Key takeaways
- A fire door is a complete, inseparable system tested and approved in accordance with the AEAI requirements.
- Replacing a lock, a hinge or a seal immediately invalidates the fire-resistance approval.
- The metal identification plate fixed to the edge must correspond exactly to the acceptance test report.
- The frame, the fire-resisting wedging and the sealing gaskets all play a full part in the fire resistance.
The inseparable composition of the fire-resisting element approved by the AEAI
On a Swiss construction site, the joiner does not simply fit a flame-resistant leaf but installs a complete fire-resisting closure forming an interdependent technical assembly. The Association of Cantonal Fire Insurance Institutions, referred to by the abbreviation AEAI, issues certificates of conformity on the basis of laboratory tests in which each component was tested under real fire conditions. A door element classified EI 30 or EI 60 under the Swiss fire protection requirements necessarily comprises the leaf, the fixed frame or door lining, the hanging and locking hardware, and the intumescent and smoke-sealing systems.
- Fire-resisting closure assembly
- Complete system made up of the leaf, the frame or door lining, the pivoting and locking hardware, the intumescent sealing strips and the fixings, whose combined thermal and mechanical behaviour guarantees the declared fire-resistance class.
The leaf incorporates a solid core of technical fire-resisting panels, often reinforced with silicate, mineral fibres or fire-retardant chipboard, with solid hardwood lippings. However, its thermal insulation and hot-gas sealing performance becomes nil if the surround does not have equivalent thermal stability. The timber frame, whether fitted in the reveal, surface-mounted with a subframe or supplied as a complete block frame, must have a density and sections strictly in line with the manufacturer's technical file. The perimeter packing between the frame and the masonry or the opening must be tightly filled with compacted rock wool of a specific minimum density, completed by a bead of neutral fire-resisting sealant at the back of the joint.
| Component | Role in the fire-resisting system | Technical approval requirement |
|---|---|---|
| Technical leaf | Thermal insulation and sealing | Fire-retardant core with hard lippings, thickness and mass as per the approval certificate |
| Frame or door lining | Mechanical strength and connection to the substrate | Minimum section in solid timber or certified derived timber, fixing suited to the type of wall |
| Intumescent seals | Expansion under heat to block flames | Intumescent material set in a groove on the edges or in the frame rebate |
| Fire-resisting hinges | Holding the leaf in place at high temperature | Steel or stainless steel with a high melting point, screws passing through the frame reinforcements |
| Lock and strike plate | Continuous mechanical locking | Metal case protected by a fire-resisting shell, steel bolt preventing warping |
The absolute ban on substitution and management of the test report
The fundamental rule imposed by the AEAI and the fire protection authorities strictly forbids replacing any component with a part not listed in the recognition certificate. Fitting a different panic lock, replacing a cam-action door closer with an untested slide-rail model, or fitting untested concealed hinges strips the element of all approval. Even a non-compliant handle set or locking cylinder can transmit heat by conduction through the leaf, ignite the unexposed face and ruin the seal against cold or hot smoke.
For the fire door to be accepted without reservation by the safety engineer or the municipal fire authority, the joiner must deliver a perfect documentation file and ensure the physical labelling of each door set. The indelible metal identification plate is the identity card of the installed system. Riveted or nailed to the edge of the leaf on the hinge side, it shows the AEAI approval number, the year of manufacture, the fire-resistance class and the name of the manufacturer holding the approval.
- Checking the items on deliveryCheck that the identification plate is present on the edge and compare the reference number with the delivery note and the manufacturer's approval sheet.
- Observing operating clearancesAdjust the door to maintain an even clearance between the leaf and the frame, usually between two and four millimetres, ensuring the intumescent seals activate effectively.
- Fitting the certified hardwareInstall only the locks, strike plates, handles and door closers listed in the technical documentation, without any additional drilling not provided for.
- Drawing up the certificate of conformityComplete and sign the installer's declaration of conformity of installation, attached to the AEAI recognition certificate, for transmission to site management.
The chain of inseparable components: hardware, locksmithing and intumescent seals
On the construction site, a fire door is never just a solid timber panel or a fire-retardant composite core. Under the AEAI fire protection requirements, the fire-resisting element forms an inseparable functional unit tested in the laboratory under extreme thermal conditions. This physical barrier against flames and hot gases depends directly on the mechanical interaction between the leaf, the reveal frame or subframe, the intumescent strips, the hinges, the lock case and the automatic closing system. As soon as a single element is missing or comes from a reference not listed in the manufacturer's technical file, the rating of the whole assembly is lost.
| System component | Role during a temperature rise | Direct consequence of a substitution on the construction site |
|---|---|---|
| Hinges and 3D hinge pins | Mechanical retention of the leaf in its rebate despite thermal deformation and warping. | Premature sagging of the panel, opening of the rebates and immediate passage of hot gases. |
| Reinforced lock and strike plate | Central locking holding the leaf pressed against the frame without yielding under the pressure of the fire. | Melting of non-fire-resisting internal components, retraction of the bolt and opening of the leaf. |
| Overhead or concealed door closer | Ensuring complete closing and mechanical re-engagement of the latch bolt on every passage. | Leaf left ajar in the event of a fire, total loss of the fire compartmentation. |
| Intumescent rebate seals | Expansion under heat to fill the operating clearances and seal the perimeter. | No intumescence at the required temperatures, infiltration of toxic smoke and rapid flashover. |
| Fixing screws and plugs | Structural anchoring of the frame in the masonry or partition without failure under the effect of expansion. | Complete detachment of the frame through melting of unsuitable nylon plugs or pull-out of the screws. |
The hardware used on a certified entrance or communicating door is subjected to rigorous destructive testing. Replacing a slide-rail door closer specified in the test report with a cam-arm model of another make, even if the ironmonger considers it equivalent, immediately invalidates the complete system. The same applies to the strike plate: the joiner may not cut into the frame to install an electric strike not approved with that specific door. Machining the leaf to recess a motorised lock or a magnetic contact creates a zone of thermal weakness that consumes the insulating core if such machining is not explicitly included in the variants approved by the AEAI.
Traceability, identification plate and declaration of conformity of installation
The legitimacy of a fire door on a Swiss construction site rests on its documentary and physical traceability. On delivery of the prefabricated elements, the team leader checks the exact match between the leaf labels, the delivery notes and the approval numbers entered in the AEAI fire protection register. Each door must bear a permanent identification plate, generally riveted or nailed to the top edge or the hinge-side edge of the leaf, together with a corresponding mark on the frame.
- Checking parts and openingsCheck that the AEAI identification plate is present on the leaf and ensure that the perimeter clearance of the reveal complies with the strict installation tolerances given by the manufacturer.
- Installing the approved fixingsFix the frame or subframe with the certified type of screw, anchoring lengths and minimum spacings, without omitting the packing at the back of the joint with the prescribed mineral wool.
- Fitting accessories and adjusting closingFit the original hardware without modifying the openings, and adjust the door closer to ensure the bolt engages cleanly in the strike plate without excessive resistance.
- Drawing up the installation declarationComplete the installer's certificate of conformity, recording the AEAI approval number, the exact location in the building and confirmation of full compliance with the factory instructions.
At acceptance of the work, the cantonal fire protection authority or the local safety delegate requires the complete compartmentation file. This file includes the approval test report issued by the AEAI, the technical data sheets of the fire-resisting seals and sealants used, and the declaration of conformity signed by the joiner responsible for the installation. If an inspector finds that the riveted plate is missing or that an unauthorised bolt has been added to the leaf, the door set is rejected outright, leading to extensive remedial work or complete replacement of the element at the contractor's expense.
Handling non-conformities, rejection at acceptance and corrective measures
When a non-conformity affects a fire door set on the construction site — whether a door closer substituted without supporting documents, a lock replaced by an untested model or excessive trimming of the leaf — the AEAI approval is lost for the entire element. The fire protection authority or the safety engineer then refuses to issue the occupancy permit or the fire conformity certificate. In this situation, the joinery site foreman must act methodically to avoid a halt to the acceptance of the work.
- Joint inspection record and halt to interventionsRecord precisely the discrepancies between the identification plate, the AEAI test report and the components fitted. Any makeshift adaptation on site without the manufacturer's formal agreement is prohibited, as it engages the sole liability of the installer.
- Consulting the manufacturer and examining approved variantsContact the holder of the AEAI recognition. Only the manufacturer can confirm whether the modification or the alternative component is among the variants admitted in the official test report. If the substituted hardware is not listed, the original component must be reinstalled without compromise.
- Case-by-case agreement procedure with the cantonal authorityIf an architectural adaptation is unavoidable on site, the project manager must submit a formal request to the building insurance institution or the cantonal fire service. Without a written, reasoned derogation from the fire authority, no certificate of conformity may be issued.
- Complete replacement of the element in case of destructive alterationWhere the leaf has been excessively planed, drilled out of tolerance for an uncertified access control or stripped of an intumescent strip, the part is beyond recovery. Complete removal and the ordering of a new workshop-assembled leaf are required to preserve the resistance class.
The issuing of the declaration of conformity of installation tolerates no ambiguity. The joiner puts his signature behind the exact match between each assembled element and the requirements of the AEAI test report. In the event of a dispute at acceptance under the SIA 118 standard, stopping work on the element and formally notifying site management is the only defensible professional reflex.
Frequently asked questions
Can a faulty lock be replaced by another reference on a certified door?
No, it is forbidden to install a lock different from the one named in the AEAI test report or the annexes of the test report. Even if the new part has a comparable backset or bolt, its thermal resistance under fire load has not been validated in the laboratory for this specific element. Any change requires ordering the exact part from the door manufacturer or formally checking the options listed in its technical approval.
What should be done if the AEAI identification plate has been lost or torn off?
A fire door without its metal identification plate is deemed non-compliant at the final inspection by the fire authority. Contact the manufacturer that assembled the element, providing the order number, the invoice and the dimensional records. On this basis, the factory can issue an official duplicate under internal control. Without this indelible marking riveted to the edge, the cantonal report will never be validated.
Is it permitted to trim the bottom of a fire-resisting leaf to suit the finished floor?
Trimming the underside of a fire-resisting leaf is governed by the manufacturer's installation instructions and the AEAI test report. The maximum tolerance rarely exceeds ten millimetres on solid timber or solid-core doors, provided the internal frame or the lower intumescent seal is not cut into. If the rough opening is insufficient, any additional trimming voids the certificate of the assembly and requires the panel to be replaced.
Who is authorised to sign the certificate of conformity for an installed door?
The certificate of conformity must be signed by the head of the joinery company or the qualified installation manager who carried out or supervised the installation. By this document, the professional certifies on his honour that he has complied with the manufacturer's instructions, the perimeter clearances, the approved fixings in the masonry and all the components approved by the AEAI. This form is then sent to the cantonal fire protection authority for the granting of the operating permit.