🧱 CFC 212Erector safety and co-activity on the construction siteChapter 1 of 10 in the section

Harness and lanyard during erection: mobile anchor point and length preventing pendulum effect

During the erection and dismantling of facade scaffolding, the risk of falling is ever-present before final guardrails are installed. This chapter details the rules for using personal fall protection equipment: daily equipment checks, selecting a strong mobile anchor point on the structure being erected, and adjusting the lanyard to eliminate the pendulum effect.

Key takeaways

  • Visually inspect the harness and self-retracting lanyard before every shift on the construction site.
  • Clip the carabiner exclusively onto vertical elements or assembly nodes that are already rigid and stabilised.
  • Adjust the lanyard length as short as possible to restrict the free-fall distance below the working level.
  • Position the anchor point above head height to prevent swinging against the scaffolding structure.

Selecting the mobile anchor point and pre-use PPE inspection

Erecting facade scaffolding requires the erector to tie off to elements they have just assembled, even before the upper bay is fully secured by guardrails. This transitional phase demands absolute rigour in inspecting equipment and designating tie-off points. In accordance with SUVA guidelines and art. 82 LAA, the employer provides suitable personal protective equipment, and the erector has a strict obligation to use it correctly in the field.

Selecting the anchor point must never be left to chance. Clipping a carabiner onto an unfastened intermediate rail or an unsecured tube is strictly prohibited. The permissible anchor point must be located on an element of the structure that is already perfectly stable and braced: a standard tied to the facade, an assembly node locked with wedges, or a structural component approved by the scaffolding manufacturer. The anchor must be capable of withstanding the dynamic forces generated when arresting an erector if they tip over.

Adjusting the short lanyard and preventing the pendulum hazard

Managing fall clearance and the fall trajectory is the cornerstone of the operative's individual safety. Using a lanyard that is too long on a scaffolding level under construction is a dangerous trap. In the event of a slip, a slack lanyard allows the body to accelerate in free fall over excessive height before the energy absorber deploys, substantially increasing the physical impact and collision risk.

Pendulum effect
An uncontrolled swinging motion that occurs when an operative falls while anchored offset laterally from their attachment point. The circular path causes a violent collision against the scaffolding standards or the facade wall.

To eliminate the pendulum effect, the erector must use a short lanyard or a self-retracting lifeline (compact webbing block). The mobile anchor point must be located above shoulder level, ideally directly overhead. The higher the anchor point is relative to the harness dorsal ring, the shorter the free-fall distance. If the operative needs to move along the working platform, they advance their anchor point progressively or use a twin-tail lanyard to maintain 100% tie-off without creating a pronounced arc.

  1. Overhead positioningSelect an anchor point located above the head on a standard tied back to the masonry.
  2. Lanyard adjustmentAdjust the lanyard to maintain constant tension without creating superfluous slack above the void.
  3. Safe movementConnect the second leg of the lanyard to the next node before disconnecting the first leg during horizontal travel.

Applying Suva guidelines for anchoring during scaffolding erection

As the scaffolding progresses vertically, collective protection using temporary guardrails is not yet fully in place. During this critical phase, the erector must mandatory use personal fall protection equipment (PFPE). In accordance with Suva guidelines, harness use is only permitted if the system is clipped to a structural element capable of absorbing the dynamic forces generated by emergency fall arrest.

Selecting a mobile anchor requires identifying a point above the erector's waist, ideally at the upper assembly node (junction between standard, transom and diagonal brace). Using an energy-absorbing lanyard requires verifying that the fall clearance available beneath the operative's feet is sufficient to prevent impact with the ground or a lower level in the event of a fall.

Anchor requirements according to structural progress
Structural elementRequired stabilityEligibility as anchor point
Isolated standard without wall tieUnstabilisedProhibited (risk of progressive collapse)
Assembly node with verified wall tieStabilised per erection schemeAuthorised by Suva guidelines
Final locked guardrailFully fixed and pinnedAuthorised for short lanyard

Adjusting the lanyard and preventing the pendulum effect

The pendulum effect occurs when the erector moves too far from the vertical axis of their anchor point. In a fall, the straight downward trajectory turns into an oscillating motion that can slam the worker against the metal frame components or facade projections. To eliminate this risk, art. 29 OTConst requires implementing equivalent safety measures tailored to the specific configurations of work at height.

To eliminate the swing hazard, the erector adjusts the length of their quick-adjust lanyard. They keep the connection as short as possible to reduce free-fall distance to the bare minimum. When the work requires significant lateral movement across the working deck, the erector moves their anchor point from node to node rather than playing out excessive lanyard length.

  1. Visual and functional equipment inspectionBefore donning the harness, the operative checks for cuts on the webbing, inspects safety stitching, tests buckle operation, and verifies the equipment's annual inspection date.
  2. Defining the travel zoneIdentify the high anchor point closest to the plumb line of the planned working position to avoid any excessive lateral offset.
  3. Lanyard adjustment and lockingAdjust the lanyard leg to keep it taut, verify the automatic locking of scaffold hooks, and ensure that the energy absorber is ready for deployment.

The employer and site foreman must ensure strict compliance with protective equipment in accordance with the general rules set out in art. 82 LAA, which requires taking all necessary preventive measures and ensuring that workers correctly use the equipment provided.

Managing erection deviations, anchor failures, and emergency procedures

During the vertical extension phases of facade scaffolding, accident risk remains at its peak as long as the structure is not fully braced and tied to the masonry. If an erector makes an error of judgment in selecting their mobile anchor point or if a scaffolding component shows signs of instability under anchor loads, the construction site must switch immediately to an emergency stop procedure. In accordance with Suva directives on the use of personal fall protection equipment (fall protection PPE), the erector must under no circumstances tie off to an element being assembled or to a loose tube not secured at both ends.

If any defect is detected on a harness (frayed stitching, partially deployed energy absorber, deformed self-locking carabiner), the equipment must be removed from service immediately, marked as unfit for use, and destroyed. Visual and functional inspection of equipment before every shift is the erector's fundamental duty to protect their physical integrity. The employer takes all necessary measures shown by experience to be essential and adapted to state-of-the-art technology to prevent accidents, in accordance with art. 82 LAA.

  1. Halting erection and cordoning offStop erection immediately upon any doubt regarding standard stability or anchor point strength. Bar access to the affected bay.
  2. Securing personnelWithdraw operatives to the lower platform that is already stabilised and tied to the structural work before attempting any technical checks.
  3. Technical assessment and corrective actionInvestigate the root cause of instability under the direction of the competent person designated for safety, then install the required ties or diagonal braces.

Site safety management requires appointing a competent person empowered to issue clear instructions to work crews, pursuant to OTConst. During intensive coactivity with other trades (bricklayers, carpenters, roofers/tinsmiths), the site manager ensures that no lower-level work exposes personnel to falling objects or impinges upon the clearance height required in the event of an erector falling.

Frequently asked questions

Can you anchor directly to a vertical scaffolding standard during erection?

Yes, but only if the lower bay is fully assembled, braced with diagonals, and tied to the building using an approved tie. Tying off to a standard that has not yet been stabilised is prohibited by Suva, as the structure would tip over under fall impact forces, bringing the erector down without arresting the load.

How do you select the exact lanyard length to avoid the pendulum effect?

The lanyard must be adjusted as short as possible to limit free fall to under 50 cm. If the anchor point is positioned laterally away from the erector, a long lanyard produces a circular fall trajectory that swings the operative violently against the scaffolding standards or the facade.

What should you do if the fall clearance below the operative is less than 4 metres?

A standard energy-absorbing lanyard requires minimum clearance (often between 4.75 m and 6 m). If headroom is insufficient, using an instant-locking self-retracting lifeline or erecting temporary guardrails beforehand from the secured lower level becomes mandatory.

Who must carry out the daily inspection of the harness and connectors?

The erector is responsible for carrying out a visual and tactile check of their own equipment (webbing, stitching, carabiners) before each shift. In addition, an in-depth inspection by a qualified competent person must be documented at least once a year or after any arrest event.

Texts and standards cited

  • LAA art. 82General prevention rules: the employer takes all necessary measures adapted to technical progress, and workers use personal protective equipment.
  • OTConstOccupational safety organisation: designation of an authorised competent person on the construction site responsible for safety and issuing directives.