Skip to content
Website
🧱 CFC 212Decking, access and collective protectionChapter 10 of 10 in the section

Slippery decking: snow, ice and rubble on platform decks

Slips on decking represent the majority of same-level falls during winter periods or on dust-generating construction sites. This chapter details response procedures prior to any workstation access, the selection of non-corrosive de-icing agents for metal or timber platform decks, and the organisation of daily end-of-shift sweeping.

Key takeaways

  • Complete snow clearing from decking is mandatory before any work begins on the scaffolding.
  • The use of road salt is prohibited to prevent rapid corrosion of structures.
  • Neutral de-icing granules protect aluminium, galvanised steel, and timber platform decks.
  • Systematic sweeping of rubble at the end of the shift prevents the accumulation of unstable rolling hazards.

Snow-clearing procedures and selection of compatible de-icing products

Falls on the same level on congested or icy decking constitute the most frequent accident on temporary structures. As soon as frost or snowfall occurs, scaffolding safety depends directly on the prior maintenance of its walking surface. The employer and construction site management are required to take the necessary measures to protect workers against inclement weather and slip hazards, in accordance with art. 37 OTConst and Suva directives. Before authorising fit-out trades to access the structure, the scaffolder or safety officer must carry out a visual inspection and clean the surfaces.

The choice of tools and de-icing products meets strict criteria so as not to damage scaffolding components. The use of sharp metal tools such as pickaxes or steel shovels is prohibited on plywood or aluminium platform decks, under penalty of damaging the non-slip coating or gouging structural profiles. The use of rubber squeegees or rigid plastic shovels is required.

Compatibility of de-icing agents according to platform deck material
Type of de-icing agentAluminium / steel platform deckTimber / plywood platform deckTechnical observations
Sodium chloride (standard salt)ProhibitedNot recommendedCauses corrosion of galvanised steel and oxidation of aluminium.
Magnesium / calcium chlorideTolerated with rinsingAcceptableEffective at very low temperatures; requires subsequent rinsing.
Ecological absorbent granules / ureaRecommendedRecommendedNeutral mechanical or chemical action without aggressiveness towards metals.
Fine sand or grit (1-3 mm)RecommendedRecommendedProvides immediate grip; requires sweeping before dismantling.

Salting with traditional sodium chloride constitutes a classic mistake on construction sites. Salt attacks the hot-dip galvanised coating of tubes and guardrails, generating premature pitting rust and degrading the phenolic resins of marine plywood platform decks. Priority should be given to chemical de-icers based on calcium magnesium acetate or spreading dried wood pellets and dry-spread sand to guarantee immediate grip without degrading equipment.

Management of rubble, end-of-shift cleaning and sealing of access trapdoors

The accumulation of concrete spalls, hardened render, tile offcuts, or grinding dust turns decking into a permanent instability zone. Pieces of rubble act like ball bearings under safety footwear soles. To comply with the prevention requirements set out in art. 82 LAA, cleaning platform decks must not be regarded as a secondary task, but as a maintenance operation integrated into the daily routine of the construction site.

  1. Continuous clearing of work areasPick up blocks of deconstruction or masonry elements thicker than 20 mm as work progresses to keep circulation clearances unobstructed.
  2. Methodical sweeping at the end of the shiftSweep fine dust and small rubble at the end of each working day. Use stiff brooms and collect waste in disposal bins.
  3. Safe removal via the chute towerDispose of rubble exclusively through enclosed rubbish chutes or via crane-liftable/heli-transportable engineering skips. Throwing materials freely from scaffolding is strictly prohibited.
  4. Locking and checking trapdoorsClose all access trapdoors to integrated ladders after cleaning. A trapdoor left open poses a fatal fall from height risk.

In the event of severe weather or massive particle deposits on grit-blasting and render-stripping construction sites, the use of industrial construction site vacuums is recommended before rain turns dust into slippery mud. The walkable surface of platform decks must maintain its minimum coefficient of friction at all times. Responsibility for maintaining clean decking is shared between the scaffolding contractor delivering a compliant structure and the users occupying the workstations daily.

Managing slip hazards on decking: SUVA directives and prior snow clearing

A same-level fall on cluttered or frozen scaffolding decking constitutes the most frequent accident on construction sites during winter periods. A platform deck covered with a thin layer of ice, a film of fresh snow, or demolition rubble instantly loses its non-slip properties. According to SUVA directives, access to working levels is strictly conditional upon the serviceability of traffic routes and platform decks. The employer and the scaffolding contractor must ensure that each passage area provides sufficient grip before fit-out trades commence their work.

Snow clearing from scaffolding cannot be improvised while moving about. It must be performed using a top-down methodology, from the upper bay down to the base, in order to avoid point overloading of the lower decks. Foremen ensure that scaffolders or personnel responsible for clearing use suitable tools made of wood or rigid polymer. Hardened steel metal scrapers and shovels are prohibited on aluminium or coated marine plywood platform decks, as they create gouges that retain water and accelerate rot or delamination of components.

  1. Visual inspection and access prohibitionMorning inspection of all decking, access ladders, and stairways by the foreman. Installation of temporary prohibition signage at access points if ice or snow is detected.
  2. Cordoning off the drop zone on the groundSecuring the perimeter at the base of the scaffolding with barrier tape and warning signs before any mechanical or manual disposal of snow from the platform decks.
  3. Methodical clearing from top to bottomRemoval of snow using stiff brooms and synthetic shovels. Snow is thrown outwards into the cordoned-off ground area, never accumulated on hop-up brackets.
  4. Anti-slip treatment and morning acceptance inspectionApplication of a compatible de-icing product or grit aggregate on walkable areas. Validation of access reopening by the person in charge of the construction site.

Compatible de-icing products and end-of-shift cleaning

The choice of de-icing product directly impacts the longevity of scaffolding structures. Massive spreading of standard road salt (sodium chloride) causes severe galvanic corrosion on aluminium platform decks, degrades galvanised steel hook-on mechanisms, and attacks access trapdoor connectors. In accordance with art. 82 LAA, which requires employing prevention measures adapted to technical and environmental conditions, the use of aggressive chemical de-icers must be prohibited in favour of compatible solutions or mineral grit.

Comparison of de-icing agents and abrasives on scaffolding decking
Anti-slip agentAluminium/steel compatibilityThermal effectivenessImpact on componentsUsage recommendation
Sodium chloride (salt)PoorDown to -7 °CRapid steel corrosion and aluminium oxidationProhibited on metal decking
Potassium formateExcellentDown to -15 °CNeutral on metals and plywood, biodegradableRecommended as liquid spray
Magnesium chlorideModerateDown to -15 °CSticky residues, risk of corrosion initiationLimited use with subsequent rinsing
Sand and grit (1-3 mm)TotalIndependent (mechanical action)No chemical risk, risk of fouling trapdoorsRecommended, daily sweeping required

The accumulation of rubble, mortar offcuts, and grinding dust on platform decks constitutes the second major factor in same-level falls. By mixing with rainwater or melting snow, this waste forms an extremely slippery paste that also obstructs water drainage grooves and access trapdoor locking mechanisms. A rigorous end-of-shift cleaning protocol is mandatory to maintain the safety level required by Swiss regulations.

Management of critical situations, work stoppage, and responsibilities on the construction site

When winter sets in or masonry work generates large amounts of rubble, the risk of falling on the same level on slippery decking increases considerably. Falling directly on the scaffolding platform deck is the most frequent accident. If the accumulated layer of snow cannot be cleared before access or if ice persists despite the application of a compatible de-icing product, continuing activities on the structure endangers the bodily integrity of users.

In legal and organisational terms, the planning of winter measures must integrate SUVA directives regarding the maintenance of temporary structures. The employer ensures that personnel have suitable means to clear accesses before any work at height. According to art. 82 LAA, the employer takes all necessary measures to prevent occupational accidents, while workers assist the employer by applying safety instructions and using the required equipment.

At the end of the shift, cleaning walkways and access trapdoors is mandatory to prevent overnight freezing of mortar droppings or wet snow. In the event of a serious failure to comply with safety rules during assembly or keeping a structure in service that has become hazardous, the criminal liability of the site manager may be incurred. Art. 229 CP provides for a custodial sentence or a monetary penalty for anyone who contravenes the recognised rules of building and construction and knowingly endangers the life or bodily integrity of people.

Frequently asked questions

Who must carry out snow clearing from scaffolding in the morning before work starts?

Snow clearing from decking and accesses must be planned and completed before fit-out trades enter. According to SUVA directives and construction site organisation, this task falls to the company responsible for scaffolding maintenance or the users designated in the safety plan. No worker may step onto a snow-covered or icy platform deck before complete clearing and checking.

Which product should be used to de-ice a scaffolding platform deck without damaging it?

Road salt that is aggressive towards metals must be avoided. Prefer de-icers based on calcium magnesium acetate or urea, which do not attack aluminium decking or the galvanisation of steel components. Spreading fine sand or lightweight mineral granules also constitutes an effective alternative to immediately restore grip to traffic routes without damaging platform decks.

How should rubble accumulation on working decks be managed at the end of the shift?

Cleaning decking at the end of the shift is a strict obligation. Rubble, mortar residues, and masonry debris must be swept daily and evacuated via sealed rubbish chutes. Leaving debris on platform decks promotes water retention, obscures access trapdoors, and creates major obstacles that cause same-level falls during movement.

What is the foreman's liability in the event of an accident caused by ice on the scaffolding?

The foreman must ensure the safety of workstations. If the foreman permits personnel to access unsecured, icy decking, liability may be incurred. Under CP, violation of the recognised rules of building and construction endangering bodily integrity is punishable by criminal penalties. The foreman must therefore order work suspension or immediate clearing.

Texts and standards cited

  • LAA art. 82 LAAGeneral prevention rules: the employer takes necessary and appropriate measures; workers assist the employer.
  • CP CPViolation of the recognised rules of building and construction: intentional or negligent endangerment during the execution or direction of construction work.

In the same section