Skip to content
Website
🧱 CFC 273Workshop, machines and wood dustChapter 3 of 10 in the section

The table saw: guard, push stick, fence, and the cut you never make by hand

In interior joinery and fitting-out, the table circular saw remains the main source of serious hand mutilations. This chapter details the strict geometric settings of the riving knife and the guard, the adjustment of the rip fence according to the thickness of boards or solid timber, and the mandatory machining set-ups that eliminate freehand work for good.

Key takeaways

  • The riving knife prevents the violent kickback of timber towards the joiner.
  • The upper guard channels wood dust and prevents hand contact.
  • The rip fence is set back to cut boards without trapping the off-cut.
  • Bevel cuts or cuts on curved pieces require rigid, clamped jigs.

Riving knife, guard and rip fence: the three vital components

In the workshop, as well as during preparation on the construction site for fitting-out or door-frame adjustments, the table circular saw accounts for the most serious accidents in the trade. The accident prevention ordinance requires the employer and professionals to operate machines fitted with protective devices that comply with the recognised rules of technology. Removing this equipment to save a few seconds on a concealed cut or a groove is the direct cause of the majority of amputations recorded by the Suva.

Geometric settings of the fixed components of the table saw
Safety componentSetting toleranceConsequence if incorrect
Riving knifeGap of 3 to 8 mm from the teeth, top set no more than 2 mm below the tip of the highest toothSaw kerf pinching in solid timber, immediate kickback of the workpiece towards the operator
Upper guard (hood)Lowered parallel to the workpiece, maximum clearance of 5 mm above the top face of the boardEjection of carbide fragments, fingers drawn in when passing over the blade
Rip fence ruleLow (flat) position whenever the cutting width is less than 120 mmCollision between the hand, the push stick and the hood; narrow workpiece tipping over

The riving knife must never be removed from its mount. Its thickness is engraved on the metal: it must be strictly greater than the thickness of the steel blade body, but less than the kerf width determined by the carbide tips. If the knife is too thin, the timber closes onto the rising rear teeth, causing an instantaneous kickback at over one hundred kilometres per hour. If it is too thick, the workpiece jams mid-cut, prompting the worker to push harder and increasing the risk of the hand slipping towards the blade.

The longitudinal setting of the rip fence also prevents accidents caused by jamming. When ripping solid timber, the internal stresses released close the fibres after the blade has passed. The rear end of the aluminium profile must be set back so that it stops level with the saw arbor axis or at the start of the riving knife. The split timber thus immediately finds lateral room to relax and no longer risks being pinched against the fixed fence by the rotation of the rear teeth.

Safety push stick and absolute ban on freehand machining

The push stick is the mechanical extension of the joiner's hand. The accident prevention ordinance requires that suitable auxiliary tools be kept within immediate reach of the operator. As soon as the remaining cutting width between the blade and the parallel fence falls below the width of a hand, the use of a wooden or plastic push stick is mandatory. Pushing a thin strip with the thumbs is an unacceptable risk that ends in the operating theatre at the slightest knot failure or kickback of material.

  1. Grip and body positionStand slightly offset from the ejection axis of the blade. The left hand holds the workpiece pressed against the fence upstream of the table, never crossing the imaginary line traced by the teeth.
  2. Gripping the wooden push stickTake the push stick hanging on the saw frame as soon as the rear end of the workpiece is 200 mm from the blade guard. Apply force forwards and downwards to keep contact with the table.
  3. Clearing the cut piecePush the timber past the riving knife with the push stick. Never remove the narrow off-cut trapped against the blade with your fingers; wait until the arbor has stopped completely or use the heel of the push stick.

Any cut without rigid mechanical guidance is strictly forbidden in the joinery workshop. Ripping curved pieces for curved panelling, bevelling mitres freehand or cutting round battens without an anti-rotation device causes unpredictable tipping of the material. The teeth catch the workpiece, tear the piece away and instantly draw the operator's fingers into the cutting zone.

For cutting tapered wedges, bevels or skewed door frames, the joiner must make a sliding jig running in the table slot or clamped to the squaring carriage. The rough workpiece is secured in it by means of a mechanical hold-down or a quick-release toggle clamp. The hands stay on the jig handles, out of reach of the blade, ensuring both geometric accuracy to a tenth of a millimetre for reveals and total safety at the workstation.

Rip fence and narrow longitudinal machining

In interior joinery and fitting-out, ripping solid pieces or boards is the most common and most accident-prone operation. According to the accident prevention ordinance, the employer and workshop managers must ensure that the work equipment provides constant protection against hands being drawn in and against workpiece kickback. On a table circular saw, the rip fence does not merely determine the machining width; its longitudinal position directly determines whether pinching occurs behind the teeth, the primary cause of violent kickback towards the operator.

As soon as a longitudinal cut releases an off-cut between the blade and the fence, that off-cut may pivot, catch the rising teeth and be thrown at a speed exceeding one hundred kilometres per hour. To neutralise this onset of jamming, the parallel fence rule must be set back. The rear end of the aluminium rule must never extend beyond the geometric centre of the saw arbor when sawing solid timber likely to release internal stresses. The free space created downstream allows the material to move apart without compressing the riving knife or rubbing against the rising side of the blade.

Mandatory rip fence configurations and accessories according to the machining operation
Type of machiningFence profile positionFence rule set-backMandatory feed device
Ripping rough planks (thickness > 40 mm)High profile (vertical)Rule stops at the blade axisHeeled push stick at the end of the pass
Ripping battens or fillers (< 120 mm)Low profile (laid flat)Stops in line with the first rising teethShaped hardwood push stick
Ripping very narrow fillers (< 30 mm)Low profile with intermediate sacrificial stripStrict stop before the riving knifePush stick with continuous support sole
Sizing of wood-based panels (MDF, veneered)High profile (vertical)Rule advanced over the whole tableLeft hand pressed down, right hand on the push stick

Switching to the low profile means tilting the aluminium rule onto its narrow face to lower its height to about ten millimetres above the table. This fundamental setting frees up the clearance needed to lower the blade guard as close as possible to the timber surface, while allowing the joiner to push the workpiece without fingers or the push stick hitting the suspended upper guard. Machining edge fillers with the rule in the high position forces the operator to lift the guard or to guide the strip with the fingertips, which is a clear breach of workplace safety rules.

Cuts prohibited without a jig and machining of short pieces

Machining short components for interior fittings, such as wardrobe sub-frames, glazing beads for glazed doors or bevelled sealing wedges, prohibits any direct freehand holding. The proximity of the blade combined with the instability of the workpiece produces unpredictable cutting forces. As soon as a piece is shorter than three hundred millimetres or narrower than one hundred millimetres, the cut must be guided by a rigid mechanical support attached to the sliding carriage.

  1. Making an angle cross-cutting jigAssemble a plywood or MDF base panel mounted on runners fitted to the table slot, equipped with a stop fence set perfectly square or at the required angle, and with a splinter guard cut by the blade itself.
  2. Clamping the fitting-out workpieceFix a quick-release vertical hold-down or a bevelled block integral with the jig to immobilise the workpiece (glazing bead, finishing strip) so that the operator's fingers never come within two hundred millimetres of the cutting line.
  3. Positioning the retractable stopSet the cutting dimension using a length stop fixed to the movable jig, located strictly upstream of the cutting path to avoid any rubbing during the pass.
  4. Controlled feed with protective screenPush the whole movable carriage at constant speed, keeping both hands on the jig handles, under the blade guard lowered flush with the workpiece.

Bevel cuts for wall-panelling joints, false corner tongues and the making of skewed fixing wedges require a ripping carriage with an eccentric hold-down. The worker must never attempt to hold a triangular wedge between thumb and index finger to trim it on the table circular saw. If it is technically impossible to mount a dedicated jig on the stationary machine, the task must be redirected to a radial mitre saw equipped with its original table clamps, or to machining by ripping a long master piece cut to size after profiling.

Action to take in the event of workpiece kickback or injury at the table saw

The violent kickback of a piece of timber or contact with the rotating teeth requires an immediate and methodical reaction in the joinery workshop. When the riving knife or the blade guard have been incorrectly set or bypassed, the accident happens in a fraction of a second: severed tendons, amputation of a finger or chest trauma caused by the ejection of split timber. The accident prevention ordinance and the Suva guidelines require the employer and the workshop manager to organise rescue and secure the area to prevent any further accident.

  1. Stopping the machine and isolating the powerHit the emergency stop button of the table saw. Switch off the wall-mounted lockable isolator to prevent any unintended restart by a colleague during first aid or removal of the jammed piece.
  2. Caring for the casualty and calling the emergency servicesCall 144. Apply pressure to the wound without an excessively tight tourniquet unless there is massive bleeding. If a finger segment has been severed, place it in a dry sterile compress, put into a sealed bag laid on ice.
  3. Locking out the saw and preserving the sceneDo not touch the rip fence settings, the blade height or the position of the push stick. Leave the off-cut or the jammed piece in place for the technical analysis of the accident and the compliance check.
  4. Risk analysis and formal reportingReport the event without delay to the compulsory accident insurer. Gather the team to identify the triggering factor: no push stick, freehand machining of a short piece, or a kerf closing in on the blade body.

Frequently asked questions

Can the blade guard be removed to cut a stopped groove on the table saw?

No. Removing the upper guard without a compensating device is prohibited. To machine a stopped or blind groove, the joinery shop must use a suitable riving knife whose top lies slightly below the upper edge of the blade. The workpiece must be held by comb hold-downs fixed to the rip fence and to the table, preventing any contact of the hands with the cutting zone and preventing the board from lifting.

From what workpiece width does the wooden or plastic push stick become mandatory?

The safety push stick is mandatory as soon as the cutting width between the blade and the rip fence is less than one hundred and twenty millimetres. In workshop practice, joiners keep the push stick within immediate reach for any longitudinal cut. This device ensures a protective distance that is essential for the feeding hand. Below such a width, guiding the timber directly with the fingers exposes the operator to the risk of fatal entanglement or amputation.

What should be done when solid timber pinches the blade and risks a violent kickback?

Pinching of green or highly stressed timber comes from a release of internal stresses during ripping. The first defence remains a correctly set riving knife, of an intermediate thickness between the blade body and the tooth set. If the workpiece starts to bind at the outfeed, immediately insert a dry wooden wedge into the saw kerf behind the riving knife to keep the kerf open and prevent any motor stall.

Which short cuts are strictly prohibited without a guiding jig?

It is strictly forbidden to cross-cut short pieces by supporting them only against the parallel rip fence. The off-cut trapped between the rising blade and the fence is spun instantly and thrown violently towards the operator. Any cross-cutting of short pieces requires the use of the sliding carriage with flip stop, or of a dedicated cutting jig that mechanically holds the workpiece to guarantee a total hand exclusion zone.

Texts and standards cited

  • OPATechnical protective measures and installations in the operation of workshop machines.
  • OMachSafety requirements relating to the design and protective devices of table circular saws.

In the same section