🧱 CFC 201 / 211.0SUVA safety, health and workstation requirementsChapter 9 of 10 in the section

Noise in masonry: highest-exposure tasks, thresholds and hearing protection selection

The site foreman will learn to identify masonry phases that exceed the occupational noise exposure limit value. They will know how to rate the effective acoustic attenuation of personal protective equipment without isolating plant operators from their acoustic environment, plan rotation on chipping workstations and coordinate call-ups for the mandatory SUVA audiometric test.

Key takeaways

  • Chipping and wall-sawing tasks systematically exceed statutory acoustic action levels.
  • Art. 36 OTConst mandates appropriate protectors as soon as organisational measures remain insufficient.
  • Acoustic overprotection creates a crushing hazard by cutting off the mason from warning signals.
  • Planned worker rotation divides cumulative daily exposure and delays the onset of irreversible damage.

Prioritise sound emissions on the slab and apply art. 36 OTConst

Occupational deafness in structural work does not result from an isolated bang, but from progressive, painless destruction of the hair cells of the inner ear. On a building construction site, the average background noise masks critical sound pressure peaks generated by repetitive manual operations. The site foreman must map the sources to act primarily on workstations where cumulative acoustic energy destroys masons' hearing over several years of activity.

Classification of common masonry operations by acoustic emission intensity
Construction site operationRepresentative equipmentIndicative sound pressure levelTypical exposure regime
Concrete mixer cleaning and skip washoutSledgehammer, hand chisel, high-pressure cleanerHigh, reverberated metal impactsIntermittent at the end of concreting
Wall bush-hammering and pile-head breakoutHeavy breaker, electro-pneumatic chipping hammerCritical, transmitted vibrations and impact noiseContinuous over several hours of the shift
Cutting clay bricks or aerated concrete blocksWet-cutting bench saw, angle grinderVery high, friction and high-frequency screechingRepeated throughout partition wall erection
Internal vibration of reinforced concreteHigh-frequency vibrating pokerModerate to high depending on formwork confinementSequential during pour phases

In accordance with art. 36 OTConst, if the noise exposure level cannot be brought below the limit value through technical or organisational measures, suitable hearing protection must be worn. The obligation begins with the analysis of structure-borne and airborne noise. Art. 22 OLT 3 also recalls that noise and vibration must be combated in the first instance by building measures, on plant or through the isolation of sources, before turning to personal protective equipment.

Rate useful attenuation, organise rotations and manage medical monitoring

Choosing hearing protection equipment is not a matter of seeking the highest possible gross attenuation. Overprotection completely isolates the worker, prevents them from detecting reversing plant, crane warning horns or the chargehand's instructions, and drives the worker to remove their ear defenders or earplugs during intermediate phases. The overall attenuation rating must bring the level perceived at the eardrum into a comfort zone without cutting off verbal communication or safety signals.

  1. Select the appropriate attenuation classFor common masonry operations, give preference to reusable earplugs or helmet-mounted earmuffs providing an overall attenuation between 20 and 28 decibels. This range prevents under-protection while neutralising the internal speech resonance effect.
  2. Organise distance and spatial separationRelocate the wet-cutting bench saw away from reinforcement and formwork panel assembly zones. A mason stationed twenty metres from an angle grinder experiences a considerably reduced sound pressure compared to a worker directly in line with the cutting debris path.
  3. Establish formal worker rotationLimit the duration of continuous chipping with an electro-pneumatic hammer to two hours per worker per working day. Rotate the operator with the shuttering carpenter or reinforcement worker to divide cumulative sound exposure across the entire team.
  4. Incorporate call-ups for audiometric examinationsSUVA's occupational medicine division periodically summons personnel exposed at noisy workstations to its test centres or mobile audiometric buses. Construction site supervision must release the designated workers to detect early audiometric notches before hearing loss becomes irreversible.

Useful attenuation selection and suitability of hearing protection

Over-equipping workers is a common trap on structural work construction sites. For a mason or plant operator, wearing acoustic protection that indiscriminately blocks all frequencies induces a feeling of total isolation. The worker no longer perceives crane warning signals, reversing site dumpers, or verbal instructions from the site foreman, which inevitably leads them to remove their equipment at critical moments. In accordance with art. 36 OTConst, personal protection is only introduced if technical and organisational measures do not reduce the exposure level below the occupational noise exposure limit value.

Hearing protector selection matrix by masonry workstation
Workstation or taskIndicative noise levelRecommended protectionRecommended SNR rating
Heavy chipping with breakerVery high (> 100 dB(A))High-attenuation ear defenders or dual protectionSNR 30 to 35 dB
Masonry cutting with angle grinderHigh (95 to 100 dB(A))Hard-hat-mounted ear defenders or reusable earplugsSNR 26 to 30 dB
Steel formwork and shuttering tie tighteningMedium to high (88 to 95 dB(A))Custom-moulded earplugs with communication filter or ear defendersSNR 20 to 25 dB
Plant operation (open cab)Moderate to medium (85 to 90 dB(A))Flat-attenuation earplugs or banded earplugsSNR 18 to 22 dB

The single number rating (SNR) stated by manufacturers is obtained in laboratory conditions during standardised tests. On the slab, cement dust, the combined wearing of safety glasses, and repetitive jaw movements considerably reduce the actual effectiveness of the acoustic seal. Chargehands must ensure regular adjustment of ear defenders and, for personnel with continuous exposure such as formwork masons, give preference to custom-moulded earplugs fitted with acoustic filters tuned for speech.

Workstation organisation, acoustic decay, and audiometric monitoring

Collective management of acoustic risk relies on crew rotation and compliance with separation distances. By doubling the distance between a cutting machine and the rest of the crew, sound pressure theoretically drops by 6 dB(A), which divides the sound energy experienced by adjacent workers by four. Physically positioning a bench-cutting station or generator away from rebar fixing and formwork assembly zones ensures the majority of workers do not exceed the occupational noise exposure limit value.

  1. Spatial segregation of cutting stationsSet up wet-cutting bench saws, compressors, and hydraulic power packs away from reinforcement assembly and concrete pouring areas, taking advantage of natural barriers such as already-stripped concrete walls.
  2. Scheduling of demolition windowsGroup scabbling, heavy core drilling, and bush-hammering operations into fixed time slots announced to the other trades, in order to limit the presence of unequipped personnel within the impact radius.
  3. Implementation of formalised rotationsAlternate work with the chipping hammer within the same day with lower-exposure tasks, such as setting out, marking, or placing precast floor slabs, to reduce the cumulative daily noise dose.
  4. Call-up for audiometric testingEnsure systematic attendance of exposed workers at preventive occupational medical examinations, particularly via mobile cochlear lesion screening units.

Audiometric testing represents the final technical safety barrier against insidious damage to the inner ear. Occupational deafness develops painlessly: initial sensitivity losses appear at high frequencies (the 4000 Hz notch), without immediately impairing the comprehension of everyday conversation. By the time a worker notices daily hearing difficulty or constant tinnitus, the hair cells of the cochlea are already irreversibly destroyed. Periodic audiometric examination detects these early impairments, alerting the company to unsuitable hearing protection being worn or to a failure of rotation in chipping tasks.

Action to take in the event of an exposure drift or hearing impairment

On a structural work construction site, the identification of excessive exposure stems either from poorly coordinated coactivity (intensive chipping in a confined space) or from a partial fitness restriction issued during an audiometric check. When the acoustic tolerance threshold is crossed or personal protective equipment is rejected by masons due to discomfort or isolation, the site foreman must act without delay to modify the work arrangements.

  1. Immediate stoppage and withdrawalImmediately halt the unplanned noise-emitting operation. If the ambient sound level exceeds the occupational noise exposure limit value without an acoustic screen or possible separation distance, suspend the scabbling or core drilling and have unequipped personnel clear the area.
  2. Review of PPE attenuationCheck the sound reduction index of the ear defenders or earplugs issued. A protector with excessive attenuation isolates the mason, who ends up removing it to communicate or hear crane warning signals; a protector with insufficient attenuation destroys the hair cells of the inner ear.
  3. Spatial reorganisation and rotationModify execution phasing: shift demolition, bush-hammering, and sawing tasks outside the working hours of steelfixers and formwork carpenters. Introduce strict workstation rotation on the vibrating tool to reduce the daily dose received by each worker.
  4. Managing SUVA audiometry follow-upsUpon receiving notification of hearing loss following a check in the SUVA mobile audiometric bus, reassign the affected employee to workstations with low acoustic exposure (traditional formwork, setting out, finishing work) and request the fabrication of custom-moulded earplugs with suitable acoustic filters.

Frequently asked questions

How do you select useful attenuation without creating an accident risk on site?

The selection is based on calculating the effective level at the ear, which should be between 70 and 80 dB(A). Excessive attenuation (exceeding an overall reduction of 85 dB(A)) cuts the worker off from their acoustic environment: they no longer hear the crane warning horn, the reversing alarm of a dumper, or team instructions. Flat-response filters should be favoured to maintain speech intelligibility.

What safe distance must be maintained from a heavy breaker?

In a free field, the sound level theoretically decreases by 6 dB each time the distance from the source doubles. Closer than 10 to 15 metres from a demolition breaker operating on a concrete slab, ambient exposure still exceeds the permissible limit value. All trades working within this perimeter must imperatively wear hearing protection or be evacuated to a sheltered area.

What should be done if a worker refuses to wear hearing protection in hot weather?

Perspiration under hard hat ear defenders is the main cause of non-compliance in summer. The site foreman must provide a compliant alternative: reusable silicone earplugs with a cord, or custom-moulded earplugs fitted with an acoustic filter. Art. 36 OTConst allows no exemptions based on climatic conditions; wearing protection remains mandatory as soon as the limit value is exceeded at the workstation.

How often must masons undergo an audiometric test?

Preventive medical monitoring is conducted by SUVA's occupational medicine division, primarily via its mobile screening units (audiomobiles). Workers exposed to impact noise (breakers, demolition operatives, piling plant operators) are summoned periodically, typically every three to five years, or more frequently if hearing deterioration was detected during a previous check-up.

Texts and standards cited

  • OTConst art. 36noise: if the sound exposure level cannot be brought below the limit value through technical or organisational measures, suitable hearing protection must be worn