🧱 CFC 273Fire doors: approval and integrityChapter 9 of 10 in the section

Maintaining: periodic inspection, points to check and handover of instructions

This chapter details the systematic inspection method for an interior timber fire door, built around five mechanical check points. It defines the maintenance obligations that fall to the operator from the acceptance of the work under SIA 118, as well as the exact content of the written instructions file that the joiner must record to ensure VKF compliance.

Key takeaways

  • A perimeter gap that has drifted by three millimetres prevents complete closing and destroys the fire compartmentation.
  • Five mechanical points require systematic checking: gaps, door closer, lock, hinges and leaf closing selector.
  • From the acceptance of the work, the operator assumes the legal obligation to keep the doors in working order.
  • The joiner must hand over written instructions prohibiting wedging doors open and prescribing annual technical maintenance.

The five technical points for checking the operation and sealing of the door set

A fire door installed in accordance with its approval is subjected, in continuous use, to the structural movements of the building, the mechanical wear of the ironmongery and the temperature and humidity variations of the rooms. As soon as a leaf scrapes on the parquet floor or rubs against the rebate of the frame, the thrust developed by the hydraulic door closer is no longer enough to overcome the resistance of the latch bolt. The fire compartmentation required by the VKF is then completely destroyed. The interior joiner applies a methodical inspection procedure built around five essential technical points.

  1. Perimeter gaps and intumescent sealsMeasure the gaps between leaf and frame using a set of calibrated feeler gauges. The required gap is between three and four millimetres on the side jambs and the head, in accordance with the certificate of conformity. Carefully check the integrity of the intumescent strip glued in its groove: no coat of lacquer, varnish or sealant must hinder its expansion under heat. The cold smoke seal must remain flexible without any tearing.
  2. Door closer and closing actionCheck the tightness of the fixings on the leaf and the head. Test the self-closing action from the maximum opening angle, then from a residual angle of ten degrees. The device must overcome air resistance and seal friction to fully engage the latch bolt in the strike plate. Adjust the sweep speed and the final latching action using the hydraulic adjustment screws.
  3. Lock, bolt and strike plate recessCheck that the latch bolt and the deadbolt slide freely in the strike plate without binding. The strike plate recesses must be free of sawdust, burrs or lacquer residue. Treat the moving mechanical parts only with a dry PTFE or graphite lubricant, as greasy oils promote premature fouling of the lock case.
  4. Hinges and anchorage in the frameExamine the hinges, which are adjustable in three dimensions. Make sure the anchor screws are perfectly tight in the concealed reinforcements of the frame. Any sagging of the leaf or trace of black filings on the knuckles reveals wear of the bushings. Realign the leaf using the micrometric screws to restore the nominal flush gaps.
  5. Closing selector and interlocksOn double-leaf door sets, test the operation of the mechanical closing selector. The semi-fixed leaf must close before the active leaf into the strike plate. On doors with interlocks, cut the power supply to the magnetic holders to confirm instant release and full closing of both leaves.

Operator's obligations and protocol for handing over written instructions

On signature of the acceptance record of the work governed by SIA 118, custody of the door and the legal maintenance obligation are formally transferred to the owner or operator of the building. The fire protection regulations issued by the Association of Cantonal Fire Insurers, the VKF, require the operator to keep all fire-compartmentation and closing devices of the building in perfect, permanently operational condition. The operator cannot discharge this continuous maintenance obligation.

Allocation of obligations and inspection frequency after acceptance
Person responsibleMinimum frequencyChecks and tasks to carry outDocumentation trail
Facility operative or caretakerMonthlyVisual check of closing, removal of wedges under the leaf, latch bolt testInternal rounds log
Qualified joinerAnnualAdjustment of ironmongery, gap checks, dry lubrication, inspection of intumescent sealsMaintenance report
Fire safety specialistAnnualChecking of electrical interlocks, release of the magnetic holders from the control panelSafety record
Owner or property managerContinuousImmediate commissioning of repairs, retention of certificates and maintenance historyOfficial fire register

The interior joiner must record and hand over a book of written instructions when handing over the keys. This protocol restates the absolute prohibition on wedging leaves open with wooden wedges or floor stops, a common practice but one that constitutes a serious fire safety defect. The operator must know that deliberately blocking a fire door engages their full civil liability in the event of a fire.

The document also states the technical limits of intervention. No structural modification, and no addition of security fittings, door closers or electromechanical locking, may be made without the written consent of the manufacturer holding the VKF approval. Any non-approved drilling or routing destroys the fire resistance of the leaf core. Finally, the operator must file each annual service slip in the building's fire safety logbook, kept available for the cantonal fire inspectors.

Keeping the VKF inspection logbook and inspection intervals on the work

From the handover of the work, maintaining the EI30 or EI60 fire performance relies on documented monitoring. The fire protection regulations of the Association of Cantonal Fire Insurers (VKF) require the operator to record every operation in a dedicated safety register. A timber fire door is subjected to repeated mechanical and hygrothermal stresses. Over the heating seasons and with frequent use, the leaf moves: a sag of two millimetres at the hinges is enough to change the compression of the intumescent seal or to make the latch bolt rub against the strike plate, preventing complete re-latching. The inspection is not limited to a simple visual check; it requires a methodical verification recorded in writing, enforceable during inspections by the cantonal fire authorities.

Inspection frequency grid according to use and building occupancy
Building occupancyMinimum inspection frequencyPriority mechanical elementsPerson responsible for the record
Multi-occupancy housing (flat entrance doors)Annual (12 months)Door closer, bolt travel, integrity of intumescent and acoustic sealsQualified caretaker or commissioned joiner
Administrative and school buildingsSix-monthly (6 months)Rebate gaps, tightness of 3D hinges, closing selector on double-leaf doorsTrained in-house maintenance technician
Care facilities and residential accommodationQuarterly (3 months)Door closer closing force, electric strike plates, magnetic release devicesJoinery company under a maintenance contract
Emergency exits and evacuation lobbiesMonthly (1 month)Automatic re-latching, panic bars, absence of mechanical wedgingSite fire safety officer

The inspection logbook must list the exact designation of each element: door number according to the location plans, VKF certificate of conformity number shown on the plate riveted in the rebate, test date, anomalies found and corrective measures applied. If an intumescent seal is cut when furniture passes through or is inadvertently covered during painting work, its expansion under heat is compromised. The record must state its replacement with an equivalent profile, validated by the door's approval test report. The absence of this register exposes the operator to an immediate formal notice from the fire protection authority during periodic audits.

Demarcation of competences: what the operator may correct and what is for the joiner

The formal handover of written instructions makes a clear transfer of operational responsibilities. Under SIA 118, once the work has been accepted without reservation on the fire closures, the operator becomes legally responsible for daily safety monitoring. This responsibility does not, however, authorise them to undertake structural modifications to the frames or leaves. A very clear dividing line must be drawn between routine operating maintenance and corrective adjustment under the warranty on the work or a maintenance contract.

  1. Operations authorised for the site's technical serviceOperating staff may clean the floor tracks, dust the door closer housings, tighten exposed lever handle screws with a hand screwdriver and lubricate the bolts with a non-greasy fluid recommended by the ironmonger. They check that nothing obstructs the travel and that the door is not held by a wooden wedge or a door stop.
  2. Detection of scraping or failure to re-latchAs soon as a leaf scrapes the finished floor, catches the door frame or does not engage in the strike plate without a manual push, the internal person responsible must immediately isolate the problem and record the fault in the maintenance logbook, without attempting to plane the panel or grind the strike plate.
  3. Mandatory intervention by the CFC joinerAdjusting the three-dimensional concealed hinges (height, depth, compression of the meeting seal), adjusting the damping and latching-action screws on the door closer or replacing a perimeter seal requires calibrated Allen keys, specific fitting shims and the experience of the interior joiner to maintain the gap tolerances (strictly between two and four millimetres according to the approval).

The Code of Obligations (CO) governs the client's rights regarding defects in the work after delivery, while SIA 118 governs the warranty periods for building construction. However, a documented lack of maintenance, the absence of regular inspection or an attempted modification by an unqualified third party release the installing joiner from liability in the event of later thermal or mechanical malfunction. Signing the record of handover of instructions protects the craftsman against unfounded claims and obliges the owner to commission trained professionals for any geometric correction on the frame or leaf.

Closing failure: emergency procedure, arbitration and technical recourse

Finding a leaf that scrapes on the threshold or a bolt that refuses to engage in the strike plate is a critical failure. From that moment, the compartmentation required by the VKF is no longer guaranteed. The operator cannot simply wait for the next annual visit: the door must be reported as defective without delay. The dangerous reflex of blocking the leaf with a wooden wedge to ease passage cancels all protection and directly engages the civil and criminal liability of the building operator.

  1. Recording and securingRecord the anomaly in the fire inspection logbook and arrange compensatory monitoring of the area if the risk justifies it.
  2. Diagnosis of the causeCheck whether the malfunction comes from structural settlement of the structural work, a rebate gap outside tolerance or a lack of maintenance of the rotating parts.
  3. Calling in the qualified joinerCommission the joinery company to redo the hinge adjustments, recalibrate the door closer force or replace a deteriorated intumescent seal.
  4. Technical acceptanceConfirm in writing that the door closes fully on its own from all opening angles and countersign the maintenance logbook.

The allocation of responsibilities rests on the nature of the damage and the traceability of the instructions handed over in writing. If the misalignment or scraping occurs during the defects notification period governed by SIA 118 with no external impact or misuse established, the joiner intervenes under the warranty. If, on the other hand, the deterioration results from fouling of the pivots, from the absence of the six-monthly greasing prescribed in the maintenance manual or from the addition of ironmongery not approved by the VKF, the repair costs fall entirely on the operator.

When the leaf shows warping beyond the tolerances allowed by the trade guidelines, or when the frame fixings have given way in the masonry, a simple ironmongery adjustment is not enough. The joiner then draws up a joint report stating whether the panel can be relieved by adjusting the internal tie rods or whether outright replacement of the certified element is required to restore smoke tightness and fire resistance.

Frequently asked questions

What does the operator risk if they fit a door stop to hold a fire door open?

Blocking a fire door with a wedge or a non-interlocked mechanical means is a major breach of the VKF fire protection regulations. In the event of a fire, the compartmentation does not work, letting smoke and flames into the circulation routes. The operator risks the building insurer refusing cover and directly engages their civil and criminal liability. Only a certified electromagnetic holding system connected to the fire detection is legally tolerated.

Who must adjust the closing speed and final latching action of the door closer during maintenance?

Fine adjustments to the hydraulic door closer, in particular the closing speed and the final latching action of the bolt, require precise knowledge. While the operator's technical staff may make slight seasonal corrections provided for in the manufacturer's manual, any major intervention linked to scraping of the leaf or to a malfunction of the closing regulator must be entrusted to a qualified joiner. Improper handling of the regulating screws can destroy the hydraulic seal of the device.

How can it be proved that maintenance was properly carried out in the event of a cantonal inspection?

Compliance is established by presenting the building's fire inspection logbook, kept rigorously up to date by the operator. This document brings together the periodic inspection records, the dates of interventions, the anomalies found, the corrections made and the identity of those who carried them out. Also attached are the technical manual handed over by the joiner at acceptance, the declaration of conformity of installation and a copy of the VKF approval certificate attesting the performance of the door set.

Can a timber fire door leaf that scrapes on the floor covering be planed?

On-site planing of a fire door leaf is strictly governed by the manufacturer and the VKF approval. Most technical doors have hardwood lippings with very small trimming tolerances, often limited to a few millimetres at the bottom, or even none on the side edges. Removing too much material compromises the covering of the insulating panel and destroys the built-in intumescent strips. The adjustment must primarily be made through the 3D hinge adjustments.

Texts and standards cited

  • norme SIA 118General conditions for the execution of construction work (management of defects and warranty on the work)
  • Prescriptions de protection incendie AEAISwiss fire protection regulations governing the maintenance of fire closures and the operator's obligations