Key takeaways
- The intumescent seal provides tightness against flames and hot gases during a fire.
- Any coat of paint on an intumescent seal blocks its thermal expansion at high temperature.
- The profile must be perfectly continuous, without interruption, in the corners of the door frame.
- The visual acceptance inspection checks integrity, bonding and conformity with the AEAI certificate.
Behaviour of the intumescent seal and the destructive risk of painting
On a wooden or metal fire door, the intumescent seal is the reactive sealing element. In normal service, a functional gap of three to five millimetres remains between the leaf and the frame to allow the leaf to swing freely. In the event of a sudden rise in temperature caused by a fire, this gap becomes a critical passage for hot gases and flames. The intumescent material, generally made of expandable graphite or hydrated sodium silicate, expands in volume under the effect of heat as soon as the temperature exceeds 150 to 200 degrees. It then forms a microporous mineral foam that fills the air gap, blocks the oxygen supply and thermally stabilises the edges of the leaf.
To avoid this frequent dispute between finishing trades, the joiner must systematically protect the intumescent strips before the painters begin work. Several manufacturers supply a factory-fitted peelable protective film, which should only be removed after the finishes have dried completely. If the seal is fitted bare, the joiner applies a resistant masking tape and expressly flags the ban on covering the seals with a temporary notice on each leaf. According to the AEAI fire protection requirements, any element modified or damaged relative to the test report immediately loses its official recognition.
- Intumescent expansion
- Thermochemical reaction in which a solid material increases to ten to forty times its initial volume under intense heat, creating an insulating barrier that is tight against combustion gases.
Positioning, continuity and visual inspection protocol at acceptance
The positioning of the intumescent seal tolerates no improvisation on the construction site. It must correspond strictly to the sectional drawings validated by the approval certificate of the Association of Cantonal Fire Insurers. Depending on the EI30 or EI60 door models, the strips are inserted in a groove machined in the bottom of the rebate of the fixed frame, bonded directly to the edge of the leaf, or arranged as an asymmetrical double barrier. The thickness and width of the strip must comply with the manufacturer's tolerances to the millimetre.
| Door rating | Typical installation | Required continuity | Hardware vigilance |
|---|---|---|---|
| EI30 swing door | Central frame groove or leaf edge | Three sides without interruption | Clean routing around lock faceplates |
| EI60 swing door | Double parallel strip on frame and leaf | Three sides with overlap at the corners | Plates under hinges and lock case |
| Double-leaf door | Edge jambs and central meeting stile | Four sides on the active leaf | Additional seals in the rebate profile |
The physical continuity of the seal determines the overall resistance of the door assembly. An interruption of a few centimetres, often found at electric strike plates, hinges or in the upper corners of the door frame, constitutes a thermal breach through which hot smoke attacks the solid wood. In the corners, the joint must be fitted with a tight square cut or mitre, with no visible gap. At recessed hardware, the installer must cut the seal as close as possible to the faceplate and insert pre-cut intumescent spacers under the metal parts to compensate for the loss of wood material.
- Surface examinationInspect the entire profile on the jambs and the head to verify the absolute absence of paint, varnish, plaster or fitting adhesive.
- Adhesion checkCheck by hand the bonding of the strip at the bottom of the groove. No detachment or blistering of the adhesive tape may be tolerated.
- Checking for interruptionsCheck for the presence of intumescent insulators under lock faceplates and at the hinges according to the manufacturer's data sheet.
- Recording in the reportCertify visual conformity in the installation report intended for the fire protection officer and record any rework required under the rules of standard SIA 118.
Site coordination and protection of intumescent strips during finishing work
On Swiss construction sites, the most destructive damage suffered by a fire door assembly rarely comes from a machining defect, but from the unintentional application of a coat of paint on the intumescent strips. The decorator painter, working as part of the finishing work, legitimately seeks to deliver a clean and uniform rebate. Seeing a dark strip or a profile set into the groove of the jamb or on the edge of the leaf, they apply their undercoat and then their finishing lacquer. This finishing gesture neutralises the door: the hardened synthetic binder layer forms a shell that restrains or delays the thermal expansion of the component, preventing the gaps from being sealed in the event of a fire.
To avoid this damage with serious consequences, the joiner responsible for the interior joinery package must organise the passive protection of their elements from the installation of the door frame and the fitting of the leaves. Prevention cannot rely on verbal vigilance on site alone. It requires a rigorous interface protocol between trades, communicated in writing to site management and recorded in the site diary.
- Application of a peelable masking tape with low adhesive strength, either directly in the factory or immediately after the leaf is hung on site.
- Placing a bright-coloured temporary warning label in the rebate bearing the explicit wording: Do not paint - fire seal.
- Handing a site interface sheet to the painter foreman reminding them that the fire rebate seals must not be altered.
- Coordination at site meetings to prohibit the application of varnish, solvent-based lacquers or dispersion paints on the edges fitted with seals.
Remediation protocol and visual inspection before acceptance of the work
The acceptance of a fire-resistant swing door assembly requires a systematic and documented visual inspection. In accordance with the requirements of the Association of Cantonal Fire Insurers (AEAI), each installed door must correspond in every respect to the certificate of use issued for the tested system. The joiner checks the physical integrity of the material, its geometric positioning and its perfect continuity around the perimeter of the rebate, in particular at the upper corners and at recessed ironmongery.
- Finding and notificationIdentify the leaves or door frames whose intumescent seals show traces of paint, cuts or detachment, and notify the defect without delay to site management.
- Complete clearing of the grooveRemove the soiled strip by completely extracting the self-adhesive tape or the extruded rigid profile, then clean the bottom of the groove in the wood with a clean chisel to remove all traces of residual adhesive.
- Like-for-like replacementFit a seal strictly identical in width, thickness and chemical composition to the one specified in the door manufacturer's AEAI approval file.
- Jointing and adjustmentEnsure a neat mitre cut at the corners with a gap of no more than half a millimetre and route precisely around the lock and hinge faceplates without interrupting the active material.
| Defect found | Consequence for the door | Corrective action required |
|---|---|---|
| Paint film covering the active surface | Mechanical blocking of thermal expansion at 150 °C | Complete replacement of the strip in the groove |
| Seal interrupted at the hinges | Thermal weak point and early passage of hot smoke | Fitting of intumescent pads under the ironmongery |
| Seal detached or showing waviness | Rubbing against the leaf and tearing off in use | Reworking of the bottom of the rebate and bonding under pressure |
| Intumescent strip cut too short at a corner | Leakage of hot gases in the first minutes | Butt jointing with no visible air gap |
At the end of this check, the joiner records the results in the internal inspection report. According to standard SIA 118, these preliminary checks ensure the conformity of the work before the official visit by the cantonal fire protection authorities. The final AEAI certificate of conformity can only be signed when every linear metre of intumescent seal is confirmed to be free of paint, continuous and firmly anchored in its original groove.
Handling non-conformities: joint inspection record, replacement and traceability
When a visual inspection at acceptance reveals that an intumescent seal has been covered with paint, primer or varnish by the painter, the door assembly loses its certified conformity. The chemical action or the dry film blocks the expansion of the sodium silicate or graphite under thermal effect, violating the AEAI requirements. In the face of this failure, no scraping, superficial sanding, or thermal or chemical stripping is permitted on site. These interventions irreparably alter the intumescent core and damage the rebates of the leaf or frame.
The only compliant solution is complete replacement of the affected seal. The joiner site foreman draws up a joint inspection record signed by site management and the decorator painter, recording the doors affected and the type of strip concerned. The joiner carefully removes the soiled element, cleans the bottom of the groove by gentle mechanical scraping without damaging the wood, then dusts and degreases the rebate. The new intumescent gasket must correspond to the exact component specified in the AEAI certificate of the closing element (same brand, same nominal dimensions and same reaction class).
- Joint inspection recordIdentify all painted elements, record the site reports and suspend acceptance for these doors.
- Removal and preparation of the grooveExtract the entire soiled seal. Clean the recess without changing the geometry of the groove or widening the operating gap.
- Installation under continuity controlFit the replacement seal in one piece on each edge, paying particular attention to the corners and ironmongery to ensure total continuity.
- Updating the traceability fileRecord the replacement in the building's fire safety file, attaching the data sheet of the new component for final validation.
If the door had a factory-fitted recessed seal that cannot be replaced on site without heavy machining, the painting error requires replacement of the leaf or the frame. The associated costs of restoration or replacement are the responsibility of the painting company, but the joiner remains the guarantor of the final conformity of the door assembly with regard to the AEAI requirements and the rules of the trade under the Code of Obligations (CO).
Frequently asked questions
How should you react if the painter has partially covered the lips of a combined fire and acoustic seal?
Partial covering of a combined profile cancels its dual function. The paint stiffens the elastomer lip providing acoustic and cold-smoke tightness, while restraining the expansion of the underlying intumescent material. Attempting to dissolve the paint is out of the question. The entire profile must be removed, the groove cleaned, and then a new identical AEAI-approved profile fitted in one piece.
Why does the ban on painting the seal also apply to water-based or microporous paints?
Even a water-based dispersion or a microporous paint forms a cohesive synthetic film as it dries. In a fire, this polymer skin delays the thermal activation of the intumescent compound by shielding the graphite or silicate from the rise in temperature. The volume expansion essential for sealing the gaps between leaf and door frame is thereby compromised, resulting in loss of integrity of the fire door according to the AEAI criteria.
Who validates the conformity of the intumescent seal during the final visual inspection before acceptance?
The final visual inspection is the joint responsibility of the installing joiner and site management, often assisted on site by the fire protection expert. The inspector verifies the total absence of paint, the linear continuity of the strips without breaks in the corners, proper seating at the bottom of the groove and documentary consistency with the AEAI certificate of conformity supplied by the door assembly manufacturer.
What should be done if the door assembly manufacturer has stopped producing the original intumescent seal?
If the exact reference of the intumescent seal is no longer marketed, the joiner may not install an equivalent profile on their own initiative. They must approach the holder of the declaration of conformity or seek a technical opinion from the testing laboratory that issued the original AEAI approval. Only a spare part validated by the certificate holder preserves the technical and legal integrity of the door.
Texts and standards cited
- Directives de protection incendie AEAIFire protection requirements and rules applicable to fire doors
- Norme SIA 118General conditions for the execution of construction work and handling of defects
- Code des obligationsGeneral rules on the contract for work and the contractor's liability
