🧱 CFC 212Erector safety and co-activity on the construction siteChapter 9 of 10 in the section

Rescue after an arrested fall: the danger of inert suspension and the rescue plan

After an arrested fall on facade scaffolding, the worker held in their harness faces a rapid, life-threatening risk: inert suspension trauma. You will learn to organise evacuation in a few minutes, select and position release equipment on the structure, and formalise the written rescue plan required before working at height.

Key takeaways

  • Restraint by harness arrests the fall but triggers a medical emergency through venous compression.
  • Inert suspension for ten to twenty minutes can cause irreversible or fatal injuries.
  • The safety and health protection plan sets out the rescue arrangements in written form.
  • The downward evacuation device must be immediately available at the base of the scaffolding.

Understanding the medical emergency of inert suspension and its critical timeframes

During the erection or dismantling of facade scaffolding, arresting a fall using fall arrest personal protective equipment does not end the danger. The scaffolder ends up suspended in mid-air, held by the leg loops and shoulder straps of their harness. This static position triggers what occupational medicine calls orthostatic shock or suspension trauma. Deprived of the muscular pump of the lower limbs, venous blood pools massively in the legs under the effect of gravity, while the straps compress the femoral veins. Blood return to the heart drops drastically within minutes.

Inert suspension trauma
Acute circulatory distress caused by prolonged immobility in a harness, leading to blood pooling in the lower limbs, cerebral hypoxia and subsequent cardiorespiratory arrest.

If the scaffolder is conscious, they can delay the onset of symptoms by using suspension relief straps or by bracing against the tubular uprights of the scaffolding frame. However, if the fall involved head trauma or loss of consciousness against a tube or transom, the situation becomes critical with startling speed. The first signs of impaired consciousness frequently appear between five and ten minutes. Beyond fifteen to twenty minutes of inert suspension, the outcome can be fatal or leave irreversible neurological and renal damage.

Clinical progression and intervention windows for the suspended worker
Suspension timeWorker statusPhysiological consequencesAction required on the structure
0 to 5 minutesConscious and alertPain at femoral pressure points, numbnessDeploy suspension relief strap, prepare rescue
5 to 10 minutesAgitated or drowsyDrop in blood pressure, nausea, dizziness, hypoperfusionImmediately deploy mechanical evacuation kit
10 to 20 minutesUnconscious, inertLoss of consciousness, onset of cerebral anoxiaExtreme emergency release, call emergency services
> 20 minutesDeep comaRisk of cardiac arrest, decompression shock on unhookingEvacuate, keep upper body upright, resuscitation

Organising the written rescue plan and team release equipment

Before starting work, the employer ensures that there is a plan detailing the necessary measures for the work carried out on the construction site, including the organisation of first aid; this plan is drawn up in written form or in a form allowing it to be evidenced by text.

art. 4 OTConst

Given the response times of public emergency services, which almost always exceed a quarter of an hour in urban areas as well as on remote construction sites in French-speaking Switzerland, the erection team must be able to evacuate their own colleague independently. This principle implies that a scaffolder never works alone with a fall arrest harness. The buddy on the ground or on the lower level must possess the skills and equipment to initiate rescue without waiting for external emergency services.

  • A downward evacuation kit stored within immediate reach, including a descent line longer than the total height of the highest scaffolding working platform.
  • A descender with an integrated lifting function, allowing the injured worker to be raised slightly to unhook their fall arrest lanyard from the metal structure.
  • A telescopic rescue pole enabling the evacuation system carabiner to be clipped directly to the dorsal or sternal ring of the suspended scaffolder, without exposing the rescuer to the void.
  • A pair of suspension relief straps integrated into each individual harness, deployable by the feet to relieve groin pressure while waiting consciously.
  1. Prior assessment of rescue anchor pointsThe written plan must specify a structural anchor point capable of supporting the combined loads of the rescue device and the suspended load, separate from the initial lanyard.
  2. Remote attachment of the release systemFrom a safe working platform, the second scaffolder uses the pole to clip the cable or rope of the mechanical advantage system to the victim's harness without stepping over the guardrail.
  3. Lifting and disengagement of the fall arresterThe lifting mechanism is operated to relieve tension on the restraint lanyard, enabling its easy release from the scaffolding.
  4. Controlled descent to the groundThe centrifugal brake or descender ensures descent at a controlled speed down to the ground or onto an intermediate platform for medical handover.

Rescue execution: release sequence and team actions

Holding a scaffolder in their fall arrest personal protective equipment after an arrested fall does not eliminate the vital emergency. The moment kinetic energy is absorbed, the sub-pelvic strap and leg loops compress the femoral veins against the pubic rami. If the scaffolder is unconscious or unable to move their legs, venous blood pools in the lower limbs without returning to the thoracic cavity. The team present on the platform must act with a disciplined mechanical procedure to release the victim before irreversible heart failure occurs.

  1. Alert and visual assessmentImmediately designate a scaffolder to dial 144 and communicate the precise coordinates of the structure. Meanwhile, the foreman climbs to the nearest upper level to establish verbal contact with the suspended worker and assess their state of consciousness.
  2. Securing the evacuation system anchorConnect the mechanical advantage rescue device to a verified structural anchor point located above the worker's line. Extend the telescopic pole equipped with the automatic connector to hook the sternal or dorsal attachment ring of the loaded harness.
  3. Mechanical offloading and safety cutOperate the winch or lifting pulley to hoist the victim a few centimetres. This slight lift removes tension from their own lanyard or retractable fall arrester. Then disconnect their original attachment, or cut their work positioning lanyard using the safety rescue knife if the fall arrest carabiner remains jammed under load.
  4. Controlled descent to the ground or deckEngage the centrifugal brake descender to lower the scaffolder smoothly to the cleared ground or onto an intermediate scaffolding platform previously cleared of all tools. Two workers receive the body to cushion final contact.

Operational validation of the evacuation plan before work starts

Rescue organisation leaves no room for improvisation at the foot of a facade. In accordance with art. 4 OTConst, before starting work, the employer ensures that there is a plan detailing the necessary measures for the work carried out on the construction site, including the organisation of first aid; this plan is drawn up in written form or in a form allowing it to be evidenced by text. The equipment specified on paper must be available in the scaffolder's van, checked before the first ratchet click and deployable by two workers without outside assistance.

Team roles matrix during an emergency evacuation procedure
RoleImmediate actionRequired equipmentExecution timeframe
First witnessRaises the alarm with the foreman, attempts to encourage the conscious victim to pedal on their suspension relief straps.Under-foot relief strap or personal emergency stirrup.Under 60 seconds
ForemanSupervises anchoring of the release device, operates the lifting system and controls the descent.Pre-assembled rescue kit, telescopic pole, semi-static rope.Under 6 minutes
Second scaffolderCalls the 144 dispatch centre, guides ground rescue services and secures the landing area beneath the structure.Site radio, smartphone, barrier tape.Simultaneous (minutes 1 to 5)
Ground receiverReceives the body without laying it flat, positions the worker in a semi-seated posture, monitors breathing.First aid kit, thermal blanket.Upon landing (< 10 min)

On complex construction sites featuring overhangs, inner courtyards inaccessible to road vehicles or high-rise industrial scaffolding, direct vertical evacuation by gravity to the ground is sometimes impossible. The rescue plan of the scaffolding contractor therefore incorporates alternative routes: lateral transfer to a bay protected by a guardrail or assisted platform-by-platform descent to a crane access point. The scaffolder trains regularly in these operations on practice structures so that releasing a colleague becomes an instinctive, controlled response.

Action to take if the planned rescue fails

On a scaffolding erection site, a rescue operation can encounter complications: a jammed rescue winch, an unconscious victim unreachable from the top platform level, or deformation of an upright under impact. Once the critical inert suspension window has begun, confusion heightens the threat to life.

  1. Emergency support from the structureIf the scaffolder is conscious but out of reach of the rescue kit, a team member moves to the immediately superior or adjacent secured frame to throw down a lanyard or closed sling, allowing them to create an improvised stirrup to relieve their thighs.
  2. Ground guidance and preparationA designated worker stands at the entrance of the construction site to guide the fire service aerial platform or rescue vehicle, while clearing ground bays to allow positioning without unnecessary manoeuvring.
  3. Medical positioning after unhookingOnce the victim is brought down, never lay them abruptly flat on their back if suspension has lasted several minutes. To prevent the massive rush of toxic blood to the heart, keep the scaffolder seated or squatting for the first few minutes while awaiting advanced medical care.

Before starting work, the employer ensures that there is a plan detailing the necessary measures for the work carried out on the construction site, including the organisation of first aid; this plan is drawn up in written form or in a form allowing it to be evidenced by text.

art. 4 OTConst

If the internal setup proves ineffective, individual responsibilities in the emergency must strictly adhere to this document drafted prior to erection. Every operative knows the assembly point, emergency contact channel and specific medical guidelines for suspension trauma.

Frequently asked questions

Why is an immediate supine position dangerous following prolonged suspension?

When a scaffolder remains suspended motionless, venous blood pools heavily in the lower limbs compressed by the harness straps. Returning abruptly to a horizontal position causes a sudden fluid overload to the right ventricle, while flushing oxygen-depleted blood loaded with muscle toxins back into vital organs. A seated position with the upper body upright allows gradual adaptation of the systemic circulation.

Who is authorised to use emergency release equipment on the scaffolding?

Only scaffolders who have undergone practical instruction specific to the equipment available on site may operate the rescue kit. The employer must ensure the team has mastered high-level anchoring, mechanical advantage rigging if required, and handling the emergency descender. In the event of a blockage or an unqualified operator, direct intervention is suspended in favour of immediately alerting specialist emergency services.

What mandatory details must appear in the written rescue plan?

The document prepared prior to site setup specifies contact details for pre-notified emergency services, the alarm channel, the exact location of the release kit on the structure and the identity of the designated rescuer within the erection team. It also records admissible structural anchor points for securing the rescue device and outlines the descent path down to ground level or an accessible scaffolding platform.

How can blood circulation be maintained in a suspended scaffolder who remains conscious?

The suspended worker must activate their leg muscles by performing continuous pedalling movements in the air. If the harness is equipped with them, they immediately deploy their emergency suspension relief straps, place their feet on them and stand upright. Failing that, a colleague can lower an anchored sling to create a temporary support loop.

Texts and standards cited

  • OTConst art. 4safety and health protection plan: before starting work, the employer ensures that there is a plan detailing the necessary measures for the work carried out on the construction site, including the organisation of first aid; this plan is drawn up in written form or in a form allowing it to be evidenced by text.