🧱 CFC 273Interior doors: installation, clearances and adjustmentChapter 4 of 10 in the section

Pocket sliding door: frame in the partition, level of the rail and door that rubs

After this chapter, you will be able to set out, adjust and lock a pocket door frame before the plasterboard is fitted. You will master the joint check of level and plumb by two people, the coordination of partition reinforcements with the plasterers and the access openings required to guarantee mechanical access to the rail.

Key takeaways

  • Rigorous levelling of the suspended rail determines whether the leaf stays still in any position.
  • The plumb and squareness check must always be carried out by two people before the facings are screwed on.
  • Coordination with the plasterer guarantees the perimeter reinforcement without constraining the metal casing.
  • A removable access to the rail and carriages allows maintenance without demolishing the finished partitions.

Setting-out check and levelling of the casing before lining the partition

A pocket sliding door tolerates no geometric approximation. When the leaf slides inside a concealed casing, the slightest defect in flatness or lean becomes irreparable as soon as the plasterer has screwed on the plasterboard and applied the reinforcing tape. In accordance with the rules of the trade governed by standard SIA 343, the frame must have a perfectly horizontal rail in order to avoid spontaneous movement of the leaf, whether it is an unintended closing or an automatic return to the back of the pocket.

  1. Transferring the reference level lineUsing a rotating laser level set to the building's general datum (+1.00 m above finished floor), mark the reference line on both the receiving jamb and the back-of-pocket jamb of the frame. Measure the exact distance to the lower edge of the guide rail to confirm the required clear passage height.
  2. Seating shims and fixing to the floorPosition the metal feet of the casing on the rough slab, inserting calibrated rot-proof shims to reach the finished level. Check the longitudinal alignment with a string line or a three-metre straightedge against the adjoining partition before mechanically anchoring the base into the concrete.
  3. Cross-check of plumb and level by two peopleWhile the first fitter holds the two-metre spirit level on the stop jamb and then against the opening jambs of the pocket, the second checks the bubble and adjusts the upper fixings on the load-bearing framework. The diagonal squareness of the complete casing is checked with a tape to eliminate any parallelogram effect.
  4. Rolling test with a dummy leaf or templateTemporarily suspend a profiled straightedge or the door panel from the two moving carriages in the rail. Slide the element over the full travel to confirm the complete absence of lateral drift, tight spots or rubbing against the intermediate crosspieces of the casing.
Frame installation tolerances according to professional rules
Geometric parameterPermissible toleranceConsequence of an uncorrected defect
Horizontal level of the railLess than 1 mm per metreLeaf moves by itself under its own weight.
Plumb of the stop jambDeviation of less than 1.5 mm over the heightGaping at the rebate and visible gap when closed.
Flatness of the pocket sidesDeflection of less than 2 mmSeals or leaf rubbing against the plaster.
Parallelism of rail and finished floorMaximum deviation of 2 mm over the openingBottom guide jamming or brush rubbing.

Framework reinforcements, back-of-pocket clearance and mechanical maintenance access

In lightweight partitions receiving a pocket door, the interface between the joiner of CFC 273 and the plasterboard fitter of CFC 271 requires flawless coordination. The metal casing houses the panel but does not have the structural stiffness needed to withstand alone the slamming or lateral pressure from users. The reinforcement of the partition around the frame must be validated before boarding to guarantee that the clear opening does not deform.

  • Reinforced studs: mandatory installation of reinforced or doubled metal sections on either side of the opening to carry the lintel without transferring load to the casing.
  • Top fixing: rigid connection between the upper crosspiece of the casing and the primary ceiling framework by means of anti-vibration brackets.
  • Screwing check: absolute prohibition on using screws that are too long for the plasterboard facing, otherwise the sheet metal of the casing will be pierced and the leaf permanently scratched.
  • Written notice before closing: systematic issue of an interface inspection sheet sent to the site management before the plasterers start work.

One of the most frequent pitfalls is forgetting the maintenance access to the rail. A sliding mechanism contains wear parts exposed to construction site dust, such as ball bearings, end-of-travel dampers or hydraulic brakes. If the frame or the upper cover strip is nailed and glued without being removable, the slightest technical intervention requires breaking out the surrounding plaster.

Joint check before closing the lining

Once the plasterer's plasterboard is screwed onto the framework, any geometric anomaly on the metal casing becomes permanent. The pocket door frame can no longer be shimmed, straightened or plumbed without destroying the partition. The check before closing therefore requires the joiner and the plasterer to be present on the construction site at the same time. This joint verification confirms that the upper rail is perfectly straight, horizontal and positioned at the exact height relative to the general metric level mark.

The first critical point concerns the rigidity of the perimeter of the casing. The reinforced vertical studs on either side of the pocket must resist bending forces when the plasterboard is fixed by screwing. If a screw passes through the interior space of the pocket or deforms the metal stud of the casing, it will scratch the door leaf at the first movement. The boards must be fixed with screws of suitable length that do not protrude into the clear passage of the leaf.

Inspection protocol before boarding the partition
Check pointAcceptance criterionMeasuring methodRole of the trades
Horizontality of the top railDeviation of less than 1.5 mm over the full travelLaser level and 2 m aluminium straightedgeChecked by joiner, agreed by plasterer
Plumb of the stop jambDeflection of less than 1 mm over the heightPrecision spirit levelAlignment check with the plaster framework
Internal clearance of the pocketConstant width over the full depthCalibrated hardwood gauge rodValidation of framework reinforcement by plasterer
Sliding pathSmooth sliding without tight spotsDry run with a rigid templateJoint signature of the approval to close

The preliminary kinematic test is ideally carried out with a test panel of the finished dimensions of the door element or a template straightedge suspended from the ball-bearing carriages. This manoeuvre reveals any longitudinal bowing of the casing caused by a framework fixing under stress. If the panel rubs or the movement accelerates by itself towards closing, the levelling of the anchor brackets must be corrected before the plasterer is authorised to proceed.

Diagnosing rubbing and maintenance without damaging the work

When rubbing appears after commissioning, the diagnosis requires identifying the zone of mechanical contact: bottom heel against the screed, top of the leaf against the lintel, or sides of the panel against the seals at the back of the pocket. Lateral rubbing on the return stroke most often indicates a misalignment of the floor-fixed guide or hygrometric swelling of the solid timber leaf. The joiner first works on the adjustable suspension brackets via the opening left free under the rail.

  • Checking the cleanliness of the lower guide groove: removal of plaster dust and sanding residue that has fallen to the floor.
  • Checking the plumb of the guide fixed at the foot of the casing: an offset of 2 mm is enough to twist the panel at the end of travel.
  • Attitude adjustment on the bracket screws of the carriages: balancing the heights to align the leading edge against the stop jamb.
  • Adjusting the damped end stops: limiting the travel to prevent the flush pull handle from striking the opening trim.

The design of the timber trim by the joiner must preserve full access to the mechanism. The cover strips of the upper frame and the damping profiles for the return stroke must be fitted so that they can be removed, using felt-lined tongues, metal clips or screws concealed under flush-trimmed plugs. This arrangement makes it possible to unhook the leaf, extract the carriages for lubrication or replacement, and reach the extruded aluminium rail without damaging the paintwork or the partition finishes.

If the casing shows residual deformation due to the drying of the plaster and the panel rubs against the inner wall, the joiner can only plane the door within the limits of its solid timber lining reveals. Excessive planing damages the facing or weakens the internal mechanical connections of the panel. Scrupulous compliance with the initial joint check remains the only guarantee of avoiding a heavy and contentious dismantling of the finished partition.

Disputes, rubbing after closing and remedial measures

Once the dry-lined partition is plastered and painted, any geometric anomaly on a pocket door casing becomes a major defect. If the door rubs at the back of the pocket or if the leaf will not stay in the open position and drifts under gravity, the initial diagnosis must be made without destructive dismantling. The joiner uses an endoscopic inspection camera slid into the top gap to check the suspension rail, the condition of the carriages and the alignment of the internal studs of the casing.

If the rail was installed with an unintended slope or if the framework twisted when the plasterboard was fixed, the possibilities for mechanical adjustment remain limited. The clearance at the bottom of the groove and the travel of the suspension screws on the brackets make it possible to recover two to three millimetres of out-of-level, no more. Beyond that, the carriage reaches the end of its thread and the leaf strikes at an angle against the strike jamb.

Decision tree in case of a confirmed defect after closing
Visual and mechanical findingProbable technical causeCorrective measure
Spontaneous drift of the leafRail not horizontal (level defect)Fine adjustment via the access opening or rail shimming
Rubbing on the inner facingsCasing pinched by screws that are too long or missing reinforcementTargeted removal of the board on the pocket side to straighten the studs
Leaf rubbing on the finished floorScreed settlement or bottom guide off axisReadjusting the height under the carriage or realigning the bottom guide

When the frame shows excessive deflection due to the absence of reinforced studs in the adjacent metal framework, the only lasting solution is to open the plasterboard facing on one side of the casing. This repair is carried out after written notification to the site management, requiring a joint record between the joiner and the plasterer to decide who bears the cost of the plastering and painting touch-ups.

Frequently asked questions

How can a carriage jammed at the back of the casing be freed without opening the partition?

The tubular rail must include a removable section or an access shoe opening under the lintel of the door frame. By unscrewing the front end stop and the leaf connection plate, the joiner slides the whole running gear towards the passage opening. If a foreign object or a board screw blocks the rail in the blind section, extraction requires a magnetic rod or a flat hook guided by an endoscopic camera.

What level tolerance applies to the pocket door rail according to standard SIA 343?

Standard SIA 343 prescribes strict plumb and flatness tolerances for interior joinery. For a sliding door rail, the horizontal deviation must not exceed one millimetre per metre, with an absolute maximum of two millimetres over the entire travel. Any greater deviation causes an uncontrolled gravity-driven movement of the leaf or imperfect closing against the timber closing jamb.

Why must the joint check of the frame be carried out before boarding?

Once the plasterboard facings are screwed on and jointed, the metal structure of the casing is completely enclosed. Any squareness defect, twisting of the pocket studs or forgotten framework reinforcement requires destructive demolition of the linings. The joint check by two people, involving the joiner and the plasterboard fitter, formally validates the level of the rail, the clearance at the back of the pocket and the freedom of movement of the template before closing.

How can the dry-lined partition around the frame be stabilised to avoid pinching?

The plasterboard fitter must double the vertical framework studs on either side of the opening and secure the casing with specific reinforced sections at least two millimetres thick. A rigid horizontal tie above the lintel prevents deformation under load. The joiner makes sure that the board fixing screws never penetrate the inner groove reserved for the passage of the leaf.

Texts and standards cited

  • SIA 343Doors: technical requirements, plumb and flatness tolerances and functional clearances for interior doors