Skip to content
Website
🧱 CFC 273Fire doors: approval and integrityChapter 3 of 10 in the section

Sealing the door frame: prescribed product, complete filling and foam prohibited

This chapter details the sealing methods compliant with the AEAI requirements for fire-resistant door sets. You will learn how to identify the sealing product prescribed by the approval certificate, how to firmly reject standard polyurethane foams that are consumed in a fire, and how to ensure dense, void-free filling of the perimeter gap.

Key takeaways

  • Ordinary polyurethane foam is consumed rapidly by fire and completely destroys the prescribed fire resistance.
  • The sealing material must correspond exactly to the one tested in the AEAI documentation.
  • Non-shrink mortar and high-density mineral wool are the usual proven solutions.
  • Compact, continuous packing over the full depth prevents the passage of hot smoke.

The thermal failure of ordinary expanding foam in a fire

On an interior joinery construction site, the temptation to use a cartridge of standard polyurethane fixing foam remains strong because it is quick to apply. In the case of a fire-resistant door approved by the Association of Cantonal Fire Insurance Establishments, this use is a major non-conformity that destroys the protective function of the closure element. Universal single-component foams, commonly used to take up masonry tolerances on ordinary interior doors, have almost no thermal resistance to the temperatures reached in a fully developed fire.

From the first minutes of a fire under standardised conditions according to the standard temperature-time curve, the exposed face passes through considerable temperature levels. Under heat exceeding two hundred degrees, non-flame-retardant polyurethane pyrolyses, collapses and releases highly flammable toxic gases. The perimeter joint vanishes within moments, exposing a continuous gap between the subframe, the timber or metal door frame and the raw structural work. This breach instantly eliminates the tightness against smoke and flames, even before the door has reached a third of its assigned resistance class, whether rated at thirty or sixty minutes.

The residual space thus created turns the perimeter of the door frame into a veritable draught flue. Combustion gases and flames rush straight into this void, licking the hidden edges of the frame, bypassing the intumescent seals and attacking the mechanical fixings from behind. Differential deformation of the steel or rapid combustion of unprotected timber causes the premature pulling out of the dowels and warping of the door leaf. In the event of an official inspection by the building police or by the cantonal fire-protection expert, the finding of ordinary foam leads to complete dismantling of the work at the installer's expense.

Fire-resistant doors must be installed in accordance with the manufacturer's specifications and the approval documents so that their fire-compartmentation function is guaranteed in the long term.

AEAI fire protection requirements

Prescribed products and execution of complete filling of the installation gap

Closing the installation gap between the mineral structural work and the door frame tolerates no improvisation. The fitter must consult the Swiss technical data sheet and the AEAI declaration of conformity attached to the delivered door. These documents define the only authorised sealing systems: non-shrink grouting mortar, compact gypsum plaster, rigid high-density rock wool, or a specific fire-resistant sealant. Replacing a liquid mortar with loose mineral wool, without the approval providing for this equivalence, immediately downgrades the entire work.

Sealing materials according to frame type and AEAI certificate
Frame typePrescribed approved materialApplication requirementInstallation error risk
Wraparound metal frameNon-shrink fluid mineral mortarContinuous grout injected without air bubblesInjection voids at the hinges
Solid timber subframeHigh-density compressed rock woolPacking to saturation over the full depthInsufficient density letting gases through
Surface-mounted masonry framePacking mortar or refractory plasterApplied with a trowel and pointing ironMortar shrinkage creating a micro-crack
Tubular frame on solid wallElastomer fire-resistant bead and backing cordInstalled to the geometry validated in the testsSubstitution with a neutral sanitary silicone
  1. Cleaning and wetting the substratesCarefully remove dust from the concrete or brick reveal. Dampen the mineral substrate before applying a mortar to prevent premature absorption of the mixing water.
  2. Mechanical wedging and fixingFix the door frame mechanically with the plugs and screws recommended by the approval. Combustible installation wedges must be removed after fixing or replaced by rot-proof, non-combustible wedges.
  3. Continuous packing of the gapIntroduce the prescribed material over the entire section of the profile. If you use rock wool, pack it firmly with a timber wedge to eliminate any air passage.
  4. Finishing and smoke tightnessStrike off the sealing flush with the walls. Where applicable, apply the approved neutral fire-resistant sealant to complete the tightness against cold and hot smoke.

Documentary compliance with the AEAI certificate and traceability of sealing products

Every fire-resistant door set installed on a Swiss construction site must be covered by a rigorous declaration of conformity. The approval issued by the Association of Cantonal Fire Insurance Establishments, designated by the acronym AEAI, never validates an isolated leaf: it attests the performance of a complete system comprising the leaf, the frame, the ironmongery, the type of masonry or lightweight partition substrate, and the precise method of closing the residual space between the frame and the structural work.

The installer must consult the AEAI certificate corresponding to the delivered element before starting any fixing. This data sheet names the sealing product prescribed by the manufacturer during the test-bench trials: non-shrink mortar of a defined class, high-density rock wool of a specific minimum density, or fire-resistant polyurethane foam specifically tested and validated for this reference. Replacing the prescribed binder with a standard hardware-store sealant or single-component expanding foam simply voids the certification of the work.

Permitted packing materials according to frame type and AEAI certificate
Frame typeReceiving substratePrescribed sealing productProhibited foams and binders
Tubular or wraparound metal frameShuttered concrete or fired-clay / calcium-silicate masonryFluid non-shrink cement mortar or intumescent mineral groutSingle-component polyurethane fixing foam, generic so-called installation foams
Corner or surface-mounted metal frameFire-resistant lightweight partition on metal framingHigh-density compressed rock wool (minimum 40 kg/m³) or fibre plasterExpanding fire-resistant foam not listed in the manufacturer's system data sheet
Solid timber frame or block frameHeavy masonry or concreteClass A1 mineral wool with validated intumescent sealing beadThermal insulation polyurethane foams without fire approval
Timber subframe under the revealLightweight plasterboard partitionIntumescent acrylic sealant combined with the system tested by the manufacturerAny fast-curing expanding foam without specific fire-resistant marking

Checking the sealing tolerances and completing the tightness

Complete filling of the installation gap requires control of the spacing between the raw masonry and the back of the frame. The lateral and upper gap must comply strictly with the tolerances set by the installation instructions of the approved manufacturer. A gap that is too small prevents the grout or insulating wool from reaching the bottom of the rebate, creating a vulnerable hot spot. Conversely, an excessive gap subjects the sealing material to a shear stress and a heat flux that exceed the conditions validated in the test laboratory.

In the case of fire-resistant foams admitted by express derogation in certain AEAI approval reports, the ban on non-approved foams applies without compromise. The installer may use only the two-component or intumescent elastomer product expressly mentioned in the technical documents of the door manufacturer. Injection must be carried out from bottom to top, in regular passes, after wetting the rebate bases where the chemical data sheet requires it. No air cavity may remain at the hinges, at the lock's locking points or at the door-closer reinforcement.

  1. Cleaning and preparing the openingsRemove dust from the masonry edges or metal profiles with a stiff brush and eliminate any residue of shuttering oil to ensure adhesion of the grout or sealant.
  2. Mechanical wedging and checking plumbFix the door frame with anchor screws, without unclassified plastic plugs, keeping the gap wedges square without deforming the jambs.
  3. Continuous packing of the perimeter voidInject the fluid non-shrink mortar through the injection holes provided on the metal profile, or insert the non-combustible mineral wool compressed to refusal over the full depth of the section.
  4. Striking off and finishing the edgesRemove the temporary squaring wedges after the mortar has set, fill their impressions with the same sealing product, then apply the prescribed intumescent fire-resistant sealant bead at the bottom of the joint.

Handling sealing non-conformities and rectification protocols

The discovery of ordinary polyurethane foam or partial packing during preliminary site checks is a major blocking non-conformity. In a real fire, this flammable material is consumed within seconds, creating a hot-air channel that cancels the fire integrity of the entire closure. The cantonal fire protection authority or site management firmly refuses acceptance of the work as long as the non-compliant sealing has not been removed. The joiner must then stop fixing the beads and plan a complete redo of the reveal junction.

  1. Complete clearing of the installation gapRemove the timber or metal casings and manually clear out the non-approved foam down to the bottom of the recess, over the full depth of the opening. No combustible residue may remain on the door frame profile or against the raw masonry.
  2. Checking the mechanical anchoragesCheck the tightness and mechanical hold of the through anchor screws or grouted fixing lugs. Stripping operations must not compromise the plumb, the level or the flush clearances required for the correct operation of the leaf.
  3. Repacking with the prescribed productInject the non-shrink grouting mortar under pressure or firmly insert high-density mineral wool mats, in accordance with the installation manual and the AEAI approval certificate. Smooth the edges and inject the fire-resistant smoke-tightness sealant.
  4. Drawing up the rectification recordRecord by dated photographs the state of the cleared rebate and then the dense packing of the perimeter void. Draw up a specific declaration of conformity for the rectification, signed by the installation manager and sent to site management.

Any sealing rectification must be recorded in writing in the acceptance report in accordance with SIA 118. The contractor attaches the technical data sheets of the sealing products used and certifies in writing strict compliance with the AEAI fire protection requirements in order to obtain the formal lifting of the reservations.

Frequently asked questions

Can a polyurethane foam certified as fire-resistant be used if it is not mentioned in the door's approval?

No. Even if an aerosol manufacturer guarantees a fire-resistant foam with an official classification, its use remains strictly prohibited if it does not appear in black and white in the door's specific AEAI approval certificate. The fire-resistant element forms an inseparable assembly tested in the laboratory with a precise sealing product. Replacing the prescribed mortar or mineral wool with a foam not approved by the manufacturer voids the legal validity of the installation.

How should the sealing void be filled if the gap between the door frame and the wall exceeds the planned tolerances?

When the masonry opening deviates by more than the maximum tolerances defined by the door manufacturer, conventional sealing is insufficient. The joiner must record the non-conformity of the masonry to site management. Rectification often requires adding a mechanically fixed non-combustible furring, such as a reinforced plasterboard or calcium silicate board, to reduce the gap to the admissible dimensions before applying the approved sealing system.

Who is authorised to check the conformity of the sealing of a fire-resistant door on the construction site?

Checking falls first to the joiner's installation manager, who takes responsibility by producing the self-inspection and the declaration of conformity. On the construction site, site management and the fire-protection quality assurance officer appointed by the client check the suitability of the products before they are hidden by the cover strips. Finally, the cantonal fire protection authority carries out unannounced audits or destructive probing before issuing the occupancy permit.

Can standard loose glass wool replace high-density rock wool for packing?

No, this substitution is totally prohibited. Ordinary glass wool melts at a much lower temperature than rock wool and does not offer the mechanical strength indispensable against the pressure of a fire. Only dense mineral rock wool, with the minimum density prescribed by the door's approval data sheet, withstands the standard temperature-time curves and ensures thermal insulation without settling or releasing hot gases through the joint.

Texts and standards cited

  • norme SIA 118General conditions for the execution of construction work
  • Prescriptions de protection incendie AEAIGuidelines on the closure of fire-resistant openings and escape routes

In the same section