🧱 CFC 273Claddings, skirting boards and parquet installationChapter 2 of 10 in the section

Glued or floating: heat transmission, footfall noise and underfloor heating

The choice between glued and floating installation on underfloor heating often pits thermal efficiency against installation cost. This chapter lets you analyse the real thermal resistance of the build-up according to SIA 253, assess the acoustic behaviour with regard to footfall noise and steer the client towards the appropriate technical solution.

Key takeaways

  • Glued installation eliminates the insulating air gap and optimises heat transfer from the screed.
  • The total thermal resistance of the parquet and underlay build-up must not exceed the normative limits.
  • Footfall noise inside the room remains much better damped by a continuous full-surface glued bond.
  • The higher initial cost of gluing is offset by the greater dimensional stability on a heated screed.

Thermal resistance and heat transfer: dispelling the illusion of pure efficiency

On a heated floor, the client almost always worries about the supposed energy loss of a floating installation compared with a full-surface glued one. In interior joinery, the technical assessment is not based on an intuition about heating, but on the calculation of the total thermal resistance of the floor build-up, governed by the requirements of SIA 253. Wood has a moderate thermal conductivity: the thicker the board, the more it slows the diffusion of energy into the room.

In a full-surface glued installation using an elastic silane-polymer adhesive, direct contact between the screed and the underside of the parquet boards eliminates any intermediate air layer. Heat diffuses continuously by solid conduction. The thermal resistance is strictly limited to that of the wood and the adhesive film, which gives optimal thermal responsiveness when the room thermostat setpoint changes.

Conversely, floating installation stacks three layers: the mineral substrate, the mandatory acoustic underlay and the engineered parquet assembled by tongue-and-groove or mechanical click-lock. The micro air gap trapped under the underlay and the insulating material of the underlay itself increase the overall thermal resistance by roughly twenty to forty per cent. This does not mean that heat is lost, but that the screed must reach a higher temperature to deliver the same heat flow into the room, which slows the thermal inertia of the system.

Comparative thermal behaviour by installation method on underfloor heating
Assessment criterionFull-surface glued installationFloating installation with underlay
Bond to the substrateContinuous adhesion without air gapDecoupling by technical underlay
Diffusion inertiaLow inertia, direct heat transferInertia increased by interface resistances
Choice of speciesEngineered parquet and certain stable solid boardsEngineered parquet only
Thickness constraintsWide compatibility up to the thermal limitsStrict check of the combined thickness of wood and underlay

The argument of immediate energy efficiency is often put forward as the decisive factor in favour of gluing. Yet the real operating difference over a heating season remains small in a well-insulated new building. For the initial budget of the joinery package, the supply of specific adhesives and the application time represent an additional cost of around twenty to thirty francs per square metre compared with a floating system, the precise pricing of which must be established on the tender platform.

Acoustics and mechanical fatigue: the real decision criteria on the construction site

The technical choice must not focus solely on the thermometer: the acoustic perception of the users and the mechanical performance of the parquet under thermal cycling are the real differentiating factors. On a screed with underfloor heating, the wood is permanently subjected to variations in humidity and temperature that cause tangential stresses in each board.

Reflected footfall noise
Sound level emitted in the room where the impact occurs, caused by the direct impact of walking on the top surface of the parquet, distinct from the impact noise transmitted to the floors below through the slab.

It is on footfall noise that floating installation reveals its main functional weakness. With no bond to the substrate, the parquet board acts as a resonating membrane. Even when fitted with a high-density resilient underlay, floating installation produces a hollow, clear sound as footsteps pass through the room. Full-surface glued installation, on the other hand, bonds the mass of the wood to that of the concrete or calcium sulphate screed, damping the surface clacking and giving a high-end feel of stability.

As regards dimensional stability, behaviour differs fundamentally under the effect of heating. In floating installation, the deformation field is free: the parquet expands and contracts as one solid block. This freedom requires generous perimeter joints at skirting boards, door openings and fixed fittings. If the surface temperature of the screed rises, the boards may cup if the expansion gap is insufficient.

In glued installation, the elastomer adhesive network absorbs a large share of the shear stresses at the scale of each individual board. The micro dimensional variations are spread over the whole surface of the room instead of accumulating at the perimeter. The joiner thus avoids installing unsightly dividing profiles at door thresholds in large open-plan layouts, while also preventing height differences between boards caused by winter drying.

Compatibility and dimensional requirements according to SIA 253

On a floor equipped with underfloor heating, the choice between full-surface glued and floating installation often rests on the received idea of energy efficiency. In fact, the maximum permissible thermal resistance for the covering and its underlay remains strictly regulated by SIA 253, whatever fixing principle is chosen. It is therefore not a difference in total energy consumed that settles the debate, but the kinetics of heat transfer and the dimensional stability of the wood under cyclic variations in relative humidity and temperature.

To comply with this limit value, the joiner must check the technical data sheet of the components before ordering. In glued installation, the adhesive film has a negligible thermal resistance, which allows engineered or solid wood boards of greater thickness. Conversely, in floating installation, the intrinsic thermal resistance of the underlay mat adds to that of the board and of the residual air layer. If the total exceeds the ceiling value, the heating installation loses its ability to regulate the indoor environment properly in very cold weather.

Heat transmission directly influences the hygrothermal behaviour of the boards. During the heating period, the underside of the parquet undergoes pronounced drying while the top face remains exposed to the room climate. In glued installation, the rigid mechanical bond distributes the transverse stresses into the mass of the screed, reducing the risk of cupping. In floating installation, the tongue-and-groove or click assembly alone absorbs the differential shrinkage, which favours the opening of seasonal joints and squeaking along the edges.

Trade-offs on the construction site: acoustic comfort, durability and overall cost

The direct cost of installation is the second determining parameter. Glued installation requires a suitable polymer or polyurethane adhesive, a notched trowel calibrated to the specified grain size, a longer application time and careful degreasing or dust removal of the substrate. Floating installation appeals through its fast execution and substantial savings on consumables. Yet the comfort perceived by the user depends above all on the management of impact noise and footfall noise, two physical notions too often confused when the order is placed.

Technical comparison between glued and floating installation on heated screed
Evaluation criterionFull-surface glued installationFloating installation with underlay
Total thermal resistanceLow: direct and immediate heat transferMedium to high: intermediate underlay and air layer
Footfall noise inside the room (resonance)Dull and muffled: absorption by the mass of the screedClear and loud: drum-like resonance effect
Impact noise attenuation (neighbour)Depends entirely on the floating screedLocally improved by the resilient underlay
Behaviour under thermal cyclingStresses absorbed by the continuous adhesive filmFree sliding, risk of height differences and gaps
Later replacement or removalComplex and requires planing of the substrateQuick, without damage to the mineral substrate

Footfall noise refers to the noise radiated in the very room where people walk. In floating installation, the cavity created under the boards acts as a resonance box that amplifies the clacking of heels. Inserting a dense acoustic underlay with high compressive strength improves the situation, but at the same time increases the overall thermal barrier. Glued installation bonds the parquet to the inert mass of the building, giving the full, muffled sound characteristic of high-quality finishes.

The final choice must be recorded in the construction site coordination minutes from the tender phase. If the client favours the immediate saving of floating installation, the joiner must state the usual reservations regarding heating inertia and resonance acoustics, so as to align delivery expectations with the physical realities of the chosen system.

Managing defects on underfloor heating: inspection protocol and remedial work

When defects appear after the underfloor heating is commissioned, the joiner faces three typical manifestations: lifting or cupping of the boards, degraded impact noise with a resonance-box effect, and localised debonding. The frequent temptation is to blame immediately the thermal resistance of the build-up or the initial choice between floating and glued installation. In reality, the failures almost always result from perimeter restraint or a residual moisture differential masked by a poorly recorded heating protocol.

  1. Joint thermal and dimensional surveyCheck the surface temperature of the wood facing with a contact thermometer or a calibrated infrared thermometer to make sure it does not exceed the maximum permissible value. Record the humidity of the ambient air and inspect each metal door frame foot, threshold and skirting start in order to identify the points of mechanical restraint that break the decoupling.
  2. Diagnosis of interface cohesionIn glued installation, sound the whole parquet with a mallet to map the hollow areas. Carefully remove a skirting board at the edge to check whether the loss of adhesion occurred at the primer, in the adhesive bed or by surface tearing of the flowing screed.
  3. Examination of the resilient underlayIn floating installation, check the crushing of the insulating layer under the weight of heavy furniture. A resilient mat that is too soft or degraded by local overheating causes excessive flexing of the tongues and grooves, creating constant squeaking and increased transmission of footfall noise.

SIA 253 sets the flatness and bonding requirements for glued floor coverings. If the debonding is confined to less than five per cent of the surface and does not affect the expansion joints of the structural work, targeted repair by shallow chemical anchoring or low-pressure injection remains technically viable. If, on the other hand, the cupping comes from a general absence of perimeter gap, the joiner must make a clean cut along the walls with a plunge saw with integrated dust extraction to restore the required ten to fifteen millimetres of clearance before refitting skirting boards fixed exclusively to the wall.

Frequently asked questions

Can excessive footfall noise be corrected on a floating parquet already laid?

No, no surface treatment can correct poor acoustic insulation against footfall noise once the parquet is clicked together. If the underlay has insufficient load resistance or if the vapour barrier film creates hollow resonances through lack of mass, the only solution is to lift the floor and insert a dense mineral felt or switch to full-surface gluing in accordance with SIA 253.

How should you react if the glued parquet lifts along a dividing joint?

You must immediately check whether the movement joint of the heated screed has been carried through identically into the parquet. Blocking an expansion joint under continuous gluing inevitably causes the wood to tear away during heating cycles. The repair requires sawing the parquet straight above the screed joint and inserting a suitable dividing profile that allows lateral expansion.

Is floating installation tolerated with a reversible underfloor system in cooling mode?

Floating installation is strongly discouraged on a cooling slab. The air gap trapped under the floating elements favours reaching the dew point in summer, which leads to invisible condensation under the underlay. This phenomenon causes rotting of the facing or rapid warping of the joints. Only full-surface gluing guarantees thermal continuity without condensation breaks on a cooling substrate.

What is the procedure if the floor setpoint temperature exceeds the permissible limit?

The joiner must issue a written notice of anomaly to the client and to the site management. Wood species degrade quickly and open at the longitudinal joints when the surface temperature exceeds the permitted range. Regulation of the heating flow temperature is the responsibility of the heating installer, who must recalibrate the mixing valves before any final acceptance of the covering.

Texts and standards cited

  • SIA 253Installation of glued floor coverings, substrate requirements, permissible moisture and execution on heated screeds