Fire doors: approval and integrity: the execution reference

Intended for team leaders and foremen in interior joinery, this section covers the strict conditions for installing fire-rated door assemblies in accordance with the AEAI directives and standard SIA 343. Installing a fire door means faithfully reproducing the element tested in the laboratory: any undocumented alteration voids the certificate of conformity. This file details the permitted limits of intervention, the fixing and sealing, and the checks to be made before acceptance by the authority.

  • 10chapters
  • 22 000words
  • 6sections in the training course
  • 60chapters in total

Key values to remember 4

AEAI fire protection directives

30 to 90

Standard fire resistance duration (EI 30, EI 60, EI 90) required for doors depending on use

Norme SIA 343

max. 4

Usual fitting clearance under the leaf with an automatic drop seal to ensure tightness

AEAI fire protection directives

100

Required filling rate for the mortar sealing between the metal frame and the masonry

Art. 371 CO

5

Statutory limitation period for construction defects in a building under the Code of Obligations (CO)

Technical scope of the door assembly and limits of supply

In Swiss finishing work, the fire-resistant door assembly is not a collection of components chosen at random on site, but a complete certified system, inseparable from its AEAI certificate of use. The approval covers a rigorously tested assembly: leaf, metal frame or timber frame, ironmongery, lock, cylinder, door closer, sealing gaskets and the system for fixing it to the structural work. The role of the CFC 273 joiner is to take over a rough opening prepared by the preceding trades, check that the substrate is suitable and fix the element without altering its fire-resistance characteristics.

Any direct intervention on the core of the leaf or on the frame profile constitutes a substantial modification liable to destroy the fire behaviour. Planing an edge beyond the factory tolerance, cutting a vision panel on site, inserting a non-approved ventilation grille or substituting a fixing adhesive not mentioned in the test report is a direct breach of the AEAI fire protection directives. In the event of a fire or during inspection by the fire protection authority, the modified element is systematically downgraded and rejected, directly engaging the liability of the installing company.

Fire-resisting closures must be installed in accordance with the manufacturer's installation instructions and the test reports on which the issue of the certificate of use was based.

AEAI fire protection directive

Logical reading order and installation methodology

To guarantee the integrity of the fire-resisting closure and to prepare calmly for acceptance of the work, the chapters of this section should be read in the exact chronological order of the on-site operations, from the examination of the delivered package to the final approval by the authority.

  1. Understanding the certified element and its geometric limits (P2-01 to P2-03)The joiner begins by identifying the exact composition of the complete certified system from its delivery documents (P2-01). He then checks the height fit to the finished floor: the bottom of the leaf tolerates only a minimal adjustment, strictly documented, failing which the thermal barrier at the bottom rail is destroyed (P2-02). Installation continues with the rigorous fixing of the frame, where the use of mineral mortar or approved products formally excludes standard expanding foams (P2-03).
  2. Securing the active functional components (P2-04 to P2-06)Tightness against hot gases depends on the intumescent seal, which must suffer no break and no stray coat of paint (P2-04). The door must absolutely close by itself, by means of an adjusted door closer and a closing sequence selector for double-leaf doors, and any mechanical blocking by a wedge is prohibited (P2-05). Faced with late requests to cut a vision panel or run cables through, the installer must know how to give a formal refusal in order to preserve the approval (P2-06).
  3. Dealing with combined requirements and validating conformity (P2-07 to P2-10)The critical case of the flat entrance door combines fire resistance, sound insulation, air tightness and burglar resistance (P2-07). The work must bear its numbered metal plate in order to be entered in the safety register (P2-08). The file ends with the organisation of the mandatory periodic maintenance (P2-09) and the handling of non-conformities or refusals issued during the building inspection visit (P2-10).

Careful application of the installation requirements set out in these ten chapters is the only way for the joinery workshop to obtain the release of financial guarantees and to ensure real protection for people using the escape routes.

📘 Chapters in this section 10

Fire doors: approval and integrity

The complete element: leaf, frame, seals, hardware and test report

Master the list of inseparable components that guarantee the legal validity of your AEAI certificate on the construction site.

Fire doors: approval and integrity

Trimming the bottom: the permitted limit, and the approval lost at the next millimetre

Find out the exact cutting tolerances at the bottom rail to avoid immediate downgrading of the leaf.

Fire doors: approval and integrity

Sealing the door frame: prescribed product, complete filling and foam prohibited

Apply full mortar filling techniques and identify the fixing products that are strictly prohibited.

Fire doors: approval and integrity

The intumescent seal: position, continuity, painting prohibited and visual inspection

Preserve the effectiveness of the intumescent seal against hot gases by avoiding common overlapping mistakes.

Fire doors: approval and integrity

A fire door must close again: door closer, selector and no wedging allowed

Adjust the control and closing devices to guarantee flawless compartmentation in all circumstances.

Fire doors: approval and integrity

Drilling or cutting an approved element: glazing, grille, cat flap, and the refusal that is required

Identify the machining modifications strictly prohibited on the construction site so as to justify your technical refusals to the client's representative.

Fire doors: approval and integrity

The flat entrance door: fire-resistant, acoustic, burglar-resistant — four requirements at once

Combine acoustic, fire and burglar-resistance performance without degrading the original certification of the entrance door assembly.

Fire doors: approval and integrity

Proving compliance: identification plate, register and safety inspection

Check for the presence of the official metal marking and prepare the documents essential for the municipal inspection.

Fire doors: approval and integrity

Maintaining: periodic inspection, points to check and handover of instructions

Structure regular visual and mechanical checks to maintain the certified performance throughout the operation of the building.

Fire doors: approval and integrity

Rejected at inspection: record, full replacement and cost allocation

Handle challenges from the fire inspector and deal with non-conformities without compromising your company's liability.