Key takeaways
- The bathroom requires a privacy lock fitted with an external emergency release device.
- The bedroom requires an ordinary key lock or a simple latch bolt, depending on the brief.
- The technical room requires a security cylinder integrated into the building's master-key system.
- The SIA 343 standard defines the mechanical loads that dictate the use class of the fittings.
Three rooms, three mechanisms: from privacy locking to the security cylinder
On an interior joinery construction site in Switzerland, fitting all doors indiscriminately with the same lock case is a frequent design error. Each room has its own requirements of use, privacy or access control, which determine the functions of the mortice lock, the geometry of the spindle hole and any provision for a cylinder.
- Privacy lock and key lock
- Case recessed into the edge of the door leaf, whose deadbolt is operated either by a lever handle with an interior privacy turn button and an external release slot (bathroom), or by the bit of an ordinary key (bedroom), or by the cam of a profile cylinder (technical room).
For a bathroom or toilet door, the aim is to ensure immediate privacy without any risk of an occupant being trapped inside. A privacy lock is fitted, often referred to as a WC lock. The internal mechanism works with a square spindle connected to a knurled knob or a rocker latch. On the corridor side, the rose must have an emergency release slot, sometimes combined with a red-and-white indicator. If an occupant falls ill, the lock is released from the outside without a key, using a screwdriver blade or a coin. Banning ordinary keys in these rooms avoids the permanent loss of the key set and damage to the door frame caused by forcing the door.
For a bedroom door, the primary function remains holding the leaf shut and moderating noise. In multi-occupancy housing or a detached house, the standard fitting is a lock with a latch bolt and a deadbolt operated by a single-bit or warded key, known as a bit key. In some contemporary projects, designers even opt for a latch lock with no deadbolt at all, since privacy does not require physical locking. Where the bedroom is in a student residence, a hotel or shared housing, the bit key is dropped in favour of a cut-out for a profile cylinder providing individualised locking.
The technical room (boiler room, substation, electrical panel, ventilation room or lift machine room) is subject to radically different constraints. Access must be prohibited to unauthorised persons to prevent operating accidents and protect the technical services. The deadbolt of the lock is operated by a profile security cylinder. Two standards coexist in Switzerland: the Swiss round profile with a diameter of 22 millimetres and the European oval profile of 17 millimetres. The lock case must have a backset and cylinder axis perfectly matched to these profiles, most often completed by a reinforced strike plate fixed into the frame structure.
Use class of the hardware and integration into the key schedule
The sizing of lever-handle and plate sets and of lock cases cannot be carried out without assessing the frequency of operation and the foreseeable rough handling by users. The SIA 343 standard serves as a guide for specifying interior doors and fittings in full agreement with the operating demands of the building.
- Use class of the hardware
- Standardised mechanical classification grading the strength of fittings (handles, return springs, lock cases) according to traffic intensity, ranging from category 1 for moderate domestic use up to category 4 for public buildings with severe loads.
A residential bedroom generally falls under use class 1 or 2, where the mechanism is subject to moderate loads. The lever handle can incorporate a standard return spring housed in the furniture set. Conversely, the door of a technical room in a basement or of a sanitary block in an office building requires class 3 or 4 hardware. Door handles must have massive guide bearings with reinforced coil springs to compensate for the weight of the furniture set and prevent the square from sagging in the spindle hole, which would prevent the latch bolt from retracting fully.
| Room use | Type of mortice lock | Locking device | Recommended use class |
|---|---|---|---|
| Bathroom / Toilets | Privacy lock (WC spindle hole) | Interior knob with external release indicator | Class 2 (housing) to Class 4 (public/communal buildings) |
| Individual bedroom | Bit-key lock or latch lock | Single-bit key or no key | Class 1 or Class 2 |
| Technical room | Security lock with reinforced bolt | Swiss profile cylinder Ø 22 mm or European Ø 17 mm | Class 3 or Class 4 |
Managing technical rooms almost always involves inserting the cylinder into a key schedule. This hierarchical locking plan allows a general master key (held by the caretaker or the technical manager) to open all the heating, electrical and machinery installations, while individual keys unlock only one specific room. The joiner must order cylinders machined with stepped pins conforming to the combination matrix approved by the site management.
Doors and their fittings must be chosen so as to satisfy the requirements of mechanical stability, serviceability and safety according to their specific use.
norme SIA 343
Layout of machining and mortice dimensions according to SIA 343
The SIA 343 standard sets the dimensional and functional requirements for interior doors, dictating the precision of workshop machining to receive the hardware according to the use of the room. A privacy lock for a bathroom, a case for a bedroom bit key or a reinforced case for a technical-room cylinder share neither the same case size nor the same functional drilling. The machining of the edge and faces of the leaf must anticipate the spindle axis, the distance between the operating square and the locking element, and the depth of the mortice. In manufacturing as in rework adjustments on the construction site, a tolerance of plus or minus half a millimetre on the position of the forend directly determines the final flushness and the smooth mechanical action of the bolt.
The Swiss standard mostly favours a 60 mm axis (distance between the door edge and the lever handle axis) with a vertical centre distance of 78 mm. However, depending on the joinery series and the type of cylinder selected (Swiss round RZ profile of 22 mm or European PZ profile of 17 mm), the geometry of the milling varies. The technical-room door generally requires a deeper case to house the reinforced deadbolt mechanism meeting a high use class. Conversely, the bathroom door requires a specific through-drilling for the 7 mm or 8 mm square spindle of the interior privacy knob, combined with an emergency release slot on the outside.
| Door allocation | Type of mechanism | Spindle / bolt centre distance | Handle square / spindle | Mortice depth |
|---|---|---|---|---|
| Bathroom / WC | Latch lock with privacy function | 78 mm | 8 mm / 7 or 8 mm (bolt) | 80 to 85 mm |
| Bedroom | Deadbolt and latch bolt (key) | 78 mm (or 90 mm) | 8 mm / warded key or bit | 80 to 85 mm |
| Technical room | Security lock for cylinder | 78 mm (RZ) or 92 mm (PZ) | 8 or 9 mm (if fire-rated) | 90 to 100 mm |
For the bedroom, the ordinary key lock mainly serves to hold the leaf closed and to provide privacy without any access hierarchy requirement. The standard mortice receives a closed case with a rounded forend 18 mm or 20 mm wide. By contrast, the technical room houses sensitive installations (ventilation, electrical panels, boiler room) requiring a pivoting or double-throw deadbolt in solid steel, which increases the load on the edge of the leaf and makes it necessary to select a forend at least 3 mm thick, firmly screwed into the frame jamb.
Fitting the furniture set, adjusting the cylinder and setting the strike plate
Fitting the hardware begins with inserting the lock into its mortice, without forcing the case. Any rubbing against the timber walls deforms the metal cage and blocks the retraction of the latch bolt. Before the final tightening of the forend wood screws, the joiner offers up the cylinder or the lever-handle and privacy set to check the strict alignment of the drillings. In the case of a technical room integrated into a building key schedule, the Swiss round cylinder with a diameter of 22 mm requires a perfectly perpendicular passage to avoid galling of the internal pins when the master key is inserted.
- Checking the rebate clearance and strike plate alignmentCheck the nominal clearance of 3 to 4 mm between the leading edge of the leaf and the rebate bottom of the door frame. Mark the centre line of the latch and of the deadbolt on the strike side with a fine felt pen.
- Fitting the strike plate and setting the closing pressureRecess the flat or angled strike plate into the frame jamb. Adjust the strike adjustment tongues so that the latch bolt engages positively without any air gap, ensuring uniform compression of the acoustic or smoke seal.
- Fitting the lever handle and mechanical connectionPass the square spindle through the spindle hole, fit the lever handles with their through-bolted roses and tighten the grub screw under the neck to take up the longitudinal play of the handle.
- Validation of operation and safety releaseFor the bathroom, check the emergency release mechanism from the outside using a flat screwdriver or a coin, simulating an occupant falling ill inside.
On communicating doors between bedrooms and bathrooms, use class 2 under the hardware standards is generally sufficient to withstand the loads of a private dwelling. For a technical room receiving frequent operational visits or kept permanently closed by an automatic door closer, the furniture set and the lock must necessarily be of use class 3 or 4. An undersized set leads to premature sagging of the lever handle through breakage of the internal return spring and causes unwanted jamming of the latch bolt against the entry lip of the strike plate.
Managing hardware-fitting non-conformities and remedies on the construction site
On the construction site, hardware-related defects frequently result from a clash between the workshop order for the door sets and the requirements of the overall locking plan. When the latch bolt rubs against the strike plate or the deadbolt refuses to enter its strike without forcing the lever handle, the fault most often stems from a slight twist of the leaf, an out-of-plumb frame or a mortice dimension that does not conform to the drawing. If a privacy lock has inadvertently been delivered with a spindle of the wrong section for the bathroom furniture set, or if the Swiss centre distance does not match the furniture set ordered, forcing the components during screwing compromises the durability of the mechanism from the outset.
- Check the alignment of the machiningMeasure with a rule the axis height of the spindle hole, the forend and the cylinder relative to the edge of the leaf in order to detect any offset of the mortice relative to the frame strike plates.
- Adjust the strike plate without altering the boltRedo the shimming of the adjustable strike plate or move the recess on the frame jamb. Filing bolts is strictly prohibited by manufacturers because it destroys the surface corrosion protection.
- Restore the nominal rebate clearancesCorrect the position of the leaf using three-dimensionally adjustable hinges in order to obtain a constant functional clearance between leaf and frame in accordance with the recommendations of the SIA 343 standard before any commissioning.
- Protect the key scheduleKeep the final cylinders sealed until the final paint touch-ups are complete. Use temporary construction-site cylinders to prevent plaster dust from clogging the precision pins of the master cylinders.
When an installed lock case corresponds to a light domestic use class while the technical room is subject to daily maintenance traffic, the joiner must notify the non-conformity before acceptance of the work in accordance with the SIA 118 standard. A loose lever handle betrays a spindle-hole spring undersized for the frequency of operation. Only replacement with a reinforced-case lock guarantees durable locking without unwanted jamming for users.
Frequently asked questions
What is the difference between a Swiss centre distance and a European centre distance for an interior lock?
The Swiss centre distance is traditionally 78 mm between the axis of the lever-handle spindle hole and the axis of the 22 mm diameter round cylinder, or of the bit key. European-standard locks use a centre distance of 72 mm for a 17 mm European profile cylinder. This geometric difference prevents the direct interchangeability of furniture plates and requires mortice machining precisely set out in accordance with the SIA 343 standard from the manufacture of the leaf.
How do you choose between a warded-key lock and a profile cylinder for a bedroom?
For a standard bedroom in a single-occupancy dwelling, a bit-key or warded-key lock is more than sufficient to delimit the private space. By contrast, in student housing, a residence or a shared flat, the bedroom requires a profile cylinder integrated into the building's key schedule. This system allows the occupant to lock the bedroom with an individual key while guaranteeing a general emergency master key for the building manager.
Why must a privacy lock with emergency release be installed in a toilet?
In a bathroom or toilet, the privacy lock ensures privacy by means of an interior knurled knob while meeting basic safety requirements. If the occupant falls ill or a young child is accidentally locked in, the external slot allows emergency release without any complicated tool, using a simple coin or a flat screwdriver, thus avoiding destruction of the leaf or the furniture set.
How do you determine the use class of a lever handle for a technical-room door?
The lever handle of a technical-room door must meet a high use class because of repeated loads and the sometimes abrupt opening by operating staff. A furniture set mounted on roses with a steel substructure and an integrated return spring is selected. This mechanism prevents the lever handle from sagging, compensates for the friction of the lock and protects the spindle hole against repeated torsion throughout the service life of the building.
Texts and standards cited
- SIA 343Doors and locking systems
- SIA 118General conditions for the execution of construction work
