🧱 CFC 273Door acoustics: seals and thresholdsChapter 4 of 10 in the section

The threshold: acoustics versus accessibility, permitted step and retractable solution

This chapter details how to resolve the technical conflict between sound insulation under standard SIA 181 and barrier-free access requirements. You will learn how to precisely adjust an automatic retractable drop seal, check the permitted step height above the finished floor, and formalise the required written arbitration with site management and the client.

Key takeaways

  • A fixed threshold ensures acoustic performance but creates a major obstacle for wheelchair passage.
  • Standard SIA 181 requires perimeter sealing, which the automatic retractable seal achieves without a change in level.
  • The permitted step height tolerates only small bevelled offsets, otherwise accessibility is impeded.
  • Any technical compromise between sound insulation and unobstructed passage requires written arbitration by the client.

Floor-level conflict between sound insulation and level access

In multi-family residential buildings, administrative buildings and the care sector, the sound insulation of interior and entrance doors is strictly regulated by standard SIA 181. To meet the requirements against airborne noise from shared circulation areas, the door assembly must be sealed along its entire perimeter. Historically, this performance was achieved with a low rebate and a fixed threshold in wood, aluminium or steel, against which a tubular seal was compressed. However, this protruding cross-member creates a barrier at floor level that directly conflicts with the Swiss rules on barrier-free access. These provisions require clear level passages to ensure the autonomy of wheelchairs and walking frames and to allow service trolleys to pass.

Acoustic physics tolerates no gap: a two-millimetre slot under a leaf reduces the sound reduction of the assembly by 10 to 15 decibels, ruining the performance of a heavy acoustic leaf and resulting in non-compliance with standard SIA 181. The joiner is therefore faced with two contradictory requirements from the designers: sealing off sound hermetically while maintaining absolute floor continuity at the doorway.

Comparison of door-bottom solutions in terms of insulation and accessibility
Technical solutionSound reductionBarrier-free accessConstruction site constraints
Fixed add-on threshold with compression sealHigh and stable over timeNon-compliant, with a blocking step of 15 to 25 mmTo be excluded on accessible routes and escape routes
Automatic drop seal with retractable gasketHigh if the substrate is smooth and the adjustment is carefulPerfect with a continuous floor and no step when the door is openRequires a groove under the leaf and an even floor with no depressions
Flat sealing threshold with bevelled lipMedium, due to rapid wear of the rubberTolerated if the bevel has a profile of less than 5 mmPermanent friction leaving marks on light-coloured floor coverings

Fitting the retractable seal and written arbitration protocol

The automatic drop seal, also called a guillotine seal, is the reference technical solution for reconciling accessibility and acoustics. Recessed in a groove routed into the underside of the leaf, it consists of a U-shaped aluminium profile housing a moving blade fitted with a tubular silicone seal. The system is activated mechanically on closing by an adjustable push button on the hinge side, which makes contact with the frame. This plunger lowers the flexible lip in a parallel vertical movement, closing the gap under the door without any friction on the floor covering while the leaf swings.

  1. Trimming and fitting the profile under the leafCut the mechanism to the width of the panel, respecting the permitted trimming zone to preserve the internal linkages, then fix the profile in the bottom groove machined in the leaf.
  2. Fine adjustment of the strike plungerScrew the metal protection plate onto the frame rebate, then adjust the plunger screw so that the seal drops as soon as the strike plate begins to lock.
  3. Setting the travel and compression of the lipAdjust the drop amplitude so as to compress the silicone lip by two to three millimetres across the full width of the floor, without causing excessive resistance when operating the lever handle.
  4. Fitting the sealing end piecesInsert the foam or rubber end pieces against the frame jambs to plug the residual lateral air leaks, which degrade the insulation measured under standard SIA 181.

The effectiveness of the retractable seal still depends on the contact surface. On tiles with deep joints, an oiled parquet with uneven edges or an irregular polished concrete, the compression of the silicone does not fill the micro-voids. The joiner must then recommend inserting a flat stainless steel strip, recessed and bonded exactly flush with the finished floor covering, serving as a smooth bearing surface without creating a change in level.

Floor tolerances, bevelling of the step and kinematics of the automatic drop seal

On an interior joinery construction site, the sound-sealing performance of an entrance door assembly depends entirely on the contact between the retractable seal built into the bottom of the leaf and the finished floor. As soon as the barrier-free access requirement under standard SIA 500 applies, the joiner can no longer fit a surface-mounted threshold protruding several centimetres. The principle of a passable route requires a strictly flat floor or, at most, where technical constraints make it unavoidable, a permitted step height not exceeding the limit value allowed by the barrier-free construction rules.

To reconcile the sound reduction required by standard SIA 181 with the rolling of a wheelchair or walking frame, the joiner fits an automatic drop seal recessed in a groove machined in the bottom rail of the door. This retractable fitting consists of an extruded aluminium U-profile, an internal spring mechanism and a lip in highly elastic silicone or EPDM elastomer. The main pitfall during execution is lack of flatness of the screed or tiling: a local depression of more than two millimetres under the doorway creates a major acoustic leak that the travel of the flexible lip cannot compensate for without excessive compression at the ends.

Comparison of interior threshold configurations according to acoustic and accessibility requirements
Threshold configurationAcoustic sealing indexLevel accessSensitivity to floor level errors
Protruding screwed metal threshold (step above 25 mm)Optimal (direct mechanical compression on a continuous seal)Non-compliant (insurmountable obstacle for a wheelchair)Low (the profile absorbs local irregularities)
Flush floor strip with simple retractable sealMedium (sealing ensured if the floor is perfectly flat)Excellent (continuous passage at zero-millimetre level difference)Very high (risk of air leakage at screed depressions)
Bevelled strike strip (step of 5 to 10 mm) with double retractable sealHigh (increased sound sealing through the compression surface)Compliant (step can be crossed with a softened slope)Medium (the counter-profile corrects the bearing line)
Recessed floor channel with magnetic sealingVery high (continuity of sealing with no gap)Excellent (floor gap smaller than the wheel clearance)Critical (rapid clogging by construction site dust)

Adjustment of the side trigger is carried out with the leaf hung, fitted and adjusted in its frame. The needle screw or plunger on the hinge side compresses the lever as soon as the leaf enters the rebate. The adjustment must absolutely ensure a parallel descent of the seal across the full width of the opening. Too aggressive a push causes premature rubbing of the lip on the floor covering, marking the varnished wood or linoleum, while insufficient tightening leaves a perimeter gap incompatible with the requirements of standard SIA 181.

Coordination of floor interfaces, formal arbitration and acoustic acceptance

Where the circulation corridor and the interior room receive different types of floor covering, for example glued parquet on one side and tiles or resin on the other, the expansion or transition joint lies precisely under the leaf. If the tiler or parquet layer leaves a change in level or a domed edge profile at the closing line, the lip of the retractable seal is sheared or bridged. The CFC 273 joiner must request in writing a rectified, perfectly levelled and smooth strip of floor, aligned directly under the descent path of the moving seal.

When the specifications require both a high door sound reduction to satisfy standard SIA 181 and strictly step-free passage to satisfy standard SIA 500, the physics of the materials sets its limits. A floor-mounted retractable seal, even fitted with a double acoustic lip and lateral rebate sealing end pieces, concedes a loss of insulation compared with a fixed stop sealed on four sides. If the contractual sound requirement cannot be guaranteed on a continuous floor without a fixed threshold, the joinery project manager must formally notify the principal of this dilemma.

  1. Level survey and straightness checkCheck the flatness of the finished substrate with a two-metre straightedge under the footprint of the leaf. Any deviation exceeding the permitted tolerances must be reported before the door assemblies are installed.
  2. Submission of the written arbitration protocolNotify site management and the client of the performance actually achievable with the chosen type of threshold, weighing the requirements of standard SIA 181 against those of standard SIA 500.
  3. Fitting a flat or bevelled strike stripSeal or bond a thin, rectified stainless steel flat bar if the floor covering has hollow joints or roughness likely to degrade air tightness.
  4. Calibrating the retractable mechanism and sealing the cornersAdjust the trigger travel of the plunger to obtain uniform compression of the seal without abnormal resistance at the lever handle, then fit the corner sealing gaskets at the foot of the frame.

Dispute management: acoustic non-compliance and rework of the door bottom

When the in-situ sound insulation measurements required by standard SIA 181 reveal a non-compliant value or when free wheelchair circulation is compromised, the joiner must act methodically. The residual space under the leaf is the main sound leakage path of the door assembly. If the written arbitration document with the client is missing from the technical file of the construction site, the joinery company bears responsibility for the omission. Before any irreversible modification of the leaf or frame, the lead fitter must inspect the entire interface at finished floor level.

  1. Measuring the bearing profileCheck the flatness of the finished floor under the leaf with a precision straightedge to detect any local depression exceeding the tolerance of the lip.
  2. Checking the permitted stepMeasure the height of any floor strip in order to comply with the permitted step height under standard SIA 500 for persons with reduced mobility.
  3. Calibrating the moving mechanismAdjust the preload of the push button to ensure parallel descent and even compression of the floor-mounted retractable seal without hindering closing.
  4. Drawing up the agreement protocolSubmit to site management a joint inspection record detailing the technical corrections made and the final acoustic performance obtained.

If the nature of the floor covering prevents achieving the sound reduction level required by standard SIA 181 without adding a rigid stop, the joiner must immediately formalise his reservations. The decision to accept a loss of sound insulation in order to preserve a perfectly smooth passage, or conversely to add a floor profile, rests exclusively with the client through written arbitration. This formal agreement releases the contractor from any later dispute at acceptance of the finished works.

Frequently asked questions

How can the requirement of standard SIA 181 be reconciled with step-free passage on an entrance door?

Compliance is achieved by combining a high-performance double-lip floor-mounted retractable seal with a floor of impeccable flatness. If the covering has screed depressions, the automatic seal cannot guarantee air tightness without an acoustic bridge. The joiner must then fit a thin bevelled stainless steel counter-plate not exceeding the permitted height of standard SIA 500, providing the required sound insulation without obstructing the wheelchair.

What is the maximum permitted step height to maintain passable access without a threshold?

According to the construction rules for persons with disabilities set out in standard SIA 500, interior and access doors should ideally have no step. Where a mechanical sealing gasket requires a rigid striking surface on the floor, a maximum step of a few millimetres is permitted if it is provided with an adequate bevel and a gentle slope. Beyond that, access is deemed non-compliant and the client must issue a formal contractual derogation.

Why does the retractable seal rub on the tiles or parquet when closing?

This defect generally results from premature triggering of the tilting mechanism or from sagging of the leaf. The push button on the hinge side triggers the descent too early if the rebate clearance is insufficient. The automatic seal then scrapes the floor before the door comes to its stop, scratching the varnish or the tiles. Fine adjustment of the threaded plunger rod and of the hardware makes it possible to synchronise the descent over the last millimetres.

Who bears the cost of a metal counter-threshold not mentioned in the original description?

If the flatness tolerances of the floor covering trade exceed the capabilities of the retractable seal provided in the contract, fitting a strike strip is an additional service. The joiner prepares a revised quote and refuses to carry out the work without prior approval. Where the acoustic objective of standard SIA 181 is contractual, the written arbitration with the client determines the allocation of costs between the trades concerned and validates the chosen solution.

Texts and standards cited

  • SIA 181Protection against noise in buildings, sound insulation requirements for interior building elements
  • SIA 500Barrier-free buildings, geometric requirements for thresholds, permitted steps and level access