Fitted joinery: survey, manufacture and installation: the execution reference
This section details the complete chain of interior fitting work for the CFC 273 joiner in French-speaking Switzerland: from three-dimensional measurement on the raw slab to the final adjustment of the fittings on the construction site. Intended for team leaders, foremen and fitters, it brings together the rules on tolerances, structural anchoring and adaptation to out-of-square masonry, ensuring integration without costly rework in accordance with the ASMAC guidelines and standard SIA 343.
- 10chapters
- 22 000words
- 6sections in the training course
- 60chapters in total
Key values to remember 4
3
Minimum measuring heights for the survey of an opening or a volume
60 days
Legal period within which the property client must report defects after delivery
2 mm
Maximum permissible alignment tolerance between two adjacent fitting fronts
50 kg
Minimum dynamic load capacity required for a wide pan drawer
Technical scope of the joiner and installation interfaces
The installation of interior fittings is the critical meeting point between the structural work, lightweight partitions and the technical trades. The role of the CFC 273 joiner begins with measuring on the raw or partly finished construction site, continues with the sizing of the carcasses in the workshop, and ends with millimetre-precise adjustment on site. Mastering this process requires anticipating deformation of the structure, out-of-plumb walls and differential settlement, without ever improvising during assembly.
Where masonry shows misalignments or out-of-plumb walls exceeding the usual structural-work tolerances, the joiner must exercise the duty to notify without delay. Under art. 365 CO, the contractor immediately notifies the client of any circumstance jeopardising the proper execution of the work. Installing a fitted carcass against a wall outside tolerance without a written reservation makes the company liable for the alignment of the fronts and the opening of the doors.
Logical reading order: from gathering information to the record
To design and install a fitting without problems, the sequence of operations must follow a strict chronology. Each step directly determines the success of the next, from the initial measurement on the raw slab to the signing of the installation report.
- 1. Diagnose the space and the interfaces (P4-01 to P4-04)Everything begins with a rigorous survey of the actual geometry at the least favourable dimensions and a check of the screed levels. The nature of the load-bearing substrates is verified immediately to anticipate suitable anchors, then the recesses for services and appliances are validated before workshop manufacture is launched.
- 2. Adapt the work to real-world constraints (P4-05 to P4-07)As no room is perfectly square, integration relies on the skilful use of scribing fillers, adjustable plinths and discreet shimming. This phase requires choosing runners and hinges able to absorb the actual working load, while organising the internal ergonomics according to the needs expressed by the user.
- 3. Execute, deliver and accept (P4-08 to P4-10)The choice of decorative board determines its resistance to wear and moisture. The fitting must then be divided into sections to pass through stairwells and apartment entrance doors without damage, before being adjusted to the millimetre to eliminate any flushness defect under art. 367 CO during the inspection of the work.
| Project stage | Key action on the construction site | Risk if omitted | Professional reference |
|---|---|---|---|
| Technical survey | Triangulation and check at the three heights | Jammed carcass or visible gap at the surface-mounted unit | ASMAC guidelines |
| Coordination of services | Dimensioned set-out signed by the installers | Physical clash between drawer, waste outlet and sockets | Standard SIA 343 |
| Installation and adjustment | Adjustment of fillers and alignment of gaps | Door rubbing or rejection at acceptance | Art. 367 CO |
By following this progression, installation teams eliminate workshop rework on the construction site, reduce downtime in occupied dwellings and ensure the long-term functionality of even the most complex fittings.
📘 Chapters in this section 10
Measuring accurately: dimensions at three heights, squareness, plumb and the most unfavourable dimension
Secure your workshop cutting lists by identifying out-of-square walls and the narrowest dimension of the room.
Fitted furnishings: survey, fabrication and installationFixing according to the substrate: concrete, brick, dry-lining partition, and the actual in-service load
Select the exact anchor for the substrate to ensure the hold of heavily loaded wall-hung units.
Fitted furnishings: survey, fabrication and installationCutting a worktop: manufacturer's dimensions, protected edge and clearance
Machine sink and hob cut-outs successfully without weakening the board or risking water ingress.
Fitted furnishings: survey, fabrication and installationCoordinate before manufacturing: sockets, trap, supply points and signed layout plan
Have the set-out of the technical supply points signed off to put an end to pipework conflicts at assembly.
Fitted furnishings: survey, fabrication and installationTaking up the room's irregularities: scribing strip, adjusting skirting and the silicone joint that saves the day
Master the cutting of fillers and the fitting of skirtings to absorb out-of-plumb walls.
Fitted furnishings: survey, fabrication and installationHinges and drawer runners: usage class, load, damper and adjustment
Size hardware, dampers and runners according to the actual load to prevent sagging of doors and drawers.
Fitted furnishings: survey, fabrication and installationMade-to-measure walk-in wardrobe: usable heights, hanging rails, and what the client is made to say about their habits
Translate the client's clothing habits into usable wardrobe and shelf dimensions.
Fitted furnishings: survey, fabrication and installationChoosing the material: melamine, laminate, veneer, and resistance to impact and water
Choose between melamine, laminate and veneer according to exposure to impacts, scratches and water.
Fitted furnishings: survey, fabrication and installationGetting the furniture in: surveying the route, on-site assembly and weight per piece
Measure the stairwells and divide the carcasses into sections to bring the furniture up without breakage or injury.
Fitted furnishings: survey, fabrication and installationAccepting a fitted installation: façade alignment, even gaps and reservations
Adjust the front gaps within the permissible tolerances to sign a record without reservations.