Key takeaways
- The manufacturer's technical manual must be accessible on site from the first layout phase.
- Standard SN EN 12810 covers standard configurations without requiring a specific structural calculation note.
- Any geometric deviation or sheeting requires an execution plan and a verified engineer's structural sizing.
- The complete file remains permanently accessible to inspection bodies and site management.
Mandatory composition of the technical file before assembly begins
Erecting a façade scaffolding tolerates no improvisation in the field. Before placing the slightest wooden packer or adjusting the first base jack, the chargehand must possess all technical documents for the system used. The manufacturer's technical manual is the core document of the file: it sets out the assembly sequences, maximum bay lengths, bracing arrangements, and permitted tie patterns. Erecting a structure without this document equates to ignoring the stability assumptions used during type-testing of the equipment.
The Construction Work Ordinance sets out the general framework for hazard prevention and workplace organisation. Art. 3 OTConst stipulates that work must be planned in such a way that the risk of occupational accidents, occupational illnesses, or damage to health is as low as possible. In this framework, the technical manual serves as an operational guide to comply with permissible loads on scaffold decks and to guarantee the overall rigidity of the structure under horizontal loads.
- Original assembly instructions provided by the prefabricated system manufacturer.
- Standard anchor layout drawings and permissible pull-out values per fixing point.
- Detailed procedure for erecting temporary guardrails and collective erection protective equipment.
- Component identification sheet indicating load limits per working level.
The site folder is not limited to sales documentation. It also includes inspection records for the equipment, certifying that the steel frames, diagonal braces, and platforms show no plastic deformation, excessive corrosion, or weld cracks prior to installation.
Management of non-standard configurations and availability of plans during inspections
As soon as scaffolding deviates from the standard configuration documented in the manufacturer's manual according to standard SN EN 12810, it falls into the category of special structures. The most frequent cases in French-speaking Switzerland involve installing debris netting or watertight sheeting, heavy pedestrian gantry tunnels, significant cantilevers across glass roofs, or exceeding the standard height defined by the manufacturer. In these situations, the general manual is no longer sufficient.
- Non-standard configuration
- Any geometric arrangement, live load, or wind exposure not covered by the standard calculations in the manufacturer's manual. It requires a specific structural analysis with justification of load transfers and anchor ties.
For each non-standard assembly, a specific erection plan accompanied by a structural calculation note must be prepared by a civil engineer or the manufacturer's technical department. This plan specifies the exact positioning of reinforcing diagonal braces, the types of wall plugs in concrete or masonry, as well as the tensile forces to be resisted by each tie point. The Construction Work Ordinance demands absolute rigour in preparation: art. 4 OTConst requires that before starting work, the employer ensures that a plan exists detailing the measures necessary for the work carried out on the construction site.
| Structural typology | Supporting documents required | Required technical validation |
|---|---|---|
| Standard straight façade without cladding | Original manufacturer assembly manual | Verification by scaffold chargehand |
| Façade with debris netting or micro-perforated sheeting | Reinforced anchor plan and wind calculation note | Validation by a specialist engineer |
| Pedestrian gantry or bridging beams | Dimensioned execution plan with support details | Signed structural calculation note |
| Hung access tower or extra-wide bracket | General arrangement drawing and load-transfer diagram | Technical sign-off by a design office |
The accessibility of the technical file governs how safety inspections proceed. Suva inspectors, labour inspectors, or site management safety delegates can demand immediate presentation of documents. The complete file must be kept at all times in the site hut or in the safety binder under the responsibility of the foreman. The absence of a plan or usable manual during an inspection visit leads to an immediate stoppage of assembly operations or a formal prohibition on using the scaffolding until documentation is regularised.
Application of standard SN EN 12810 and limits of the manufacturer's manual
The assembly of prefabricated façade scaffolding relies on the design assumptions defined by the system designer in accordance with standard SN EN 12810. This standard governs standard configurations: maximum permitted heights, standard bay centres, bracing patterns, and standard façade tie patterns. As soon as the first frame is placed on its screw jacks, the ground team must have the manufacturer's original instruction manual, drawn up in an official language understood by the scaffolders.
The manufacturer's technical manual is not commercial literature. It specifies the exact assembly sequence, the requirement to install temporary or permanent advance guardrails before accessing the upper level, and the distribution of ties depending on whether the façade is open or sheeted with debris netting or impermeable tarpaulins. The Construction Work Ordinance also reiterates that work must be planned so as to reduce risks to the lowest possible level.
| Field inspection point | Original manual requirement | Direct impact on the construction site |
|---|---|---|
| Standard tie pattern | Regular staggered grid (often 1 tie per 24 m²) | Impossibility of anchoring into glazed openings without reveal ties or transom beams |
| Protective screening | Wind load calculated for bare, unclad structure | Fitting debris netting or sheeting multiplies pull-out forces |
| Access to working levels | Integrated access towers or trapdoor ladders according to cycle | Prohibition of climbing outside frames or diagonal braces |
| Support at structural base | Allowable bearing pressure under base plates and timber sole plates | Risk of settlement on compacted ground without suitable load-spreading pads |
Execution file for non-standard configuration and provision to inspectors
As soon as a temporary structure deviates from the scenarios described by the manufacturer, it enters the category of special structures. This applies to large cantilevers spanning a skylight, pedestrian passages laid out beneath lattice-girder gantries, complex corner offsets, or storage platforms for masonry materials that exceed the system's rated working load.
For these critical areas, a dimensioned execution plan must be produced by a civil engineering office or the scaffolder's technical department, accompanied by a structural calculation note justifying overall stability and load transfer at support points. Article 4 OTConst requires that before starting work, the employer ensures that a plan exists detailing the measures necessary for the work carried out on the construction site, drawn up in writing or in a form allowing proof by text.
This file must not remain filed away at the scaffolding company's head office or in an email inbox inaccessible to the assembly teams. A hard copy or an immediately printable digital version must be located in the site hut or in the foreman's vehicle. SUVA inspectors, cantonal occupational safety delegates, or site management are entitled to demand on-the-spot inspection of these documents.
- Present the manufacturer's assembly manual corresponding precisely to the make and model installed.
- Supply the specific layout drawing showing tie locations for any section deviating from the catalogue.
- Maintain the daily inspection sheet confirming checks on bolt torque and the integrity of existing ties.
- Verify anchor capacity using pull-out test reports on the base masonry.
Missing manual or assembly deviation: work-stop protocol and compliance
Placing a first frame without having the technical file exposes the scaffolder to an immediate loss of alignment and stability. When the manufacturer's assembly manual or execution plans are missing on the construction site, the team stops unloading and erection. The foreman notifies site management and the technical office of the scaffolding contractor to demand the transmission of approved documents before resuming any activity.
- Record of deviation or missing documentationThe chargehand stops assembly as soon as the façade geometry deviates from the manufacturer's standard manual (cantilever, unforeseen pedestrian passage, masonry reveal).
- Written notification to the technical departmentImmediate transmission of actual dimensions taken with a laser meter to prepare a specific plan and a stability calculation note signed by a civil engineer.
- Temporary stabilisation of the bayInstallation of temporary bracing props on erected frames and display of access prohibition signs on ladders and unfinished platforms.
- Filing and on-site displayInsertion of the new anchor layout and technical data sheets inside a waterproof pocket in the site cabinet or plan box accessible to inspectors.
According to art. 3 OPA, the employer must take the safety arrangements and protective measures that comply with the provisions of the ordinance, other applicable occupational safety regulations, and recognised rules of safety engineering and occupational medicine. Art. 4 OTConst requires that before starting work, the employer ensures that a plan exists detailing the measures necessary for the work carried out on the construction site, including the organisation of first aid; this plan must be drawn up in writing or in a form allowing proof by text. Strict compliance with this documentation ensures operations resume without compliance disputes.
Frequently asked questions
Where should the assembly manual be kept when the site has no enclosed office?
The manufacturer's manual must remain immediately accessible in the work area. In the absence of a site mess hut, the chargehand keeps the file inside a waterproof pouch in the response vehicle or in a padlocked plan box fixed to the base of the first access frame. Labour or Suva inspectors must be able to view it without delay during any unannounced site inspection.
Can the first lift be started if the engineer has not yet signed off the non-standard plan?
No. As soon as a façade scaffolding falls outside the standard configurations covered by standard SN EN 12810 or the manufacturer's manual, no component may be erected. Base plates and screw jacks depend directly on calculated load paths for that specific structure. Starting assembly without the signed plan exposes the contractor to a complete dismantle order during compliance inspections by the competent authority.
Is an electronic version of the manual on a smartphone sufficient during a Suva inspection?
Viewing a digital file on a tablet or smartphone is accepted by inspectors if the device remains on site and is immediately readable. However, a printed paper version, protected against moisture and tears, remains recommended in the field. It allows scaffolders to check anchor plans, diagonal bracing details, and load limits directly without relying on battery life or mobile network coverage.
Who takes responsibility for preparing the specific plan when deviating from standard SN EN 12810?
The appointed scaffolding contractor bears the responsibility of delivering the complete execution file. It commissions its own technical office or a civil engineer specialised in structural steel to size ties, bridging beams, or sheeting. Site management must sign off these documents before assembly work begins, confirming that the façade can withstand the pull-out forces transferred by the system.
Texts and standards cited
- OPA art. 3protective measures and equipment: the employer must take the safety arrangements and protective measures that comply with the provisions of the ordinance, other applicable occupational safety regulations, and recognised rules of safety engineering and occupational medicine.
- OTConst art. 4safety and health protection plan: before starting work, the employer ensures that a plan exists detailing the measures necessary for the work carried out on the construction site, including the organisation of first aid; this plan must be drawn up in writing or in a form allowing proof by text.