Casings, skirting boards and parquet laying: the execution reference
Intended for team leaders, foremen and site managers, this section details the installation of parquet, skirting boards, window reveals and casings in accordance with Swiss interior joinery standards. It provides the essential execution benchmarks for controlling the dimensional movement of timber, coordinating floor interfaces and ensuring flawless joinery finishes, without encroaching on the sanding and surface treatment assigned to the parquet layer.
- 10chapters
- 22 000words
- 6sections in the training course
- 60chapters in total
Key values to remember 4
8 to 15 mm
Usual width of the perimeter expansion gap to be left
≤ 2 mm
Flatness tolerance under the 2 m straightedge for finished floor
≥ 50 mm
Minimum residual cut width of the last row of boards
≤ 27 °C
Maximum permissible surface temperature on underfloor heating
Scope of parquet laying and joinery finishing work
The laying of timber floor coverings and wall casings is the point where heavy finishing work meets decorative finishing. In Swiss CFC 273 practice, the joiner works on a screed that is deemed dry and clean, prepared by the screed layer or the floor layer. The boundary of responsibility with the floor layer-parquet layer of CFC 283 is clear: the interior joiner carries out the mechanical assembly or full-bond gluing of factory-finished boards, the installation of resilient acoustic underlays, the fitting of transition profiles and the mounting of all accompanying woodwork. The official measurement of residual moisture with the carbide (CM) bomb, planing, heavy sanding with abrasive belts and the on-site application of varnishes or impregnating oils fall exclusively under the CFC 283 trade.
As regards walls and openings, the interior joiner carries out the aesthetic sealing, the plugging and fixing of skirting boards, the complete casing of window reveals and the integration of access hatches for sanitary and electrical services. This work covers the openings formed by the plasterers-plasterboard fitters of CFC 271 and connects against the external joinery installed by the window manufacturer of CFC 221. In accordance with standard SIA 253, the hygrothermal behaviour of solid timber or timber-based elements requires strict mechanical independence from masonry walls, door frames and heating pipes passing through. Any rigid contact inevitably causes destructive thrust or acoustic bridges.
| Element of work | Joiner's responsibility (CFC 273) | Responsibility of another trade |
|---|---|---|
| Substrate and screed | Visual inspection and flatness check with a 2 m straightedge | CM moisture measurement and heavy levelling (CFC 283 / CFC 251) |
| Parquet boards | Floating or glued laying of factory-finished machined boards | On-site sanding, staining and varnishing (CFC 283) |
| Skirting boards and thresholds | Mitre cutting, mechanical fixing, relief joints | Flexible sealing mastic between screed and tiling (CFC 248) |
| Reveals and sills | Casing panels, timber side linings, subframes and sills | Window frame, external sealing profiles (CFC 221) |
Working method and logical sequence on the construction site
Organising interior joinery and floor covering work on a construction site requires a rigorous sequence to prevent premature damage to finished elements. The logical progression begins with controlling the movement of the timber. Every laying start requires the exact calculation of the edge gaps against masonry and service penetrations, otherwise the entire parquet will dome upwards at the first humid seasonal change. The choice of mechanical fixing method, whether glued fixing to optimise thermal performance on a heated slab or a floating assembly on an acoustic underlay, directly determines the stresses exerted on the surrounding elements.
Next comes the phase of visual alignment and geometric setting out. The layout must distribute the boards harmoniously in relation to the entry of natural light and respect a minimum width for the last row against the opposite wall. Only once the floor plane is perfectly stabilised does the joiner install the stop and transition thresholds, ensuring that movement is broken between rooms with different thermal conditions. Work continues upwards with the skirting boards, the casing of window reveals in accordance with the ventilation requirements of standard SIA 343, then the careful casing of raw concrete stair steps.
- Acclimatisation and geometric setting outStore the closed packs flat in heated rooms for forty-eight hours, check the squareness of the corners and establish the laying guide line.
- Laying the covering and perimeter wedgingAssemble the boards with calibrated wedges to guarantee a continuous expansion gap around the perimeter of the surface and around risers.
- Threshold transitions and skirting board fittingFit the compensation profiles without restraining the parquet, then fix the skirting boards to the wall while maintaining a vertical clearance for movement.
- Vertical work and integration of hatchesAdjust the reveal side linings, re-case the stair steps and fix the access panels flush for technical inspection.
📘 Chapters in this section 10
Perimeter gap: width, walls, thresholds and pipes passing through
Calculate precisely the perimeter expansion gaps needed to prevent any seasonal buckling of the parquet.
Claddings, skirting boards and parquet installationGlued or floating: heat transmission, footfall noise and underfloor heating
Determine the best laying method, weighing thermal performance on underfloor heating against sound insulation.
Claddings, skirting boards and parquet installationLaying direction and layout planning: light, room length and last board
Harmonise the board orientation with natural light while avoiding narrow residual strips.
Claddings, skirting boards and parquet installationSkirting boards: fixing, mitre cuts, joint against an out-of-true wall and future removal
Cut your mitres successfully and fix your skirting boards firmly without ever restraining the floor covering.
Claddings, skirting boards and parquet installationChanging floor covering: threshold, level difference and clearance maintained on both sides
Manage thickness transitions and connect two different floors perfectly using suitable, decoupled profiles.
Claddings, skirting boards and parquet installationLining a window reveal: sill, side panels, condensation and movement clearance
Design stable reveal casings that protect the side linings from condensation without blocking mechanical movement.
Claddings, skirting boards and parquet installationCladding a staircase: step-by-step survey, consistent riser height and stair nosing
Re-case a raw concrete staircase accurately, correcting irregularities in the steps and treads.
Claddings, skirting boards and parquet installationPlanning access: integrated hatch, usable dimension and invisible finish
Integrate discreet flush access hatches that guarantee permanent access to valves and services.
Claddings, skirting boards and parquet installationLaminate flooring: use class, plank locking and what sets it apart from wood
Choose the right use class and master the click-locking of boards to ensure the durability of the laminate.
Claddings, skirting boards and parquet installationParquet lifted into a dome: diagnosis, skirting board removal and perimeter milling
Diagnose domed lifting defects and apply the appropriate corrective perimeter milling method.
