Key takeaways
- Standard SN EN 1004 imposes strict rules on mobile scaffolding geometry and outriggers.
- Outriggers remain deployed on the ground and locked as soon as the working platform is occupied.
- The running surface must be rigid, horizontal, clean, and free of any drop or obstacle.
- Any movement of the tower is carried out exclusively by hand and with no worker on the structure.
Ensure geometric stability and base support under standard SN EN 1004
Mobile scaffolding is among the equipment most exposed to overturning hazards on Swiss construction sites. Its apparent lightness and ease of use frequently prompt teams to neglect the basic laws of statics. Right from erection, the structure must scrupulously comply with standard SN EN 1004, which governs the design of prefabricated mobile access and working towers. The base rests on a quadrilateral whose ground dimensions dictate the maximum permissible height of the top working platform.
To reach the desired working height without changing the footprint of the vertical frames, the erector uses swivel or telescopic outriggers. These corner struts form an enlarged base polygon. Whenever they are stipulated by the technical manual or as soon as the height exceeds three times the smallest dimension of the base frame, their installation becomes mandatory before any further level is erected.
- Coupler positioningFasten the outrigger clamps to the vertical standards, adhering to the marks or heights prescribed by the tower manufacturer.
- Angular deploymentOpen the legs so as to form an even angle of approximately 45 degrees relative to the base transoms, creating a symmetrical and widened base.
- Firm ground contactLower the telescopic extension to the ground so that the foot rests firmly, then engage the safety pins and tighten the locking screws.
- Castor lockingEngage the individual double-action brake on each castor wheel to completely stop wheel rotation and castor swivel.
Prepare the running surface and arrange exclusively empty movement
The kinetic behaviour of a mobile tower depends on the travel surface. A pothole, an access ramp, an unsecured service opening, or a door threshold can be enough to cause a critical tilt and the abrupt locking of a wheel, triggering the leverage effect that overturns the structure. In accordance with art. 3 OPA, the employer takes the protective measures that meet recognised technical rules. The condition of the ground must undergo a rigorous visual and geometric inspection along the entire planned path.
| Inspected item | Required condition | Corrective measure |
|---|---|---|
| Substrate strength | Solid concrete slab or compacted asphalt | Placement of timber baulks or load-spreading boards |
| Levelness and gradient | Gradient under 1% without level drop | Compensation using screw jacks before static use |
| Obstacles and penetrations | Absence of rubble, sills, ducts, or rebar | Careful cleaning and filling or rigid bridging |
| Floor openings and leading edges | Safety distance equal to total height | Installation of a physical stop barrier on the ground |
Moving mobile scaffolding is subject to an absolute, non-negotiable prohibition on construction sites: no person may be on the structure, regardless of the platform level, during movement. This prohibited practice causes fatal falls caused by overturning of the frame. The inertia of a human body perched at the top amplifies the overturning moment at the slightest jerk during rolling.
Movement is always carried out manually, by pushing the structure at base level or at the lower standards, at chest height. It is strictly forbidden to tow mobile scaffolding using powered machinery such as a telehandler or a dumper. Operators must first ensure that no overhead cables, electrical installations, or false ceilings obstruct the path. As soon as the final position is reached, all four wheel brakes are re-engaged, the outriggers are tightened firmly against the ground, and the overall level of the tower is checked with a spirit level before any personnel climb up again, in application of art. 82 LAA concerning appropriate preventive measures.
Checking the height-to-base ratio and deploying outriggers
The mobile tower is critically sensitive to overturning under the effect of wind, horizontal forces applied during works, or slight substrate irregularities. To guarantee static and dynamic stability during operations, standard SN EN 1004 sets the rules regarding the ratio between the height of the top working platform and the smallest dimension of the supporting base on the ground.
The base width considered in the calculation is not limited to the vertical standards of the tubular frame, but includes the spread provided by correctly locked outriggers or base-widening beams. Without these accessories, a standard tower with a small footprint immediately reaches its permissible geometric limit, which prohibits any upward extension of the working platform.
| Site configuration | Max H/B ratio | Outriggers required | Additional measures |
|---|---|---|---|
| Enclosed indoors (sealed building) | 4 to 1 | As soon as H > 4 times smallest width | Complete locking of wheels when stationary |
| Sheltered or exposed outdoors | 3 to 1 | As soon as H > 3 times smallest width | Tying-in or dismantling if wind is forecast |
| Work with horizontal thrust | As per manufacturer manual | Mandatory at all four corners | Local anchoring to the load-bearing structure |
Installing outriggers cannot be improvised during commissioning. The four support legs must be lowered and clamped so as to enlarge the support polygon symmetrically. The erector ensures that the rubber pads or base plates rest firmly on the slab or raft, without lifting the swivel wheels off the ground, but while absorbing part of the overturning moment.
Strict handling rules and prohibition of moving with personnel on board
Moving a mobile tower is the operational phase that causes the most serious accidents on construction sites in French-speaking Switzerland. The temptation to save a few minutes by keeping an operator on the top platform during movement constitutes gross negligence that directly breaches basic scaffolder trade rules.
- Complete evacuation of personnel and loadsImperatively have all workers climb down through internal access trapdoors and unload heavy tools or materials stored on the working platform.
- Visual route inspectionCheck the running surface for levelness, clear rubble, and steer clear of drainage channels, floor openings, or unprotected service ducts.
- Millimetric lifting of outriggersUnscrew or raise the outrigger pads by only a few millimetres above the travel area, so that they act immediately as anti-roll stops in the event of an unexpected imbalance.
- Brake release and manual pushingRelease the swivel castor brakes and push the scaffolding solely from the base, using arm strength, without ever using motorised plant to tow the structure.
- Immediate immobilisation and level checkOnce the new position is reached, lock the wheel brakes inline, lower the outriggers into firm bearing contact, and check the spirit level before anyone climbs up again.
The employer and the site foreman ensure that these operational requirements are strictly integrated into work practices. In accordance with art. 82 LAA, to prevent occupational accidents and diseases, the employer must take all measures shown to be necessary by experience, applicable according to the state of technology, and adapted to the given conditions. Training personnel on the manufacturer's instruction manual and systematically refusing to move an occupied tower stem directly from this duty of prevention.
Operationally, the construction work ordinance requires seamless organisation to eliminate the hazard of falls from height. Whenever a maintenance or finishing work operation involves the use of a mobile structure, art. 3 OPA requires the employer to take the protective arrangements and measures that meet the provisions of the ordinance, other applicable occupational safety provisions, and the recognised rules of safety engineering and occupational health. Using solely towers certified compliant with standard SN EN 1004 fulfills this statutory requirement.
Managing rolling incidents and immediate safety securing
On construction sites, a mobile access tower almost always overturns due to overconfidence during an impromptu shift. As soon as a castor sinks into a poorly covered penetration, an outrigger strikes an obstacle, or a plumb defect appears, movement must stop immediately. The team freezes the structure without attempting to hold it back with arm strength, which poses a major risk of crushing injuries.
- Exclusion zone evacuationMarking out a ground exclusion zone equal to the total height of the scaffolding to safeguard against any unexpected overturning.
- Temporary relief tyingInstalling textile ratchet straps or scaffold tubes and couplers connected to a load-bearing element of the neighbouring permanent structure to stabilise the unit.
- Removal of loads and platform decksSystematically lightening the tower from an independent, safe means of access before any levelling adjustment or partial dismantling.
The lead erector then inspects the condition of the standards and diagonals. Any component bent by dynamic torsion must be permanently scrapped. The general contractor records the incident in the site logbook. In the event of a deliberate breach of recognised technical rules resulting in mortal danger, liability falls under applicable criminal provisions. Art. 229 CP punishes with a custodial sentence of up to five years or a monetary penalty anyone who, when directing or carrying out a construction or demolition, intentionally breaches the rules of the trade and thereby knowingly endangers the life or physical integrity of persons.
Frequently asked questions
Can a worker remain on the platform if the scaffolding is moved by only fifty centimetres?
No. Moving mobile scaffolding with personnel on board is strictly prohibited, regardless of the travel distance. Shocks, the sudden snagging of a wheel, or the shifting of the centre of gravity cause instantaneous tipping that is impossible to arrest. The user must step down, latch the access hatch, participate in or oversee the shift from the ground, and then engage all brakes before climbing up again.
How should outriggers be configured if one side of the scaffolding runs along a masonry wall?
When the tower is positioned against a solid façade, the outriggers on the wall side may be folded back or positioned flat parallel to the wall, on the express condition that the structure cannot move away from the building. Conversely, the outriggers located on the side opposite the wall and on the lateral sides must remain fully deployed, locked, and in firm bearing contact to maintain the height-to-base geometric ratio in accordance with the manufacturer's instructions.
What should be done when the ground has a continuous slope exceeding one per cent?
On a screed or raft with a slope exceeding the levelling tolerance, direct rolling becomes too dangerous. A continuous, horizontal rolling track must be laid out using closely fitted timber baulks or rigid, levelled boards. Wheel jack travel is solely intended to compensate for slight variations in level when stationary, never to allow free transversal travel on an inclined plane.
At what point does erecting a mobile tower trigger an obligation for permanent wall ties?
As soon as the platform height exceeds the free-standing stability limits calculated without anchors according to the technical manual, or in the presence of sheeting and debris netting that creates unforeseen wind load. The scaffolding then loses its status as a free-standing mobile structure. It must be tied to the rigid structure using anchor bolt fixings or coupling tubes compliant with the requirements of the construction work ordinance.
Texts and standards cited
- LAA art. 82general prevention rules: to prevent occupational accidents and diseases, the employer must take all measures shown to be necessary by experience, applicable according to the state of technology, and adapted to the given conditions; the workers shall assist the employer (they shall notably use personal protective equipment).
- CPbreach of the rules of the art of building: whoever, when directing or carrying out a construction or demolition, intentionally breaches the rules of the art and thereby knowingly endangers the life or physical integrity of persons shall be liable to a custodial sentence not exceeding five years or to a monetary penalty; in the case of negligence, to a custodial sentence not exceeding three years or to a monetary penalty.
