Mortars, site concretes and application products: the execution benchmark

Intended for team leaders, site foremen and site managers, this section compiles the execution rules for structural concretes and site mortars. From checking the delivery note according to standard SN EN 206 to compaction with an internal vibrator, including thermal curing and reinforcement dowelling, it details the technical actions that ensure structure durability without encroaching on the engineer's design.

  • 10chapters
  • 22 000words
  • 6sections in the training course
  • 60chapters in total

Key values to remember 5

SN EN 206

XC1 to XC4

Common exposure classes for risk of corrosion induced by carbonation in Switzerland

SIA 262

30 minutes

Maximum recommended time for full discharge of a truck mixer on the construction site

SIA 262

8 to 10 times

Radius of action of a poker vibrator expressed as multiples of its diameter

SN EN 206

+5 °C to +30 °C

Permissible temperature range of fresh concrete during placement

SIA 262

50 %

Minimum characteristic strength required before striking formwork of non-load-bearing walls

Technical scope: material and its application on the construction site

This section deals exclusively with practical operations related to the acceptance, internal transport, compaction, protection and repair of mortars and concretes. Structural design, calculation of reinforcement sections, slab thickness and verification of mechanical stresses fall under the civil engineer's mandate and the skills of the formworker-reinforcing ironworker. The bricklayer and the pouring team intervene on the compliance of the paste, the compactness of the fresh material and adherence to curing processes specified by standards SN EN 206, SIA 262 and SIA 262/1.

Operational boundaries between structural design and execution on the construction site
Field of interventionCivil engineer's responsibilityMasonry team's responsibility
Mix design selectionSpecification of strength classes, exposure classes and Dmax according to SN EN 206Verification of the delivery note and refusal of non-compliant truck mixers
WorkabilityDefinition of the required consistency class on the pouring planSlump test measurement on site and strict prohibition of adding water
CompactnessVerification of concreting feasibility according to reinforcement densityMethodical operation of the poker vibrator and prevention of segregation
DurabilityEstablishment of the curing class and cover criteria according to SIA 262Immediate application of protective measures against desiccation and thermal shock
Post-installed rebarCalculation of anchorage depth and selection of the rebar connection systemDrilling, blow-out cleaning, grout injection and bar insertion

On the construction site, the final quality of a raft foundation or a wall does not depend solely on the theoretical mix from the concrete batching plant. It relies on execution rigour: checking actual consistency before discharge, plunging the poker vibrator at regular intervals without hitting reinforcement layers, protecting fresh concrete against premature evaporation and taking care with construction joints. This technical guide provides concrete benchmarks to avoid delivery rejections, eliminate costly smoothing coats and prevent structural defects.

Reading path: from the truck mixer to surface finishes

The organisation of the ten chapters follows the chronological and logical path of the material on the construction site, from its contractual specification to its full hardening and associated remediation works. This guiding thread allows the site foreman to anticipate every critical stage of supply and pouring.

  1. Phase 1: Acceptance and compliance verificationChapters [M4-01] to [M4-03] detail the correspondence between environmental exposure classes, methodical checking of the delivery note upon unloading and on-site slump testing to validate consistency before pumping.
  2. Phase 2: Placement, compaction and initial protectionChapters [M4-04] to [M4-06] address internal vibration with a poker to eliminate honeycombing, maintaining hydration through suitable curing according to SIA 262 and managing critical pours in hot weather.
  3. Phase 3: Mortars, joints and final checksChapters [M4-07] to [M4-10] govern bedding mortar batches, reprofiling with thixotropic mortar after steel passivation, chemical anchoring of starter bars and validation of striking formwork using compression tests.

Consulting these chapters in order guarantees total control of the concreting chain. Each technical sheet isolates measurable tolerances, practical pitfalls and immediate acceptance criteria to decide with confidence when dealing with truck mixer drivers and the engineer's representatives.

🪣 Chapters in this section 10

Mortars, site-mixed concretes and placement products

Concrete to SN EN 206: select exposure class for the structure

Secure your batching plant orders by matching the right mix design to the actual stresses on the poured element.

Mortars, site-mixed concretes and placement products

Concrete delivery note: what to check before unloading the truck

Detect mix formula errors as soon as the truck arrives to avoid irreversible non-compliant concreting.

Mortars, site-mixed concretes and placement products

Concrete consistency: performing and interpreting the slump test on the construction site

Master on-site slump testing to validate workability without risking segregation.

Mortars, site-mixed concretes and placement products

Concrete vibration: poker operation and gravel pocket prevention

Coordinate insertion and withdrawal of the poker vibrator to eliminate voids without causing paste segregation.

Mortars, site-mixed concretes and placement products

Concrete curing: protection duration, methods and consequences of desiccation

Protect the surface of green concrete to stop crazing and ensure the impermeability of the first centimetres.

Mortars, site-mixed concretes and placement products

Concreting in hot weather: fresh concrete temperature, retarder and pour organisation

Adjust your pouring time slots and mix proportions to place concrete in hot weather without cracking risk.

Mortars, site-mixed concretes and placement products

Masonry mortar: strength classes, batching and admixtures on site

Select the correct binder content and admixture to guarantee bond and strength of bedding joints.

Mortars, site-mixed concretes and placement products

Thixotropic repair mortar: stripping, rebar passivation and reprofiling

Ensure the durability of a structural repair by treating corroded rebars before compacting the repair mortar.

Mortars, site-mixed concretes and placement products

Grouting a Rebar into Concrete: Injection Mortar, Drilling and Application

Apply the strict protocol of brushing and dust removal to ensure reliable mechanical performance of anchor bars.

Mortars, site-mixed concretes and placement products

Striking time: target strength and control test specimens

Verify the actual strength of site specimens to strike formwork without deformation or structural defects.