🧱 CFC 212Facade scaffolding: components, erection and dismantlingChapter 1 of 10 in the section

Scaffolding foundation: soil type, sole plates and load distribution

This chapter details practical methods for securing the foundation of façade scaffolding. You will learn how to visually identify unstable ground, pack standards correctly using distributing timber planks, and arrange for the verification of a basement slab before placing a single screw jack onto it.

Key takeaways

  • Uncompacted backfill causes differential settlement of the standards as soon as the first bad weather arrives.
  • A timber sole plate of minimum thickness distributes the point load across the supporting ground.
  • The screw jack must always be adjusted centered on its packing block without ever exceeding the permissible extension.
  • Any point load on an existing slab requires formal approval from the civil engineer responsible for the structure.

Recognising unstable soil and laying sole plates

The collapse of scaffolding almost always begins at the base of the standards. A structure that is perfectly braced and tied cannot compensate for a failure of its foundation. On a building construction site, natural ground is rarely uniform along the façade: excavation trenches backfilled in haste, plant tracks disrupted by frost, presence of loose topsoil, or runoff from temporary roofs. Before erecting the first bay, the scaffolder checks the consistency of the receiving surface visually and mechanically.

Access structures and working scaffolding must transfer all permanent, operational and environmental loads to the ground or supporting structure without detrimental deformation.

SN EN 12811
  • Recently backfilled ground: loose earth, absence of measurable compaction, extreme sensitivity to water.
  • Clayey or silty soils: total loss of load-bearing capacity after a spell of rain, creep under sustained load.
  • Slope edges and excavated drops: risk of lateral sliding under the oblique thrust from the façade base standards.
  • Misleading superficial surfacings: thin asphalt or block paving laid on a sand bed concealing an underlying void.

According to art. 365 CO, if the ground designated by the client is recognised as defective, the contractor must inform the client immediately. In the scaffolder's practice, muddy, waterlogged or unstabilised ground requires written notification to site management to demand appropriate preparation, such as stripping followed by the laying of a compacted gravel layer.

Sole plate
A solid timber element or rigid pad placed between the base plate of the jack and the ground, intended to reduce the unit pressure transferred to the load-bearing capacity of the supporting ground.

The metal base plate of a jack has too small a surface area to transfer the load rundown onto loose ground by itself. Packing beneath jacks must not be improvised using formwork offcuts or hollow bricks. The rule requires the use of fir planks at least 45 to 50 millimetres thick and at least 20 centimetres wide. The plank must be laid level on ground that has been prepared beforehand, without any overhang or void beneath the timber. In areas with very low load-bearing capacity, continuous timber planks linking at least two consecutive standards are used, or even crossed timber decking to widen the contact surface.

Transferring the point load onto an existing slab and basement floor

Founding on a reinforced concrete structure, such as a foundation raft, a waterproofed terrace or an underground car park ceiling, eliminates the risks associated with the settlement of natural ground. Conversely, it raises a sharp structural issue: the capacity of the slab to carry a concentrated point load beneath each standard of the scaffolding. The original concrete thickness and its reinforcement were not always calculated to withstand closely spaced vertical loads during the temporary phase.

Art. 17 OTConst requires that measures be taken at workstations and passageways so that workers are not endangered by the collapse of building components. As soon as service scaffolding reaches a significant height, with rain-protection tarpaulins or debris nets generating an additional vertical load under wind action, the scaffolder must obtain the green light from the civil engineer prior to any erection on a basement slab.

  1. Request for permissible loadsThe site foreman submits the load rundown per standard, derived from the scaffolding manufacturer's calculation notes, to site management.
  2. Verification by the civil engineerThe civil engineering practice verifies the punching shear resistance and flexural capacity of the existing slab directly beneath the intended standards.
  3. Back-propping beneath the slabIf the slab proves to be undersized, shoring towers or heavy-duty props are installed in the basement below to transfer the load to the foundation raft.
  4. Waterproofing protection and load spreadingOn a flat roof, the base plates rest on a protective rubber membrane and then on a thick timber plank to prevent punching through the insulation system.
Support behaviour according to the nature of the foundation substrate
Nature of substrateBehaviour beneath standardRequired foundation measureMandatory check
Stripped topsoilRapid differential settlementContinuous timber plank or concrete padLevel check after each rainfall
Compacted imported gravelGood, stabilised load-bearing capacityTimber plank beneath each base plateVerification of horizontality
Concrete slab over crawl spaceRisk of local punching shearTimber load spreading + engineer approvalPotential lower-level propping
Waterproofing on insulationCrushing of thermal insulationResilient mat + level timber plankIntegrity of waterproofing

Requirements of standard SN EN 12811 for load transfer to supports

The overall stability of standing scaffolding depends on the full transfer of vertical and horizontal forces down to the supporting ground. According to standard SN EN 12811, each standard transfers a point load resulting from the combination of the dead weight of the steel structure, the decks, guard rails, any nets or sheeting, as well as operational loads and wind actions. When the load-bearing capacity of the supporting ground is uneven or insufficient, the slightest differential settlement results in tilting of the frames, distortion of the diagonals, and failure of façade anchors.

Scaffolding structures must be designed and erected such that applied loads are transmitted to the ground or supporting structure without causing detrimental settlements or excessive displacements incompatible with the stability of the works.

SN EN 12811
Mechanical behaviour of common foundation soils on Swiss construction sites
Type of groundBehaviour beneath standardConstructive foundation measure
Recent uncompacted backfillImmediate point settlement as early as the second levelStripping down to sound ground or continuous heavy-section ground beams
Dense natural sandy-gravelly groundExcellent load-bearing capacity without notable settlementTimber sole plate beneath simple adjustable base plate
Wet clayey or silty soilProgressive creep under load and softening in contact with waterCrossed double timber planks and strict management of roof runoff
Bituminous asphalt or pavementPunching under high heat in summerWide sole plate to prevent local sinking

The scaffolder systematically checks that the adjustment screw of the base plate does not exceed the maximum threaded extension defined by the system manufacturer. Excessive unwinding significantly reduces the buckling load capacity of the standard and creates a detrimental lever arm at the base of the structure.

Execution of packing and working on car park roofs or existing slabs

  1. Preparation of the footprintLevel the ground with a shovel without creating hollows. Clear poor-quality materials and mechanically compact the bearing platform if the ground was disturbed during recent earthworks.
  2. Arrangement of sole platesLay the planks perpendicular or parallel to the façade depending on the slope profile. Continuous planks linking two successive standards considerably reduce the risk of differential settlement along the bay.
  3. Positioning adjustable base jacksCentre the metal base plate perfectly on the timber sole plate. Nail the base plate through the pre-drilled holes to prevent any slipping due to construction site vibrations or horizontal wind thrust.
  4. Management of surface waterDig a drainage trench upstream of the foundation to divert rainwater runoff away from the packing planks, thereby preventing any waterlogging of the supporting ground during use of the installation.

When scaffolding must be supported on a basement slab, an underground garage roof or an existing composite floor, the point load on the existing slab cannot be applied blindly. Car park roof slabs are frequently sized for uniformly distributed imposed loads and comprise a bituminous waterproofing layer topped with compressible thermal insulation. If the base rests directly on such an assembly, the point load crushes the insulation and punctures the membrane.

In this situation, the scaffolder must demand written authorisation from site management, signed by the civil engineer responsible for the structure, before starting erection. If the load-bearing capacity of the slab is insufficient to carry the standards at the base of the scaffolding, the solution requires the installation of steel spreader beams spanning the critical zones, or the placement of back-props inside the basement, aligned directly beneath the standards down to the lower foundation raft.

Procedure to follow in the event of foundation settlement or scouring

On site, differential settlement or scouring beneath a sole plate compromises the overall static equilibrium of the temporary structure. As soon as a void appears beneath a timber plank or a base jack shows visible deviation, the team halts erection work and closes access to the working decks to avoid endangering users.

  1. Cordoning off and closing access pointsLock access to the affected bays, secure trapdoors shut, and prohibit passage of the trades directly beneath the destabilised zone.
  2. Formal notification to the clientAccording to art. 365 CO, if the ground designated by the client is recognised as defective, the contractor must inform the client immediately. The scaffolder formalises this finding in writing, accompanied by photographs and plumb-line surveys.
  3. Mechanical relief using auxiliary jackingErect a shoring tower or relief props bearing on a sound, compacted area to carry the loads before working on the defective support.
  4. Reinstatement of the bearing platformClear the waterlogged or de-compacted zone, rebuild a compacted bed of all-in aggregate, enlarge the distribution area with new timber planks, and re-align the threaded spindle of the adjustable base.

When the foundation bears on a basement slab or underground car park roof, any visible punching or cracking of the concrete requires immediate action by site management and the civil engineering practice. The point load transferred by each standard must match the permissible surcharge drawings of the structural work. If the slab exhibits abnormal deflection, the scaffolder must demand the slab propping design before any continuation of work, in accordance with the recognised rules of the trade enforceable under art. 229 CP in the event of endangerment of life or limb.

Frequently asked questions

Can a steep slope be compensated for by stacking offcuts of timber planks?

No. Stacking short wedges or timber offcuts creates a major risk of slippage under dynamic loads or vibrations. Level compensation is achieved exclusively by adjusting the screw jacks within their permitted working travel, or by cutting stable steps into the supporting ground before laying a continuous ground plank to serve as a uniform sole plate.

What should be done if an excavation below a scaffolding base starts to cave in?

The affected bays must be evacuated immediately and the lower passageways closed off. The minimum clearance distance from the crest of the slope is no longer respected, which creates a risk of collapse through loss of passive earth pressure. The contractor must immediately inform site management so that the excavation face can be stabilised by the earthworks contractor before reinstating the foundation of the threatened standard.

Who approves the installation of props beneath a basement slab supporting scaffolding?

Approval formally rests with the civil engineer responsible for the building's structure. The scaffolder provides them with the exact load rundown per standard leg based on the load class of the structure. The engineer then sizes the required shoring on the underside of the car park or cellar slab to transfer these point loads down to the lower foundation raft without damage.

Can a cracked sole plate be left in place if it is still carrying load?

No. A plank split along the grain or crushed beneath a base plate has lost its flexural rigidity. It no longer distributes the point load correctly over the full contact area of the ground. Temporary jacking must be installed to relieve the standard, the deteriorated plank must be removed, and it must be replaced with a sound piece of timber of appropriate structural grade.

Texts and standards cited

  • CO art. 365materials and ground: if the ground designated by the client is recognised as defective, the contractor shall immediately inform the client thereof, under penalty of bearing the consequences (para. 3)
  • CP art. 229breach of the recognised rules of the art of building: intentional or negligent endangerment of the life or physical integrity of persons