Skip to content
Website
🧱 CFC 212Mobile, suspended and temporary structuresChapter 10 of 10 in the section

Working on a pitched roof: roof scaffolding, safety hooks and lifeline

This chapter details the selection rules between a tinsmith scaffold and a catch platform depending on the roof pitch. You will learn to verify the resistance of existing hooks, arrange brackets and carry out rigid mechanical anchorages on roof framework without puncturing waterproofing membranes or damaging finished coverings.

Key takeaways

  • The roof pitch determines the exclusive choice between a simple guard rail and a working platform.
  • OTConst art. 41 specifies the mandatory edge devices depending on the height and pitch.
  • Existing hooks require systematic checking before serving as mooring points for equipment.
  • Anchoring onto rafters beneath the roof covering guarantees stability without piercing waterproofing membranes.

Determine the collective protection required according to the roof pitch

On an inclined roof, the sliding component rules out assembly approximations. The scaffolding erector adapts the perimeter structure and roof brackets to the actual slope of the roof covering. According to OTConst art. 41, appropriate measures to prevent falls must be taken from a fall height of more than 2 m, with the installation of a tinsmith scaffold or a peripheral guard rail depending on the roof pitch, whereas on roofs with a pitch greater than 60°, work is carried out solely from scaffolding or a mobile elevating work platform.

Scaffolding devices required according to the roof pitch angle
Roof pitchFall kinematicsArresting device at the edgeStructure required on the slope
Up to 25°Low slip risk, easy arrest simply by bracingPeripheral guard rail with toeboardFree movement without roof brackets
From 26° to 45°Body acceleration, uncontrollable slideTinsmith scaffold with safety netRoof scaffolding brackets recommended
From 46° to 60°Partial free fall along the slopeSolid retaining wall or close-meshed netMandatory stepped platforms with deckings
> 60°Direct vertical fall equivalent to a façadeRaised façade scaffoldingContinuous working platform, work on slopes prohibited

When the angle exceeds 25°, the tradesperson's body can no longer brake by friction on tiles or metal. Installing brackets suspended from or bearing on rafters becomes necessary to create horizontal working deckings at least 60 cm wide. These intermediate platforms reduce the residual sliding height and provide a stable footing for tinsmithing, roofing or solar panel installation works.

Load-transfer techniques and fixing without membrane perforation

The transmission of forces exerted by a roof bracket requires a rigid transfer of tensile and compressive forces. A frequent error consists in resting the metal framework directly on the roof covering material or puncturing under-roof waterproofing membranes with anchor bolts. A qualified erector locally strips the tiles to fix clamping brackets or metal lugs bolted directly into the roof framework rafters.

  1. Inspection of the load-bearing frameworkCheck the cross-section and sound condition of the load-bearing rafter after carefully stripping the local roof covering. Under no circumstances must counter-battens and battens take up pull-out forces.
  2. Installation of the under-roof bracketPosition a galvanised steel anchor lug fixed by structural screwing into the centreline of the rafter, bypassing the membrane without puncturing it or reinstating waterproofing with suitable adhesive collars.
  3. Temporary reinstating of the coveringReplace the tiles ground down or shaped around the metal lug outlet to avoid any crushing or rainwater ingress during the construction site operations.
  4. Locking the roof bracketConnect the tubular upright of the roof scaffolding to the anchor lug using standardised right-angle couplers, inserting neoprene shims on lower bearing points to protect the tinsmithing.

Compliance of existing roof hooks and structural anchor points

When working on existing roofs, the scaffolding erector encounters existing safety hooks intended for maintenance or tinsmithing. There is often a temptation to use them immediately to retain roof gangways, secure slope brackets or fix temporary lifelines required during erection. However, the visual presence of a metal bracket embedded or screwed into a rafter offers no guarantee of its residual mechanical resistance or the exact nature of its fixing in the timber.

Applying recognised good practice entails rigorous documentary and visual checks before any use as a retaining point. Under OTConst art. 41, appropriate measures must be taken at roof edges to prevent falls from a fall height of more than 2 m, with requirements adapted to the pitch of the slopes, and work on roofs with a pitch of more than 60° is carried out solely from scaffolding or a mobile elevating work platform. An attachment point intended to take up the load of a lifeline or the weight of an inclined working deck cannot be improvised.

Assessment criteria for existing attachment points on roof framework
Element present on the roofVisual or documentary findingDecision of the scaffolding erector
Galvanised safety hookIdentification plate missing, surface corrosionProhibited for fall arrest use; remove or bypass with an independent structure
Standardised tinsmith hookTechnical file available, fixing verified on load-bearing rafterUse permitted exclusively for individual restraint during guard rail installation
Tubular ridge barThrough-fixing without access to locknuts in the attic spaceRejected for slope scaffolding mooring; install temporary struts on the main structure

Mooring devices without penetrating the waterproofing

One of the major technical challenges of erection on a covered slope concerns load transmission without damaging functional layers: bituminous sheets, synthetic membranes or integrated photovoltaic panels. Any puncture not specified in the project compromises water tightness and creates ingress paths that are difficult to repair after dismantling the equipment. The scaffolding erector therefore systematically favours mechanical connections bridging the ridge, cantilever suspensions or supports clamped onto peripheral masonry.

  1. Ridge balancing via counterweighted bracketsInstallation of curved metal profiles bridging the ridge without harsh contact. The sliding forces of the working platform on one slope are balanced by the descending structure of the opposite slope or by ballast boxes fitted with high-density elastomer load-spreading bearing pads.
  2. Mooring on overhanging structural elementsTransfer of forces via couplers and scaffold tubes clamped directly around wall plates or uncovered external rafter heads. The erector locks hardwood blocks in place to protect edge tinsmithing against crushing.
  3. Brackets passing through roof windowsLocking horizontal shoring beams through dormer openings or open existing roof windows. Mooring tubes are clamped to vertical props placed between the attic floor and the load-bearing framework within the space.

When access to both slopes is impossible for setting up ridge balancing, load transfer is achieved via façade anchors located directly beneath the roof overhang. Vertical tubes run up the external wall, extend past wall-plate level and deploy cranked uprights that follow the slope line without compressing it. Load distribution under base jacks must utilise continuous square-sawn timber sole plates laid on rot-proof protective felt, avoiding any localised punching of roofing materials.

Managing unforeseen mooring issues and base failures

On an inclined slope, discovering a worm-eaten rafter, rejection of an existing service hook or a strict ban on puncturing a bituminous sheet alters the erector's approach. Faced with a dubious base, the team halts the installation of working platforms. OTConst art. 41 governs the measures to be taken at roof edges to prevent falls from a height of two metres and specifies that on roofs with a pitch greater than 60°, work is carried out solely from scaffolding or a mobile elevating work platform.

  • Presence of a rusted, deformed safety hook or one lacking compliance marking: anchoring a bracket or pitch console is prohibited.
  • Discovery of rotted sarking under the tile during the installation of a rafter clamp: immediate retreat to an adjacent sound bay.
  • Technical impossibility of shimming a base shoe without pinching the waterproofing upstand or crushing a zinc junction flashing.
  1. Halting erection and temporary securingErectors stop progress as soon as a fixing lacks resistance. Equipment already positioned is secured using ratchet lashing straps to validated load-bearing elements to prevent any gravitational sliding.
  2. Formal notification to site managementIn accordance with the duty to notify under the works contract, the erector reports defects in the substrate or the impossibility of anchoring without puncturing existing waterproofing in writing. Resumption of operations requires a solution approved by the civil engineer or the tinsmith.
  3. Switching to an alternative solutionIf the tinsmith scaffold at the eaves is no longer sufficient or direct anchoring proves unfeasible, the structure is modified: transitioning to a ground-based tubular scaffold with cantilever brackets, or using a mobile elevating work platform.

Frequently asked questions

Can existing roof hooks be used to anchor a roofer's scaffolding?

No, an existing hook must not serve as an anchor by default. Without a technical document proving its compliance and maintenance condition, the erector cannot commit the restraint of the structure to it. Direct connection to the load-bearing framework must be verified or specific temporary through-clamps installed. In case of doubt, a ground-supported structure remains mandatory to take up loads without relying on these components.

Which solution should be favoured if any puncture of the waterproofing membrane is refused?

The solution consists in erecting façade scaffolding anchored to load-bearing walls, then extending cantilevered roof brackets over the slope without destructive contact. Neoprene shims or spreader shoes placed on the new membrane only receive the vertical bearing load of the stabilising base plates. Sliding forces are then fully taken up in tension by the ridge via apex-bridging beams.

Up to what roof pitch is a tinsmith scaffold sufficient?

A tinsmith scaffold installed at the edge or eaves protects slopes up to moderate pitches in accordance with trade safety rules. As soon as the pitch steepens or reaches critical values, the slip hazard prevents a stable standing posture: it becomes necessary to install stepped working brackets or a genuine continuous platform along the slope to secure workers at their station.

How should roof brackets be stabilised during dismantling in the rain?

Dismantling is carried out in the exact reverse order of assembly, from the ridge to the eaves. The team progresses while remaining tied off to upstream anchorage points. Each bay of decking is removed before loosening the corresponding mechanical anchor. Because wet surfaces drastically increase slip hazards on tiles or metal sheets, removing tubular components requires rope guidance without overloading the remaining brackets.

Texts and standards cited

  • OTConst art. 41measures to be taken at roof edges: appropriate measures to prevent falls from a fall height of more than 2 m (tinsmith scaffold and/or peripheral guard rail depending on roof pitch); on roofs with a pitch of more than 60°, work solely from scaffolding or a mobile elevating work platform (para. 3)

In the same section