High-visibility vest: when it becomes mandatory for the erector

This chapter details the real-world situations where scaffolding erectors must imperatively wear high-visibility clothing. You will learn to identify critical risk areas — road encroachments, plant slewing, crane overflight — and select the appropriate visibility class to ensure the team's safety during ground handling and lifting phases.

Key takeaways

  • Wearing fluorescent clothing with retroreflective strips is strictly required by art. 7 OTConst.
  • Unloading on public roads and erecting along road edges require high visibility.
  • Moving within the working radius of cranes and mechanical excavators requires constant visual detection.
  • The choice of garment class depends on traffic speed and lighting conditions.

Identify erection configurations that require high visibility

On a building construction site, the scaffolding erector works directly at the interface between the structural work infrastructure and surrounding traffic. The delivery of frames, diagonals, and metal decking is commonly carried out from a lorry parked on the public highway. During this delivery phase, the team carries heavy and bulky loads that restrict their immediate field of vision. The erectors find themselves exposed to road traffic, which is often channelled into a single lane by temporary signage. This proximity to the public highway creates a permanent danger of impact, particularly when the clearance of light vehicles or public transport skims past the unloading area.

High-visibility warning clothing: to be worn when working near means of transport such as construction machines or transport vehicles, or near public roads (fluorescent colour with high visibility, retroreflective strips).

art. 7 OTConst

The other major risk involves direct coactivity with heavy machinery. As soon as the initial base levels are set out and the base jacks are installed, erectors walk within the operating zones of wheel loaders, concrete mixer lorries, and earthmoving excavators. The blind spots of modern construction plant frequently conceal a worker crouching down to chock a sole plate or assemble a ledger. Likewise, operations under a tower crane or mobile crane require immediate identification of the erector guiding the load or unhooking decking bundles suspended from slings.

Select the appropriate garment class for the erector's constraints

Selecting personal protective equipment is not limited to handing out a standard tabard. High-visibility clothing is divided into different categories defined by the minimum surface area of fluorescent textile (yellow, orange, or red) and retroreflective material. For scaffolding erectors, the cut of the garment must also combine optimal visibility from all angles with wearing a fall-arrest harness fitted with lanyards, without risking covering the reflective surfaces or impeding movements when installing advanced guardrails.

Classification of high-visibility clothing according to the working environment
Garment classVisible surface area levelErector working conditions
Class 1Low minimum fluorescent surface areaInternal construction site traffic at very low speeds, away from public roads.
Class 2Intermediate surface area (standard vest or T-shirt)Unloading on a closed pavement, crane slewing, plant at moderate speed.
Class 3Maximum surface area (jacket with sleeves or jacket-trousers combination)Work directly on the edge of an open carriageway, heavy traffic roads, night work.

When erecting scaffolding alongside a cantonal or municipal road without a full diversion, ground personnel use clothing that provides the highest level of peripheral visibility, namely a combined set that guarantees Class 3 requirements. Sleeves fitted with retroreflective strips are essential to make hand signals directed to crane operators or lorry drivers perceptible. During summer periods, certified Class 2 fluorescent T-shirts or polo shirts replace the simple layered vest to avoid excessive bulk beneath the fall-arrest harness.

Coordination with lifting plant and construction site traffic

On a building construction site, the scaffolding erector continuously operates within the slewing zones of machinery and under the working radius of heavy handling equipment. Art. 7 OTConst specifies that high-visibility warning clothing must be worn during work near means of transport such as construction machines or transport vehicles, or near public roads. These garments feature a high-visibility fluorescent colour as well as retroreflective strips. From the unloading phase of frames, decks, and metal brackets from the delivery lorry, the ground crew crosses paths with tipper lorries, dumpers, and earthmoving excavators.

The presence of a tower crane or mobile crane heightens the requirement for visual contrast. The slinger of the erection crew, responsible for slinging frame stillages or decking bundles, must be identified immediately by the crane operator and plant operator, including during blind-spot manoeuvres or in degraded weather. Sightlines from a plant cab leave significant blind spots at the foot of facades and along temporary storage areas. If an item of personal protective equipment becomes soiled with earth, formwork release oils, or anchor greases, the level of retroreflection drops sharply.

The gang leader adapts the attire according to the season and the integration of fall-arrest safety harnesses. Wearing a body harness over a loose tabard poses serious risks: the straps can conceal the retroreflective strips or become caught in attachment buckles. The erector favours a fitted garment or a vest equipped with back openings designed to let the sternal or dorsal attachment ring pass through, keeping the fluorescent fabric surfaces fully visible all around the torso.

Implementation adjacent to public roads and equipment maintenance

Setting out facade scaffolding on street frontages or narrow pavements directly confronts the crew with urban or cantonal traffic flows. In these configurations, the erector handles long components, often two to three metres in length, which temporarily encroach on the road clearance during the assembly phases of base jacks and the first standards. The close proximity to moving vehicles makes identifying the erector's silhouette critical, both by day and under street lighting at night.

Choice of garment class according to the scaffolder's working environment
Erection situationTraffic environmentMinimum required classStandard clothing configuration
Internal courtyard erection or closed rear facadeLow-speed handling plant (forklifts, dumpers)Class 1Harness sash or light tabard fitted over workwear
Main facade or logistics unloading areaInternal construction site traffic, delivery lorries, and cranesClass 2Sleeveless vest or approved high-visibility T-shirt
Street frontage, cantonal roads, or rail corridor edgesHeavy public traffic or speed limit above 50 km/hClass 3Long-sleeved jacket or full coverall with Class 2 trousers
  • Daily cleanliness check: any contamination with concrete dust or greasy residues neutralises the fluorescent pigments of the textile material.
  • Compliance with maintenance cycles: washing according to manufacturer guidelines to prevent degradation of the retroreflective strip micro-beads.
  • Systematic fastening: a garment left open across the chest halves the mandatory minimum surface area exposed to plant operators.
  • Immediate replacement in the event of fading due to ultraviolet rays or after tearing on a tie tube or wedge.

Managing non-compliances and site decisions at the erection front

On the construction site, a scaffolding erector's lack of visibility constitutes an immediate danger whenever operations intersect the path of a crane, the working radius of earthmoving plant, or road traffic. When safety instructions are not followed, the gang leader or foreman must intervene without delay to restore compliant conditions.

  1. Stopping operations in danger zonesHalt the supply of structural components as soon as an erector works without high-visibility clothing within the slewing area of a lorry-mounted crane or on a pavement open to traffic.
  2. Immediate equipment replacementRequire the immediate wearing of a compliant fluorescent tabard or jacket. If the item is soiled with grease or torn from contact with metal frames, replace it with a clean replacement from the site vehicle buffer stock.
  3. Coordination with site managementNotify the site supervisor and the site safety officer if third-party plant operators fail to respect the scaffolding footprint demarcation or enter the standard-handling zone.

In the event of repeated refusal to wear the prescribed equipment or in the face of uncontrolled coactivity with structural work machinery, the competent person suspends erection on the affected facade. Work only resumes once the ground working perimeter is fully secured and every erector is rendered clearly discernible.

Frequently asked questions

Is a Class 2 vest sufficient for supplying scaffolding alongside a municipal road?

On a municipal public road with moderate speeds, a Class 2 tabard or vest providing sufficient surface area of fluorescent fabric and retroreflective strips is generally accepted. However, as soon as visibility decreases or vehicle speeds increase, a Class 3 long-sleeved jacket becomes essential to ensure full perception of the erector's moving silhouette during unloading.

Can an erector wearing a fall-arrest harness put their high-visibility vest on over it?

The vest must be fitted so as not to impede the operation of straps or conceal the harness sternal or dorsal attachment points. If worn over it, it must not block any connectors or retractable fall arresters. The most practical solution is to use certified warning jackets fitted with factory-designed openings to let the harness attachment rings pass through.

Is wearing the vest still mandatory once on the third-floor scaffolding platform?

If the working level is out of reach of earthmoving plant and no crane lifts overfly the structure, wearing high-visibility clothing is no longer required on protected platforms. Conversely, as soon as the crane delivers decks or guardrails directly onto the working platform, the erector must remain fully visible to the crane operator and banksman.

What should be done if high-visibility clothing is smeared with formwork release oil or mud?

Heavy soiling destroys the fluorescence properties of the daytime textile and covers the micro-beads of the nighttime retroreflective strips. A heavily soiled garment no longer meets the safety criteria required on the construction site. The gang leader must remove it from service immediately and provide the erector with a clean replacement from the service lorry's onboard reserve.

Texts and standards cited

  • OTConst art. 5organisation of occupational health and safety: the employer shall designate on each construction site a competent person responsible for occupational health and safety, able to give directives to workers (para. 1); any person who, through their behaviour or condition, endangers themselves or others must be removed from the construction site (para. 2).
  • OTConst art. 7high-visibility warning clothing: to be worn when working near means of transport such as construction machines or transport vehicles, or near public roads (fluorescent colour with high visibility, retroreflective strips).