Key takeaways
- Dry setting out on the slab determines cuts and prevents irregular perpends.
- Single-batch supply of pre-mixed mortar guarantees a perfectly uniform facing shade across the entire structure.
- Tooling with a half-round jointer takes place as soon as the mortar begins to set under finger pressure.
- Immediate protection of wall tops under tarpaulins prevents wash-out and irreversible staining.
Setting out to the millimetre and controlling mortar colour
In fair-faced masonry, concrete blocks tolerate no subsequent compensation with render. Any vertical misalignment or variation in bed joint thickness remains immediately visible under raking light. Before spreading the first shovel of mortar, the team lays out the first course dry on the slab or concrete base. This test run enables the distribution of perpends, generally gauged at 10 mm, absorbing dimensional tolerances inherent to precast concrete blocks in accordance with Swiss codes of practice.
Setting out systematically begins at critical points: external corners, door and window reveals, or integrated vertical stiffeners. The mason uses a height gauge rod marked with the modular height of the block plus the 10 to 12 mm bed joint. Rigorous horizontal alignment is achieved using a taut line stretched between firmly braced metal corner profiles. Any level adjustment through excessive mortar build-up is prohibited, as it causes differential settlement and joint shearing as the wall rises.
| Inspected element | Standard laying tolerance | Corrective action on the construction site |
|---|---|---|
| Bed joint thickness | 10 mm to 12 mm (± 2 mm) | Adjust mortar consistency and the gauge rod |
| Perpend thickness | 10 mm (± 2 mm) | Redistribute spacing on the dry first course |
| Plumb over one storey height | Compliant overall gauge | Check with a 2 m aluminium straightedge at each course |
| String line alignment | Straightness without sag | Tension the centre line on rigid profiles at the ends |
Variations in mortar shade represent the second major pitfall of fair-faced masonry. A minor change in the water-cement ratio, a change in sand supplier, or cement from a different batch will alter the binder tone after drying. For fair-faced works, the construction site must imperatively use factory-made dry mortars from silos or bags from the same production batch, mechanically mixed with a fixed water dispenser. The use of colouring admixtures or pigments shovelled manually on site is strictly prohibited.
Profiling the joint with a jointer and protecting the face until handover
Two distinct techniques govern joint treatment: joints struck flush and tooled into the green mortar as laying progresses, and deferred pointing after raking out. The struck joint remains the fastest and soundest method for concrete blocks, provided the waiting time is properly managed. When the mortar begins its initial set and resists moderate thumb pressure, the mason runs the metal jointer—either half-round or flat and slightly recessed by 1 to 2 mm—to pack the material firmly against the block edges.
- Initial trimming with the trowelCut off excess mortar squeezed out by the bedding of the block at an angle with a clean trowel stroke, as soon as the unit is placed, without rubbing the face.
- Waiting for stiffeningAllow the mortar to stiffen according to ambient temperature and relative humidity until it reaches a firm plastic consistency, with no surface water sheen.
- Methodical tooling with the ironFirst compress all vertical joints using a short jointer, then strike the horizontal joints in continuous passes with a long jointer to ensure continuity.
- Dry face-brushingRemove hardened residual mortar burrs using a soft coco-bristle brush or a clean mason's broom, brushing diagonally without touching the fresh joint.
The joint profile must never form a recessed horizontal ledge that could trap rainwater or dust. A compacted half-round joint or a weather-struck joint ensures vertical water run-off. If specifications require subsequent pointing, the bedding joints must be raked out cleanly to a minimum depth of 15 mm while the binder is still green. Subsequent filling is carried out with a proprietary pointing mortar, firmly pressed home with a pointing board and iron to prevent debonding.
Laying blocks and continuous bond monitoring
The success of a fair-faced concrete block wall depends on strict geometric discipline right from the starter course. Unlike masonry intended to receive plaster or an insulated lining, every alignment error or variation in bed joint thickness remains immediately noticeable under the raking light of corridors or plant rooms. Execution requires the systematic use of aluminium corner profiles clamped plumb, on which the storey gauge is marked with the exact modular heights, including the bed joint.
Laying is carried out block by block, never tapping a unit once the mortar has begun its initial set. If an alignment correction is needed after several minutes, the block must be lifted, the mortar bed scraped off with a trowel, and replaced with fresh mix. Failure to follow this rule breaks internal adhesion and causes a micro-crack at the interface that absorbs moisture and locally darkens the wall face.
| Geometric element | Adjustment tool | Target visual tolerance | Consequence of a defect |
|---|---|---|---|
| Horizontal alignment | Nylon string line tensioned on metal gauge rods | ± 2 mm over a 2 m straightedge | Wavy bed joints visible under raking light |
| Face plumb | Box-section spirit level with machined base (min. 1 m) | ± 3 mm over the storey height | Lipping at junctions with columns and slabs |
| Perpend overlap | Plumb line or starter course plumb gauge | Exact half-block (± 5 mm centre-line deviation) | Aesthetic imbalance of regular stretcher bond |
| Face alignment | Alu straightedge across 3 consecutive blocks | Less than 1 mm lipping | Cast shadows disrupting wall flatness |
For rebated reveals, wall ends, and openings, manufactured corner and stop-end blocks must be used. Any on-site cutting must be performed with a wet masonry table saw to ensure clean, unspalled edges. Rough cuts with a handheld angle grinder cause burrs and irregular edges that ruin the finished appearance of fair-faced masonry.
Managing daywork joints, adverse weather, and formal handovers
On a building construction site, the immediate surroundings constantly threaten the cleanliness of fair-faced masonry. Rainwater run-off laden with laitance from the pouring of upper slabs represents the most frequent form of damage. Temporary waterproofing beneath the soffit formwork and the installation of plastic flashings to divert run-off water must be planned before the reinforcement of the overlying slab is even fixed.
Work interruptions must be managed by avoiding traditional stepped racking back: building in staggered sections creates differential mortar drying, resulting in distinct shade bands on the finished wall. Courses should be completed along the entire wall length before the end of the shift, and wall tops must be sheeted immediately to prevent fresh joints from being washed out by an unexpected overnight shower.
- End-of-shift stoppageBrush off fresh splashes on the facing, scrape the top bed joint to remove surplus paste, and secure a waterproof tarpaulin over the top edge using formwork clamps.
- Protection against following tradesProtect the base of the wall up to a height of 1 m 50 with rigid hardboard or fluted plastic sheets to guard against impacts from mobile scaffolding and screed splashes.
- Joint inspectionArrange the handover inspection of facing walls with the site management under diffuse natural daylight, pursuant to the rules of the contract for work governed by art. 367 CO.
If reservations are noted during inspection of the work, remedial options are extremely limited on fair-faced blocks. Patching with rapid-setting cement alters surface texture and exacerbates visual contrast in good light. Only careful replacement of the entire unit by coring out the joint, or very gentle and uniform blast cleaning of the whole wall, can rectify a defect without leaving a visible stain.
Remedying visual damage and remedial protocols
In fair-faced concrete block masonry, the absence of protective or decorative render turns the slightest geometric discrepancy or mortar smear into a permanent defect. When the bond reveals anomalies, the site foreman must immediately assess the defect: is it a joint dimension discrepancy, surface pollution, or colour variation? According to standard SIA 118, any dispute raised by the site management requires work on the affected area to cease immediately and the drawing up of a joint inspection record based on the approved benchmark reference panel.
| Observed defect | Cause during execution | Action on the construction site |
|---|---|---|
| Smeared or squashed joints | Tooling too early or overly wet mortar | Immediate dry scraping with a hardwood wedge; gentle dry brushing |
| Mortar colour variation | Change of sand batch or inconsistent mixing | Mechanical raking out to 15 mm and repointing with a half-round jointer |
| Efflorescence and white staining | Lack of tarpaulin on wall head during rain | Low-pressure washing with clean water once fully dry |
| Vertical joint misalignment | Flawed setting out from the first course | Demolition and complete rebuild of the non-compliant section |
For stubborn laitance staining, chemical cleaning with diluted hydrochloric acid remains an absolute last resort. Application requires pre-soaking the masonry with clean water to prevent acid from penetrating deep into the precast concrete, which would permanently dissolve the block binder. Whenever defective work compromises the appearance agreed in the contract for work, CO governs the rights of the client, allowing for rectification, price reduction, or rejection of the work. If defects stem from erroneous instructions imposed by the site management despite recorded reservations, CO discharges the contractor from warranty obligations.
Frequently asked questions
How should hardened mortar snots be removed from a fair-faced wall?
Never strike the snot with a metal tool, as this will spall the precast concrete. Wait until the binder has sufficiently hardened, then rub off the excess using an off-cut of concrete block or a hardwood wedge. Complete the operation by brushing thoroughly with a dry coco-bristle brush. Strictly avoid wire brushes, which leave oxidisable steel particles that create rust stains.
What is the procedure for correcting non-compliant joint colour?
When mortar exhibits patchy coloration due to improper mixing, superficial skim coating is prohibited because it will soon spall off. Remediation requires cutting and raking out the hardened joint to a minimum depth of 15 to 20 millimetres using a diamond disc without touching the block edges. The surface is then cleared of dust, dampened, and manually repointed with a jointer matching the approved reference batch.
At what exact moment should the jointer be run over the mortar?
Tooling is carried out when the mortar reaches the so-called 'thumbprint-hard' or 'semi-firm' consistency. The binder must no longer stick to the steel while still being impressionable under light thumb pressure, with no water bleed. Running the iron too early on green mortar causes messy smears and discolours the face. Tooling too late on dry mortar leads to a crumbling joint and poor bond with the blocks.
How can the head of fair-faced walls be effectively protected at the end of a shift?
Every evening or whenever rain threatens, the last course laid must be covered with a waterproof tarpaulin or heavy protective felt securely weighted down. This covering must overhang both faces of the wall to shed rainwater well clear. The absence of sheeting leads to water ponding in the cores of the concrete blocks, causing insoluble lime efflorescence and permanent shade variations across the facade.
Texts and standards cited
- norme SIA 118General conditions for construction works
- COclient's rights in the event of defects in the work: rejection, price reduction, rectification, damages
- COexclusion of client's rights for defects in the work when defective performance is personally attributable to the client