference remains the municipal urban planning or building police regulations, which take precedence over general cantonal rules. In villa zones, the limit commonly lies between 1 m 50 and 2 m for a 50 cm setback. Exceeding this requires immediate corrective pruning under penalty of a reinstatement order by the municipality.

What JardinSuisse principles should be applied to avoid early grubbing up of a hedge?

JardinSuisse professional recommendations require anticipating the mature development of the chosen species. For vigorous plants such as cherry laurel or thuja, the planting axis must be set back beyond the legal minimum to incorporate the thickness of the hedge. This allows regular maintenance pruning to be carried out on one's own property without ever encroaching on the neighbour's plot.

Texts and standards cited

  • code civil suisseGeneral rules on neighbourly relations, respect for property boundaries and the right to prune roots and branches encroaching on neighbouring property.
  • norme SIA 118General conditions for the execution of construction works and management of work defects.