Key takeaways
- The survey of hanging and folded clothing volumes determines the initial layout of the vertical carcasses.
- A hanging rail requires at least 580 mm of usable depth to prevent the hangers from rubbing.
- Usable heights range from 900 mm for shirts to 1600 mm for long coats.
- Integrating LED profiles and maintaining air circulation prevent overheating and ambient mould.
Surveying the needs: the four usage questions before drawing the carcasses
A made-to-measure wardrobe layout is not judged by the symmetry of its fronts or the quality of its finishes, but by its ability to absorb the actual clothing inventory without creating dead volume. All too often, the joiner draws modules of equal width before even asking about the occupants' daily habits. The result is overloaded rails topped by inaccessible shelves where clothes pile up in disorder. Technical design must begin with a methodical listening to the client's needs.
- 1. The ratio between hanging and folded clothingQuantify the linear metres of hanging rail required against the number of shelves needed. Someone who keeps shirts on hangers does not have the same needs as a user who favours folded knitwear and T-shirts.
- 2. The precise type of hanging garmentsDistinguish clearly between short and long garments. Providing too much height for shirts wastes valuable vertical volume, while a creased dress at the bottom of a carcass reflects an unforgivable design error.
- 3. Managing accessories and small itemsDetermine the number of closed drawers with compartments needed for underwear, belts and jewellery. These items require full-extension runners and an ergonomic position between knee and chest height.
- 4. Frequency of use and seasonal rotationIdentify everyday clothes, to be placed in the middle zone with direct access, and out-of-season items, which will go on the top shelves or in deep corners under the ceiling.
The usable depth of the unit follows directly from the closing system chosen by the client. With a conventional hanging rail, an adult hanger measures between 420 mm and 460 mm in width. Once the garment is on its hanger, the thickness of the fabric brings the average transverse space requirement to 550 mm, and up to 580 mm for a winter coat. With hinged doors, the minimum usable depth of the carcass is 580 mm. For sliding doors, 80 mm to 100 mm must be reserved for the double track and the clearance of the handle profiles, which requires a minimum total depth of 660 mm to 680 mm.
| Type of storage | Net usable depth | Recommended total depth | Consequence of underestimating |
|---|---|---|---|
| Standard longitudinal hanging rail | 580 mm | 600 mm | Sleeves rubbing when the doors are closed |
| Transverse telescopic hanging rail | 380 mm | 400 mm | Storage capacity halved compared with a straight rail |
| Shelves for linen and T-shirts | 400 mm | 450 mm | Unstable piles of clothes if too deep, or overhanging if too short |
| Shelves for flat shoes | 320 mm | 350 mm | Front cannot be closed, or overhang into the circulation space |
Execution dimensions: usable heights per garment, LED profiles and air renewal
The vertical distribution of the levels dictates the everyday ergonomics of the unit. A common execution mistake is to fix the rail too high or to neglect the space needed to get a hand in. A clear gap of at least 50 mm must be provided between the upper edge of the hanging tube and the underside of the top shelf so that the hanger can be hung easily. The usable heights are then calculated rigorously from the drop of the hanging garments.
| Garment category | Clear height under rail | Typical vertical spacing | Workshop recommendation |
|---|---|---|---|
| Shirts, jackets and short skirts | 950 mm | 1050 mm | Allows two levels of short hanging to be stacked |
| Trousers hung by the waist | 1150 mm | 1250 mm | To be replaced by a sliding trouser rack under 800 mm |
| Standard dresses and mid-length trench coats | 1350 mm | 1450 mm | Keep the lower part clear for placing boxes |
| Long coats and evening dresses | 1600 mm | 1700 mm | Provide a separate module so as not to break the modular grid |
Careful integration of lighting enhances the layout without creating glare. The joiner machines in the workshop a groove 15 mm wide and 12 mm deep, angled at 45 degrees in the inner edge of the upright or under the top shelf, to take an aluminium profile fitted with an opal diffuser. The machining must be clean, without chipping of the melamine, and provided with 8 mm blind holes guiding the wires towards the power supplies. The electrician then connects into these recesses without ever leaving cabling exposed.
Sizing the volumes: critical depths, hanging heights and load-bearing capacity
In interior fit-out under the CFC 273 standard, the functional failure of a wardrobe almost always stems from confusing overall dimensions with usable internal space. Building a carcass with an overall depth of 600 mm with sliding doors mounted on the inside reduces the hanging space to less than 510 mm: jacket sleeves rub against the door stiffeners, hangers pivot at an angle and the fittings force the sliding. For a hanging rail closed by hinged or sliding doors, the trade rule requires a clear space of at least 560 mm between the back of the rear panel and the rear face of the frame or inner track. Conversely, allocating this same 560 mm depth to shelves for jumpers or folded shirts creates dead volume or an unmanageable double row in daily use: the rear pile disappears from view and collects dust.
| Garment type | Usable height under rail | Net carcass depth | Installation constraint in workshop and on site |
|---|---|---|---|
| Shirts, short jackets, suit jackets | 950 mm to 1050 mm | 560 mm to 580 mm | Rail axis positioned 60 mm below the top shelf, centred 280 mm from the back. |
| Trousers hung from the bottom | 1100 mm to 1200 mm | 560 mm to 580 mm | Allows full-extension runners to be integrated for telescopic trouser racks. |
| Long coats, dresses, trench coats | 1500 mm to 1650 mm | 580 mm to 600 mm | A clear space of at least 150 mm above the floor must be provided to avoid collecting dust. |
| Folded clothing (T-shirts, fine jumpers) | 250 mm to 300 mm per compartment | 380 mm to 420 mm | Bay width limited to 800 mm with 19 mm panel to prevent sagging. |
| Bulky jumpers, bedding, duvets | 350 mm to 450 mm per compartment | 450 mm to 500 mm | Minimum shelf thickness increased to 25 mm, or front reinforcement with a solid timber edge strip. |
Managing shelf spans is a critical sizing point. On a bay wider than 800 mm, a 19 mm melamine-faced chipboard or wood-based panel creeps under a continuous load of heavy clothing. Beyond this width, the workshop foreman must specify a 25 mm carcass thickness or incorporate a recessed metal stiffener on the underside of the shelf. Likewise, oval aluminium rails of standard 30 x 15 mm section sag under the weight of coats if the span exceeds 900 mm without an intermediate support fixed under the upper shelf.
Air circulation, LED strip integration and usage survey sheet
A made-to-measure wardrobe closed from floor to ceiling is a confined volume that retains the residual moisture of worn textiles. If the unit is placed against an external wall with a slight thermal bridge, the absence of ventilation quickly produces musty smells and a risk of fungal attack behind the back panels. The joiner must provide a 20 mm air gap between the bare wall and the back of the unit, complemented by a passive through-flow of air: an invisible 10 mm undercut set back from the lower skirting and an exhaust slot of equivalent section in the compensation strip running under the ceiling. If the wardrobe has perfectly sealed fronts fitted with brush seals, machining discreet oblong slots at the top and bottom of the carcass prevents the ambient air from stagnating without spoiling the appearance of the project.
Lighting must be planned from the cutting of the panels at the bench. Surface-mounted LED strips are not acceptable on quality work: they must be recessed in anodised aluminium profiles grooved flush into the vertical edges or under the fixed shelves. The aluminium profile provides a mechanical holding function but also acts as a heat sink, which is essential to preserve the life of the adhesive and the component. The recess machining must direct the light flow towards the inside of the carcasses at 45 degrees to light the front of the garments without dazzling the user. Holes for low-voltage conductors must be made in the workshop in the intermediate uprights, with the transformer housed in a ventilated void or an accessible plenum, in accordance with the coordination rules with the electrician.
Handling disagreements and technical rework after assembly
When a made-to-measure wardrobe is delivered, disputes almost always arise from a gap between the client's clothing habits and the internal volumes actually executed. Wide hangers whose sleeves rub against the sliding door dampers, winter coats that lose their fold on an intermediate shelf, or a short hanging rail that squashes the hems of jackets: the joiner is immediately faced with usage complaints. Faced with such disputes, the site foreman must proceed methodically to identify whether the problem stems from a dimensioning error in the workshop or from an unstated need.
The first reflex is to examine the execution drawing countersigned before manufacture. If the drawings stated a usable carcass depth of less than 550 millimetres without the client having measured the practical consequences, the joiner's professional liability is directly engaged under their duty to advise. If, on the other hand, the initial usage sheet and the approval form explicitly mentioned these geometric restrictions in order to work around a passage constraint in the room, the changes then constitute additional work that can be invoiced in accordance with the contractual provisions of the SIA 118 standard and the Code of Obligations (CO).
- Replace a transverse rail with a system of longitudinal pull-out rails when the depth of the carcass prevents the doors from closing over standard hangers.
- Reposition the shelf supports on the standardised 32 millimetre grid to recover the 1100 to 1200 millimetres needed under the short hanging rail.
- Stiffen shelves with a span of more than 900 millimetres that sag under load by fitting an aluminium stiffening profile under the panel or by gluing a solid timber edge strip to the front edge.
Frequently asked questions
What net usable depth should be reserved for hanging suit jackets on hangers?
To hang men's jackets properly without crushing the shoulders against the panels or doors, allow a net usable depth of 550 to 600 millimetres. For sliding doors, add 80 to 100 millimetres to house the tracks and the overlap of the doors, which brings the total size of the unit to 650 or even 700 millimetres. Below 500 millimetres of usable depth, switch to an axial pull-out hanging rail.
How can clothing shelves be prevented from sagging over time?
The deflection of a shelf depends on its span, its thickness and the applied load. With 19 millimetre wood-based panel, limit the clear width to 800 millimetres for piles of jumpers or heavy linen. Beyond that, up to 1000 millimetres, switch to a thickness of 25 millimetres or incorporate a metal stiffener under the shelf. Also fix a batten to the back of the carcass to relieve the side shelf pins.
What hanging height should be provided between two superimposed rails?
To stack two rows of short hanging reserved for shirts and jackets, allow at least 1050 to 1100 millimetres of clear space under each tube. The upper rail is generally placed between 2000 and 2100 millimetres from the finished floor, which leaves about 1000 millimetres at the lower level without the garments touching the bottom of the unit. For users, installing an articulated wardrobe lift compensates for great heights.
How can LED lighting be integrated into the carcasses without overheating the unit?
Interior lighting is installed using LED strips recessed in a groove machined in the underside of a panel or in the front upright. Always use extruded aluminium diffuser profiles, which dissipate the heat of the light strip and avoid heating the wood or the stored clothes. Provide a low-voltage power supply located remotely in a ventilated niche or in the plinth, and control the switching with contactless door-opening sensors.
Texts and standards cited
- norme SIA 118General conditions for the execution of construction work
