🧱 CFC 273Fire doors: approval and integrityChapter 5 of 10 in the section

A fire door must close again: door closer, selector and no wedging allowed

This chapter details the self-closing requirements for fire-rated door sets under the AEAI fire protection regulations. You will learn how to adjust rack-and-pinion or slide-arm door closers, how to set the timing of a mechanical selector on a double-leaf door set, and how to connect compliant electromagnetic hold-open systems so as to eliminate the wooden wedge for good.

Key takeaways

  • A fire door must close by itself as soon as it has been passed through, in order to guarantee compartmentation.
  • Using a wooden wedge immediately voids the fire resistance prescribed by the AEAI.
  • Double-leaf door sets require a mechanical selector that ensures the leaves overlap correctly.
  • Only hold-open devices linked to a fire detection system allow a safe open position.

Mandatory automatic closing and the ban on the workshop wedge

On an interior joinery construction site, a fire-resistant door set certified EI 30 or EI 60 loses all its protective value the moment its leaf does not return into the rebate. The fire protection regulations of the Association of Cantonal Fire Insurance Establishments impose mandatory automatic closing for every compartmentation element. The fire-resisting function relies on the tight containment of flames and hot smoke: a leaf left open by a few millimetres destroys the thermal compartment and lets toxic gases through within the first seconds of a fire.

Return into the rebate requires an overhead or concealed hydraulic door closer, rigorously matched to the width, the weight of the leaf and the resistance force of the intumescent seals. Models with asymmetric rack or cam action and slide arm must be sized to overcome air resistance in airtight lobbies as well as the friction of the latch bolt in the strike plate. Any mechanical hold-open mechanism built into the door closer arm is strictly prohibited on a flame-resistant or fire-resistant door.

  1. Checking the fixings on the frameFix the door closer body and the arm shoe with metric screws into the steel reinforcements integrated in the timber or metal frame, without passing through the perimeter intumescent strips.
  2. Adjusting the sweep speedAdjust the main hydraulic valve to obtain a steady swing of one hundred and eighty degrees down to about fifteen degrees from the final opening, avoiding violent slamming.
  3. Adjusting the final latching actionAdjust the second valve to speed up the swing over the last centimetres, ensuring the latch bolt retracts fully and the door locks effectively without manual intervention.

Closing selector on double-leaf doors and linked hold-open devices

Fitting a door set with two asymmetric or symmetric leaves demands absolute geometric rigour. For the meeting stile to ensure tightness against fire and smoke, the semi-fixed leaf must close and engage before the active leaf. Without mechanical coordination, the active leaf strikes the edge of the passive one, leaving the opening ajar. Installing a mechanical or hydraulic closing selector is an unavoidable technical requirement under the AEAI guidelines.

  • Surface-mounted gravity selector: pivoting arm fixed under the lintel that holds the active leaf until the semi-fixed leaf has fully closed.
  • Coordination integrated in the slide rail: invisible system concealed in the continuous rail connecting the two overhead door closers.
  • Automatic rebate locking: panic espagnolette or flush bolts securing the semi-fixed leaf at top and bottom as soon as it closes.

When the operation of an office, hospital or school building requires doors to be kept open to ease daily traffic, the only solution permitted by the AEAI is to install a linked electromagnetic hold-open device. This system holds the leaves by magnetic holders under permanent power supply. When an alarm is triggered by the stand-alone smoke detectors or by the building's fire alarm panel, the circuit cuts the electrical supply: the electromagnets release the leaves instantly, allowing the door closers to close the openings without any human action.

Comparison of hold-open and closing solutions
EquipmentRegulatory statusOperation in case of alarmCritical installation point
Wooden wedge or mechanical door stopProhibitedPrevents the leaf from closingVoids the door set warranty
Arm with releasable mechanical hold-openProhibited on fire doorsPermanent mechanical hold-openDoes not meet AEAI requirements
Wall-mounted electromagnetic holderPermitted under conditionsInstant power cut-offPerfect alignment of armature plate
Rail with selector and radio-controlled hold-openPermitted under conditionsRelease by integrated smoke detectionFine adjustment of time delays

Kinematic adjustment of the door closer and mechanical coordination of the selector

Approval of a fire door rests on its ability to return to its tightly closed state in all circumstances. The AEAI requires mandatory automatic closing to guarantee the fire compartmentation of the building. On site, the joiner does not merely fix the door closer body: he adjusts the hydraulic kinematics to the real airflow conditions of the corridor or stairwell. Adjustment is made with the needle valve screws that regulate the main closing speed and the final latching action. This final latching action must develop the torque needed to overcome the mechanical resistance of the latch bolt in the strike plate and to compress the intumescent seal without making the leaf bounce against the frame. Precise adjustment of the spring force also compensates for the slight overpressures generated by lobbies or by the building's controlled mechanical ventilation. Badly calibrated opening damping risks pulling the fixing screws out of the timber structure or metal frame, while excessive speed risks injuring users.

Adjustment parameters of closing devices on a hinged fire door
Mechanical componentControlled parameterAdjustment actionAEAI compliance requirement
Hydraulic door closerSweep speedPrimary hydraulic throttle screwSmooth, continuous swing without intermediate blocking
Hydraulic door closerFinal closing latching actionThrottle screw of the last angular sectorComplete engagement of the latch bolt in the strike plate without bounce
Leaf selectorDelay of the active leafMechanical stop or telescopic armActive leaf held back until the semi-fixed leaf is locked
Slide armGuiding resistanceTightening of the rail and alignment of the sliderNo parasitic friction reducing the residual energy

On a double-leaf door, tightness against flames and hot gases requires a perfect overlap of the central rebate or the applied meeting stile. The selector on a double-leaf door mechanically prevents the active leaf from closing before the semi-fixed leaf. Whether it takes the form of a bar system concealed in the top rail of the frame or of a visible surface-mounted articulated arm, this component holds back the active leaf at a predefined angle. As soon as the semi-fixed leaf reaches its rebate position and operates the mechanical release, the active leaf is released to complete its travel. Any seizing or loss of synchronisation compromises the integrity of the compartmentation approved by the AEAI.

Linked hold-open devices and closing self-inspection protocol

The interior joiner installs and mechanically connects the wall-mounted electromagnetic holders or the holders integrated in the guide rail. These holding magnets keep the leaves open for daily circulation while being linked to the building's fire detection panel or to stand-alone smoke detectors fitted on the ceiling on either side of the opening. A clearly identified and accessible manual release push-button must always complete the installation to allow deliberate closing by operating staff. During installation, perfect alignment between the articulated armature plate fixed to the door leaf and the wall-mounted electromagnet ensures a constant holding force without stressing the hinges through a destructive lever arm. This close coordination between the installer and the electrician avoids any rejection at the final inspection by the cantonal fire protection authorities.

  1. Checking clearances and geometryCheck the flatness of the leaf, the uniform perimeter clearance within the manufacturer's tolerances, and the complete absence of rubbing of the lower drop seal against the finished floor covering.
  2. Releasing the hold-open deviceCut the power supply to the holders or operate the release push-button to confirm the instant magnetic release and the spontaneous start of the leaf under the push of the door closer.
  3. Checking the sequencing of the two leavesOpen both leaves, release the active leaf first, then check that the selector physically prevents its return until the semi-fixed leaf has fully closed and locked.
  4. Validating latch bolt engagementConfirm positive engagement of the latch bolt in the frame strike plate, a sine qua non for issuing the AEAI certificate of conformity handed to site management.

Handling closing non-conformities and clearing reservations

During final inspections before acceptance, refusal of approval by the fire protection authority or the safety engineer almost always stems from a kinematic fault: a semi-fixed leaf that does not latch fully, a selector that releases the active leaf too early, or airflow resistance preventing the latch bolt from engaging. Faced with a non-conformity report, the joiner must on no account try to compensate for the problem by modifying certified components, on pain of invalidating the certificate of conformity.

  • Check the plumb of the frame with a spirit level and verify that the perimeter rebate clearance remains uniform over the full height.
  • Release, then recalibrate the force, speed and final latching adjustment screws of the door closer without forcing the hydraulic stops.
  • Check the position of the telescopic arm of the mechanical selector and make sure the driving clevis does not rub against the leaf.
  • Test closing with the mechanical ventilation running to measure the real impact of stairwell overpressures.

If the blocking comes from excessive air depression generated by the building's technical installations, the joiner sends a written notice to site management. It is for the designers to rebalance the airflows or to specify a door closer force compatible with the manufacturer's tests. Under no circumstances may the joiner plane an intumescent edge or unscrew an acoustic seal to ease the passage of air.

Frequently asked questions

Is a wooden wedge tolerated temporarily during removal work?

No. The AEAI fire protection regulations formally prohibit non-linked mechanical blocking of a fire door, even for a short time. A door wedged open lets toxic smoke and flames through in the event of a fire. Only an electromagnetic hold-open device connected to the fire detection allows a leaf to be kept open in full compliance, because it releases the door automatically as soon as the alarm sounds.

Why is the closing selector mandatory on a hinged double-leaf door?

On a double-leaf door set with a meeting stile or central overlap, the semi-fixed leaf must close and lock before the active leaf. If the order is reversed, the active leaf blocks the travel of the semi-fixed leaf, preventing smoke tightness and thermal compartmentation. The selector regulates this kinematics by mechanically holding back the active leaf until the first leaf is completely closed.

Can a standard commercially available door closer be fitted to a certified fire door?

No. The door closer is an inseparable component of the overall approval of the door set. It must appear in the manufacturer's declaration of conformity and hold a certificate of suitability issued according to criteria recognised by the AEAI. Replacing this equipment with an untested model voids the certificate of conformity of the work and directly engages the liability of the installing joiner in the event of an inspection or a fire.

How should one react if stairwell overpressure prevents the leaf from closing completely?

The joiner must never alter the frame clearances or plane the door. If adjusting the final latching action of the door closer is not enough to overcome the air resistance, the problem is one of airflow design. The situation must be formally notified to site management so that the ventilation flow rates are adjusted or a door closer of a higher power class permitted by the certificate is approved.

Texts and standards cited

  • Prescriptions de protection incendie AEAIRequirements for fire doors, automatic closing devices and linked hold-open elements.
  • Norme SIA 118General conditions for the execution of construction work and handling of notices of defects at acceptance.