Skip to content
Website
🧱 CFC 273Section 4 of 610 chapters

Fitted joinery: survey, manufacture and installation: the execution reference

This section details the complete chain of interior fitting work for the CFC 273 joiner in French-speaking Switzerland: from three-dimensional measurement on the raw slab to the final adjustment of the fittings on the construction site. Intended for team leaders, foremen and fitters, it brings together the rules on tolerances, structural anchoring and adaptation to out-of-square masonry, ensuring integration without costly rework in accordance with the ASMAC guidelines and standard SIA 343.

  • 10chapters
  • 22 000words
  • 6sections in the training course
  • 60chapters in total

Key values to remember 4

ASMAC guidelines

3

Minimum measuring heights for the survey of an opening or a volume

art. 367 CO

60 days

Legal period within which the property client must report defects after delivery

Norme SIA 343

2 mm

Maximum permissible alignment tolerance between two adjacent fitting fronts

ASMAC guidelines

50 kg

Minimum dynamic load capacity required for a wide pan drawer

Technical scope of the joiner and installation interfaces

The installation of interior fittings is the critical meeting point between the structural work, lightweight partitions and the technical trades. The role of the CFC 273 joiner begins with measuring on the raw or partly finished construction site, continues with the sizing of the carcasses in the workshop, and ends with millimetre-precise adjustment on site. Mastering this process requires anticipating deformation of the structure, out-of-plumb walls and differential settlement, without ever improvising during assembly.

Where masonry shows misalignments or out-of-plumb walls exceeding the usual structural-work tolerances, the joiner must exercise the duty to notify without delay. Under art. 365 CO, the contractor immediately notifies the client of any circumstance jeopardising the proper execution of the work. Installing a fitted carcass against a wall outside tolerance without a written reservation makes the company liable for the alignment of the fronts and the opening of the doors.

Logical reading order: from gathering information to the record

To design and install a fitting without problems, the sequence of operations must follow a strict chronology. Each step directly determines the success of the next, from the initial measurement on the raw slab to the signing of the installation report.

  1. 1. Diagnose the space and the interfaces (P4-01 to P4-04)Everything begins with a rigorous survey of the actual geometry at the least favourable dimensions and a check of the screed levels. The nature of the load-bearing substrates is verified immediately to anticipate suitable anchors, then the recesses for services and appliances are validated before workshop manufacture is launched.
  2. 2. Adapt the work to real-world constraints (P4-05 to P4-07)As no room is perfectly square, integration relies on the skilful use of scribing fillers, adjustable plinths and discreet shimming. This phase requires choosing runners and hinges able to absorb the actual working load, while organising the internal ergonomics according to the needs expressed by the user.
  3. 3. Execute, deliver and accept (P4-08 to P4-10)The choice of decorative board determines its resistance to wear and moisture. The fitting must then be divided into sections to pass through stairwells and apartment entrance doors without damage, before being adjusted to the millimetre to eliminate any flushness defect under art. 367 CO during the inspection of the work.
Hand-over matrix between the phases of a successful fitting
Project stageKey action on the construction siteRisk if omittedProfessional reference
Technical surveyTriangulation and check at the three heightsJammed carcass or visible gap at the surface-mounted unitASMAC guidelines
Coordination of servicesDimensioned set-out signed by the installersPhysical clash between drawer, waste outlet and socketsStandard SIA 343
Installation and adjustmentAdjustment of fillers and alignment of gapsDoor rubbing or rejection at acceptanceArt. 367 CO

By following this progression, installation teams eliminate workshop rework on the construction site, reduce downtime in occupied dwellings and ensure the long-term functionality of even the most complex fittings.

📘 Chapters in this section 10

Fitted furnishings: survey, fabrication and installation

Measuring accurately: dimensions at three heights, squareness, plumb and the most unfavourable dimension

Secure your workshop cutting lists by identifying out-of-square walls and the narrowest dimension of the room.

Fitted furnishings: survey, fabrication and installation

Fixing according to the substrate: concrete, brick, dry-lining partition, and the actual in-service load

Select the exact anchor for the substrate to ensure the hold of heavily loaded wall-hung units.

Fitted furnishings: survey, fabrication and installation

Cutting a worktop: manufacturer's dimensions, protected edge and clearance

Machine sink and hob cut-outs successfully without weakening the board or risking water ingress.

Fitted furnishings: survey, fabrication and installation

Coordinate before manufacturing: sockets, trap, supply points and signed layout plan

Have the set-out of the technical supply points signed off to put an end to pipework conflicts at assembly.

Fitted furnishings: survey, fabrication and installation

Taking up the room's irregularities: scribing strip, adjusting skirting and the silicone joint that saves the day

Master the cutting of fillers and the fitting of skirtings to absorb out-of-plumb walls.

Fitted furnishings: survey, fabrication and installation

Hinges and drawer runners: usage class, load, damper and adjustment

Size hardware, dampers and runners according to the actual load to prevent sagging of doors and drawers.

Fitted furnishings: survey, fabrication and installation

Made-to-measure walk-in wardrobe: usable heights, hanging rails, and what the client is made to say about their habits

Translate the client's clothing habits into usable wardrobe and shelf dimensions.

Fitted furnishings: survey, fabrication and installation

Choosing the material: melamine, laminate, veneer, and resistance to impact and water

Choose between melamine, laminate and veneer according to exposure to impacts, scratches and water.

Fitted furnishings: survey, fabrication and installation

Getting the furniture in: surveying the route, on-site assembly and weight per piece

Measure the stairwells and divide the carcasses into sections to bring the furniture up without breakage or injury.

Fitted furnishings: survey, fabrication and installation

Accepting a fitted installation: façade alignment, even gaps and reservations

Adjust the front gaps within the permissible tolerances to sign a record without reservations.