Key takeaways
- The conformity plate riveted to the edge of the leaf proves the official approval of the element.
- A plate covered with paint or removed is equivalent to an immediate downgrading of the joinery work.
- The fire door register records the approval number as well as all maintenance findings.
- The inspection checks the integrity of the frame sealing, the evenness of the gaps and the release of the hardware.
Locating, protecting and deciphering the identification plate
For fire protection authorities and experts carrying out acceptance of the work, the absence of a legible plate turns an approved door set into a simple wooden panel with no recognised fire-resistance value. The manufacturer's certificate of conformity and the installation record are not sufficient during an on-site inspection. The physical proof lies entirely in this riveted or crimped, non-removable metal plate, which certifies that the complete element manufactured in the workshop corresponds strictly to the certificate issued under the aegis of the Association of Cantonal Fire Insurance Institutions.
- VKF/AEAI identification plate
- Indestructible metal marking fixed at the factory or by the licence holder, showing the Swiss or European approval number recognised by the Association of Cantonal Fire Insurance Institutions, the fire-resistance class of the element and the manufacturer's name.
In interior joinery, the standard location of the plate is on the edge of the leaf, on the hinge side or the lock side depending on the manufacturer's machining templates, generally at standing height between one metre and one and a half metres above the finished floor. For double-leaf doors, each leaf receives its own identification marking. On certain systems with metal frames or matched solid-timber frames, a second stamped plate is fixed directly in the frame rebate to guarantee that the fire-tested assembly cannot be separated.
| Mandatory field | Example of entry | Technical function on site |
|---|---|---|
| Certificate number | AEAI no. 12345 / VKF | Direct link to the official register and the technical data sheet |
| Resistance class | EI 30 / EI 60 | Demonstrates flame tightness and thermal insulation |
| Smoke performance | S200 or Sa | Certifies tightness against the passage of hot or cold gases |
| Manufacturer identity | Company name of the licence holder | Guarantees traceability of wear parts and hardware |
| Year of production | 2026 | Determines the starting point of the maintenance log |
Compiling the technical register and preparing the safety inspection
Compliant installation of a fire door does not end with tightening the mechanical fixings in the structural work and injecting the intumescent sealant. The site manager or the installing joiner must compile the technical file of the work, which will be incorporated into the building's operating log. This file brings together the data sheets, the installer's conformity certificates confirming that the prescribed sealing has been respected, and the individual register listing each door on the site.
- Marking on the allocation planAssignment of a unique identification number to each door on the internal compartmentation plans, corresponding to the physical label on the frame.
- Recording of licence dataEntry in the register of the element's approval number, the date of commissioning and the contact details of the authorised supplier.
- Survey of perimeter gapsMeasurement and filing of the gaps under the leaf, at the head rebate and along the jambs, checked with a feeler gauge according to the tolerances of the approval.
- Checking of the interlocked devicesCompletion of the test sheets for hydraulic door closers, closing selectors on double-leaf doors and electromagnetic holders.
During the acceptance visit by the fire safety authority, the physical inspection is rigorous. The inspector first checks the legibility of the plate, then examines the sealing between the frame and the masonry. Any substitution of an unapproved product, such as standard expanding foam instead of a certified fire-rated mortar or foam, results in a major non-conformity. Automatic closing of the leaf is tested from different opening angles to ensure that the latch bolt engages fully in the strike plate without manual intervention.
Any modification made on site outside the direct scope of the approval, such as unplanned cutting of a glazed vision panel, excessive planing of a hardwood edge or the addition of an untested lock, voids the validity of the plate. If in doubt during installation, the joiner must obtain the written agreement of the holder of the AEAI certificate before interfering with the integrity of the panel.
Safety inspection on the construction site: examining the plate and hold points
During the technical acceptance or the periodic visit by the fire protection authority, the cantonal inspector or the municipal delegate applies a strict principle: a separating element without a clearly legible marking is presumed not to be fire-resistant. Even if the joiner presents validated execution drawings and purchase invoices corresponding to a tested door set, the lack of visual correspondence on the work immediately disqualifies the installation. The identification plate riveted or glued to the edge of the leaf is the only legal link between the physical element fitted in the opening and the AEAI fire protection register.
| Component inspected | Verification criterion on the work | Consequence in case of non-conformity |
|---|---|---|
| Identification plate | Permanent fixing on the edge, clear lettering, match with the AEAI number in the file | Immediate rejection of the element, obligation to start a re-identification procedure with the manufacturer |
| Rebate gaps | Gap of 3 to 4 mm between leaf and frame, no rubbing on the threshold | Rework of the 3D hinges; planing prohibited, risk of loss of approval |
| Intumescent seals | Perfect continuity without interruption at the hardware, no covering layer of paint | Complete replacement of degraded or painted intumescent strips |
| Door closer and selector | Complete closing and latching of the latch bolt in the strike plate without manual help | Adjustment of the speed and final latching screws, replacement if undersized |
| Handle set / lock | Components tested with a solid through spindle and a cylinder complying with the test tolerances | Removal of uncertified hardware and restoration to the approval standard |
Traceability and recording in the fire door register
To ensure the compliance of the building throughout its service life, each door set installed must be methodically entered in the building's fire door register. This document, handed over to the client at the end of the finishing work, contains the complete history of the closure. For each door, the joiner responsible for installation records its precise location according to the marking on the safety plans, the installation date, the full references of the identification plate and the records of the initial check of the gaps and of the automatic closing.
- Joint recording of the plate on the workThe foreman records on site the AEAI recognition number, the year of manufacture, the resistance class (for example EI 30) and the individual serial number stamped on the edge of the panel.
- Photograph of integrity before acceptanceA sharp close-up photograph of the plate is taken, showing the absence of paint and the non-removable fixing method (pop rivets or certified high-strength structural adhesive).
- Documentary link to the registerThe photo and the information are incorporated into the individual sheet of the technical register, together with the installer's declaration of conformity certifying compliance with the manufacturer's installation conditions.
- Emergency procedure in case of damage or lossIf a plate has been torn off or made completely illegible during the works, the joiner may under no circumstances make an in-house label. He must contact the factory holding the approval, quoting the original order number, in order to obtain, after inspection or a written undertaking, an official duplicate plate recognised by the competent authority.
Non-conformity during inspection: altered plate, procedures and rectification
During the acceptance visit carried out by the cantonal fire protection authority or by the safety delegate, the finding of an identification plate covered by a coat of paint, damaged by impacts or missing classifies the element without appeal among the non-compliant works. Even when the door set has a complete file with a declaration of conformity in class EI30 or EI60, the break in physical traceability cancels any presumption of conformity from an administrative standpoint. The fire inspector tolerates no approximation: every physical leaf must carry its AEAI approval identification, directly verifiable on the closing edge.
- Retrieving the complete historyConsult the site's technical register to identify the order form, the production batch and the workshop label corresponding to the door set in question.
- Clean the support carefullyIf the metal plate is dirty or painted, apply a soft cloth soaked in alcohol to clear the text without damaging the original laser marking.
- Request a duplicate from the manufacturerIf the plate is lost or torn off, send the photos of the leaf and the installation references to the manufacturer holding the AEAI recognition in order to obtain an official plate.
- Record the rectification in the registerEnter the incident, the date of intervention and the reference of the new marking in the fire door register in order to prepare the lifting of the reservation.
Where the manufacturer cannot issue a duplicate because of doubt about the origin of the leaf, or where the leaf has undergone alterations contrary to the AEAI fire protection requirements — such as excessive planing of an edge or machining for an unapproved lock —, the element permanently loses its certified fire resistance. In this situation, the site foreman must arrange for the complete removal of the interior joinery element and the installation of a new compliant door, a step that is essential to allow final use of the building.
Frequently asked questions
Who is allowed to fit or replace the identification plate of a fire door?
Only the manufacturer holding the AEAI approval or a joiner authorised under its quality assurance system is permitted to affix or reissue a plate. On site, the installation team may never create a makeshift marking. In case of loss, a formal request is sent to the manufacturer with proof of purchase and photos of the hardware to obtain an official duplicate complying with the requirements in force.
How do you clean an identification plate covered with paint without damaging it?
A metal plate covered during painting work is cleaned with a soft cloth soaked in a light solvent, such as methylated spirits. Never use a metal scraper, a utility-knife blade or abrasive paper. These tools would destroy the laser engraving or the raised information of the AEAI number. Once the information is legible, dry the edge of the leaf and inform the site management.
Which elements of the technical register are checked during the safety inspection of the work?
The safety inspector directly compares the plate riveted to the door with the documents in the fire door register. This technical file must bring together the joinery company's declaration of conformity, the copy of the valid AEAI approval, the door marking plans and the data sheets of the fire-rated hardware installed, such as locks, door closers or sealing gaskets. A gap in the register blocks acceptance of the element.
What is the consequence for the building if a fire door is left without a legible plate?
A door without a legible plate is considered by the fire protection authority to be an ordinary door with no fire resistance. This major non-conformity appears in the inspection report and prevents the issue of the operating or occupancy permit. Moreover, in the event of a fire, the building's insurer may invoke the breach of compartmentation to refuse cover for the material damage resulting from this failure.
Texts and standards cited
- Prescriptions de protection incendie AEAIGuidelines on the use, marking and maintenance of fire-resistant closures
- Norme SIA 118General conditions for the execution of construction work and acceptance of the work