🧱 CFC 273Claddings, skirting boards and parquet installationChapter 5 of 10 in the section

Changing floor covering: threshold, level difference and clearance maintained on both sides

This chapter details the installation of transition thresholds between timber floors and other floor coverings. You will learn how to select and fit technical profiles that preserve the freedom of movement of both floor build-ups, how to deal with level differences according to Swiss rules, and how to place the edge of the profile exactly beneath the door leaf.

Key takeaways

  • Through-fixing screws that restrain the timber floor against the tiling cause cupping and edge spalling.
  • The SIA 253 standard prescribes a minimum perimeter clearance to be maintained along transitions.
  • A two-part profile fixes the base to the substrate while leaving each floor covering free.
  • The centreline of the threshold profile must fall precisely beneath the closing line of the hinged door leaf.

Rigid bridging: how the defect arises and selecting decoupled profiles

The classic error seen when connecting two floor coverings of different types is to lay a flat perforated bar and screw it directly through the materials into the screed. By mechanically locking a multilayer or solid timber board to the adjoining covering, whether porcelain stoneware tiles or resin, the joiner removes the timber's freedom to shrink and swell. Under indoor climate variations between the heated winter and the humid summer, the timber exerts a continuous thrust on the fixing screws. The stresses inevitably result in the bar lifting, the plugs being pulled out, the tile edges deteriorating or the adjacent timber bay cupping.

Timber floor coverings must be able to expand and contract freely around their entire perimeter and at transitions with other floor coverings or fixed building elements.

Norme SIA 253

To meet the requirements of the SIA 253 standard without compromising the visual tightness or the mechanical strength of the passage, the tradesperson must specify two-component profiles or groove systems. The system is based on a technical base mechanically fixed or bonded to the bare screed, inserted into the gap left between the two floor coverings, combined with an upper cover section that is clipped on or hinged on a central pivot. The base touches neither the timber nor the tiling; both materials slide freely beneath the wings of the upper profile. A clearance of at least eight millimetres remains available on each side of the central pivot to absorb the maximum foreseeable movement of the timber floor.

Behaviour of transition systems under humidity stress
Profile typeConnection to substrateTimber expansion clearanceConsequence for the work
Flat bar screwed throughScrew anchored through the timberNone, direct rigid clampingEdge cracking, creaking, pull-out
T-profile bonded with flexible sealantBonded on edge without baseLow, limited to the elasticityLoss of cohesion, premature detachment
Two-piece profile with screwed baseScrew in the provision jointFull, under the cover wingFree movement guaranteed, durability compliant with SIA

Positioning beneath the door leaf and managing height differences

The spatial positioning of the dividing line follows a strict geometric rule: the visible boundary between the two floor coverings must never be visible when the interior door is closed, whether the observer stands on one side of the room or the other. For a standard overlap door or flush door, the centre of the transition threshold is set strictly beneath the core of the closed door leaf, generally offset towards the stop face of the door frame or reveal frame. If the junction is positioned in the middle of the wall thickness without taking the rebate into account, a strip of the adjoining room's floor remains visible along the bottom of the closed door, which is an unacceptable appearance defect at acceptance of the works.

Level difference
Localised vertical difference in height between two adjacent finished floor surfaces, caused by varying material thickness or an unevenness of the screed substrate.

When the joiner connects a new timber floor of standard thickness of fourteen millimetres with an existing thinner tiling or a carpet, a vertical offset often appears. The SIA 253 standard and the Swiss guidelines on barrier-free construction strictly limit the height of unchamfered steps in door passages to prevent tripping hazards. A difference of up to three millimetres can be absorbed by a slight chamfer or an asymmetrical lip on the profile. As soon as the level difference exceeds this value, a sloped transition profile with a gentle ramp is required. The slope of this transition profile must remain moderate to ensure smooth crossing without foot catching or impact against door bottoms fitted with Swiss automatic drop seals.

  1. Marking out the position beneath the door leafTemporarily close the door on its adjusted hinges and mark in pencil on the screed the precise line of the underside of the leaf.
  2. Fixing the technical baseAlign the profile substructure on the marked line, ensuring a gap of at least eight millimetres to each edge of the finished floor.
  3. Adjusting the cover profileSnap or clip on the finishing cover, checking that the wings press evenly on both floors without compressing the timber floor.

Installing systems with a technical base and maintaining clearances in accordance with SIA 253

To connect a timber floor to another floor covering without creating restraint, the joiner installs a decoupled system made up of a fixing base and a removable cover profile. The error of screwing a flat bar through both floor coverings pins the elements to the substrate and eliminates any shrinkage or expansion movement. The SIA 253 standard requires a continuous perimeter clearance to be maintained to absorb the dimensional changes of the timber due to humidity. A two-part profile meets this requirement: the support profile is fixed directly into the mineral screed or onto the raised floor, while the upper element is clipped, slid or screwed onto the central pivot without ever mechanically clamping the floor finishes.

  1. Marking out and positioning the baseLocate the precise line of the closing position beneath the door leaf to ensure the junction is invisible when the door is closed. Snap a line to mark the laying line of the aluminium or technical polymer base directly on the dust-free bare screed.
  2. Drilling and mechanical fixing into the substrateDrill the mineral screed with a suitable bit without hitting any embedded underfloor heating pipes. Insert the drive-in plugs or anchor screws to secure the lower profile. In the case of a screed with very shallow underfloor heating, replace the mechanical fixing with a high-structural-strength hybrid polymer adhesive.
  3. Providing the edge clearance and wedgingAdjust the timber floor boards, keeping a free distance of at least 8 millimetres from the vertical web of the base. Never fill this provision with a rigid sealant, a levelling compound or residual parquet adhesive.
  4. Snapping on the upper finishing profileInsert the notched pins or drive the cover bar home using a dead-blow mallet and a sacrificial timber block. The profile caps the edges of the floor coverings while leaving sufficient vertical clearance to allow horizontal sliding without vibration or rattling.

Levelling height differences and positioning in the door opening

On conversion or renovation construction sites, the meeting of a bedded tiling, a thin screed and a laminated timber floor frequently produces a height offset. A transition threshold must compensate for this level difference while respecting walking-comfort tolerances and barrier-free accessibility rules. The SIA 500 standard strictly limits unchamfered vertical steps inside living spaces to prevent tripping hazards and allow wheelchairs to pass. The choice of profile therefore depends on the geometry of the residual step and on the system's ability to accommodate the difference in thickness.

Types of transition profiles and management of level differences
Level configurationRecommended profileMaintaining the expansion clearanceCompliance for crossing
Strictly identical levels (difference less than 2 mm)Flat transition profile on notched central pivotFree sliding beneath both symmetrical cover wingsFlat surface without step, completely smooth passage
Moderate level difference (difference of 2 to 12 mm)Sloped levelling profile with tilting base or ball jointTotal freedom of movement on the timber floor side thanks to the calculated overhangGentle slope forming a chamfered ramp compliant with safety requirements
Significant level difference (difference of 12 to 25 mm)Extruded aluminium adaptation threshold with compensating counter-profileClearance provided behind the vertical stop without tight contactAcceptable in renovation with a wide chamfer to limit the angle of impact
Connection with thin textile flooring or poured resinEdge termination profile with asymmetrical return slopeClean termination of the thin covering and open clearance beneath the wing on the timber floor sideProgressively falling edge to prevent mechanical tearing of the edge

The axial position of the profile in the opening is essential for the overall appearance of the interior fit-out. The alignment must correspond exactly to the plane of the door leaf when the door is closed. In an opening fitted with a reveal frame or a rebated frame, the floor profile is placed beneath the thickness of the door, precisely in line with the interior rebate. In this way, the separation between two visually distinct materials — such as an oak timber floor in a bedroom and natural stone in a corridor — remains completely concealed, whether the observer stands on one side or the other of the closed partition.

Diagnosing and remedying mechanical restraint: repair procedure beneath the door opening

When a floating or laminated timber floor lifts in a ridge at a door opening, or when an adjoining tile chips under stress, the technical diagnosis almost systematically reveals a rigid bar screwed across both materials. This direct restraint prevents the timber from absorbing the seasonal dimensional changes caused by ambient humidity. The thrust of the timber is then exerted against the screws, pulling out the plugs or shearing the edge fixings. According to the requirements of the SIA 253 standard, each floor build-up must imperatively retain its independence of movement, particularly at the junctions of rooms subject to different thermal regimes.

  1. Removing and clearing residual fixingsUnscrew the defective bar. If screws are seized or corroded, cut off the heads with a straight grinder, then grind the metal shanks flush with the screed so as to completely clear the door opening.
  2. Re-establishing the expansion jointMark the cutting line beneath the alignment axis of the future door leaf. With a plunge saw guided on a rule with connected dust extraction, trim the edge of the timber floor to provide the space required by the SIA 253 standard, carefully preserving the underlying decoupling felt.
  3. Anchoring the base in the mineral substratePosition the anchoring profile exclusively in the gap between the two floor coverings. Drill the slab or screed while controlling the depth to avoid embedded conduits, then mechanically plug the base without creating any lateral contact with the timber.
  4. Adjusting the hinged levelling coverInsert the cover strip into the channel of the base. The pivoting mechanism automatically adapts to any level difference, ensuring firm bearing on the floor coverings while preserving the transverse sliding clearance beneath the lips.

If the level difference exceeds the values permitted for easy crossing, the joiner must use a gentle-slope compensating profile, avoiding any abrupt step likely to cause tripping. The final installation must be checked to confirm that the trim is concealed once the door is closed, respecting the visual harmony between the two spaces.

Frequently asked questions

How do you level a ten-millimetre step between a solid timber floor and a thin tiling without creating an obstacle?

To bridge a marked level difference without breaching accessibility requirements, use a bevelled transition profile with progressive slope mounted on a central base. The profile guides the step without a sharp edge. The technical base is plugged directly into the screed between the two floor coverings, while the adaptation tongue adjusts to the exact height of the timber while maintaining the necessary expansion space beneath the higher edge.

Where exactly should the threshold profile be aligned in an interior door opening?

The transition threshold must be positioned strictly in line with the closing rebate of the frame. When the door is closed, the door leaf must completely conceal the metal profile and the junction of the floor coverings, both from inside the room and from the adjoining hallway. An offset of a few millimetres makes the transition bar visible and spoils the overall appearance of the work.

Can a flat threshold be bonded directly onto the timber floor and the tiling with a hybrid adhesive?

Simultaneous bonding to both materials is prohibited. By linking the screed or rigid tiling to the timber floor, you block the shrinkage and swelling movement of the timber. The adhesive film will eventually tear off the wear layer of the timber floor or cause the boards to cup in the humid season. Only bonding a decoupled technical base onto the bare substrate guarantees durability.

What minimum expansion clearance must be provided between the screed, the profile base and the edge of the timber floor?

In accordance with the rules of the SIA 253 standard, a free space of at least eight to ten millimetres must be provided between the cut edge of the timber floor and the central axis of the technical base. This margin allows the timber to move freely under thermo-hygrometric variations without butting against the aluminium anchoring part. The cover cap overlaps this gap by at least five millimetres.

Texts and standards cited

  • SIA 253Bonded and floating floor coverings: laying rules, expansion joints and decoupling at transitions