Mobile, Suspended, and Temporary Structures: Execution Standard

Aimed at scaffolding erection chargehands, foremen, and site managers, this section compiles execution rules for all temporary structures outside standard facades. From wheeled mobile towers to powered suspended platforms, through temporary roofs and protected walkways on public land, it details structural sizing, support connections, structural anchoring, and erector safety against specific overturning and fall hazards.

  • 10chapters
  • 22 000words
  • 6sections in the training course
  • 60chapters in total

Key values to remember 5

OTConst art. 41

2 m

Fall height above which appropriate fall protection measures must be taken along roof edges

OTConst art. 41

60°

Roof pitch above which work may only be carried out from scaffolding or an elevating work platform

OTConst art. 22

100 cm

Minimum height of the upper edge of the top guardrail on an edge protection system

OTConst art. 22

15 cm

Minimum height of the toeboard on an edge protection working guardrail

OTConst art. 22

47 cm

Maximum permissible vertical clear gap between longitudinal guardrail elements

Technical Scope of Temporary Structures and Competence Limits

This section covers exclusively the erection, adaptation, conformity inspection, and dismantling of special temporary structures falling within the direct competence of scaffolding erectors (CFC 212). These structures differ from standard straight facades due to their specific mechanical loads: significant cantilevers, dynamic wind loads on temporary roofs, mobility of loads on castors, or complete offset on traction wire ropes. They demand superior execution rigour whenever direct ground support is lacking or building geometry requires complex bridging.

Working on these structures often departs from manufacturers' standard configurations. As soon as a mobile tower exceeds the dimensional limits of standard SN EN 1004 or a suspended platform rests on historic parapets, the erector must have the load descent and force transfers validated by an engineer's structural calculation sheet. Under OTConst, when it is technically impossible or too hazardous to erect standard collective fall protection, equivalent measures must be defined in writing by consulting an occupational safety specialist.

Typology of Temporary Structures and Dominant Loads
Structure typePrimary loadCritical inspection pointReference standard
Mobile towerDynamic overturningWheelbase and castor wheel lockingSN EN 1004
Suspended platformTension and pull-outCounterweights and safety wire ropeOMach, RS 819.14
Cantilever scaffoldingBending and shearLoad-bearing capacity of anchor plugs and transomsConstruction Work Ordinance
Temporary roof (umbrella)Wind upliftBallast, tie-backs, and sheeting continuitySafety engineering standards

Technical Progression: From Mobility to Heavy Protection

The chapter sequence has been designed to structure site working methods, starting from lightweight self-supporting systems and progressing towards structures with heavy structural load transfers. The erector starts by mastering the equilibrium of ground-based mobile equipment with mobile access towers [E5-01], where base geometry and the strict prohibition of moving towers with personnel aboard form the baseline rules. The progression then tackles overhead suspension techniques [E5-02] and cantilever platforms anchored into masonry or concrete [E5-03], two cases where verifying the host structure conditions team survival.

The second part addresses large-span enclosures and public interactions. Temporary roofs, known as umbrellas [E5-04], require in-depth analysis of horizontal and vertical weather forces. Covered walkways in urban environments [E5-05] introduce strict requirements for clearance profiles, impact resistance against falling materials, and municipal permits for encroachments on public property.

  1. Confined Spaces and Internal DeckingChapters [E5-06] and [E5-07] guide erection inside narrow stairwells and the installation of safety net arrays below roof structures, arresting falls from the underside without continuous points of support.
  2. Heavy Structures and Exceptional LoadsChapters [E5-08] and [E5-09] cover temporary shoring of historic facades subjected to wind loads after internal demolition, as well as staging receiving heavy dynamic public live loads.
  3. Work on Steep SlopesChapter [E5-10] concludes the series on working on pitched roofs according to art. 41 OTConst, detailing the use of roof brackets, tinsmith platforms, and temporary lifelines.

📘 Chapters in this section 10

Mobile, suspended and temporary structures

Mobile scaffolding: outriggers, permissible height, and empty moving

Secure the wheelbase, adjust outriggers, and move mobile towers without risking overturning.

Mobile, suspended and temporary structures

Suspended platform: suspension jibs, counterweights and cable fall arrester

Calculate davit counterweights and lock secondary rope fall arresters to work suspended safely.

Mobile, suspended and temporary structures

Cantilever scaffolding: transferring load to the existing structure

Size brackets and anchor plugs to transfer heavy cantilever loads safely into concrete.

Mobile, suspended and temporary structures

Temporary roof scaffolding: covering a roofing site during works

Erect a weathertight, wind-resistant temporary roof to protect an exposed timber framing site.

Mobile, suspended and temporary structures

Covered pedestrian walkway: clearance, lighting and municipal permit

Set up a pedestrian tunnel meeting statutory clearances, with robust lighting and impact-resistant decking.

Mobile, suspended and temporary structures

Internal scaffolding in stairwells: flight supports and void protection

Erect stable scaffolding on spiral or straight stair treads without obstructing required escape routes.

Mobile, suspended and temporary structures

Underside safety netting: fall height, attachment points and overlap

Install safety nets under roof trusses with correct mesh sizes, drop heights, and certified anchor points.

Mobile, suspended and temporary structures

Shoring a retained façade: raking shores, ballast, monitoring

Design heavy-duty propping using raking shores and ballast blocks to support a freestanding facade.

Mobile, suspended and temporary structures

Temporary Grandstands and Stages: Public Load, Guardrails, and Authorisation

Assemble stages and grandstands for public use complying with dynamic live loads and reinforced guardrails.

Mobile, suspended and temporary structures

Working on a pitched roof: roof scaffolding, safety hooks and lifeline

Install roof brackets, fall-arrest anchors, and safety hooks to carry out work on steep roof pitches.