🧱 CFC 201 / 211.0SUVA safety, health and workstation requirementsChapter 1 of 10 in the section

Respirable crystalline silica in masonry: limit value and source extraction

On masonry construction sites, cutting and drilling concrete or stone generates fine, invisible, but highly harmful dust. This chapter sets out Swiss regulatory requirements, tool-triggered on-tool extraction methods, and the choice of personal protective equipment essential for protecting teams' health during high-quartz emission work.

Key takeaways

  • Respirable crystalline silica causes irreversible and severely disabling long-term lung damage.
  • Dry cutting and surface grinding of concrete are among the highest-exposure operations.
  • Tool-triggered extraction with a Class M dust extractor is mandatory for on-tool collection.
  • FFP3 respirators or powered air-purifying systems complete the measures in the event of residual dust.

Pulmonary risk and high quartz emission operations

In masonry and reinforced concrete work, disc cutting, chasing, scabbling, and grinding release very large quantities of crystalline silica dust (quartz). These extremely fine particles remain suspended in the air and penetrate down to the pulmonary alveoli. Repeated exposure without protection causes silicosis, an incurable occupational illness resulting in progressive fibrosis of lung tissue, as well as an increased risk of lung cancer.

The danger lies in the invisible nature of the finest fractions. Even if a visible dust cloud appears to have cleared, the concentration of respirable particles can remain far above the workplace exposure limit values set by Suva. Risk assessment must therefore be planned right from site preparation, in accordance with the general duty to adapt safety measures to the state of the art.

Respirable crystalline silica (RCS)
Fraction of quartz dust with an aerodynamic diameter under 5 micrometres, capable of reaching the pulmonary alveoli directly when inhaled.

Tool-triggered extraction devices, wet suppression, and suitable respirators

To ensure the health and safety of bricklayers at the workplace, art. 33 OTConst requires air quality to be maintained by capturing and filtering hazardous substances. The priority technical measure consists of fitting power tools (wall chasers, angle grinders, rotary hammers) with an airtight dust hood connected directly to a Class M industrial dust extractor with automatic filter cleaning. The tool-triggered extraction starts simultaneously with the tool to prevent any initial release.

Wet cutting constitutes the technical alternative of choice when dust extraction cannot be implemented. A continuous water feed to the cutting disc or core drill bit binds fine particles into a slurry, preventing them from becoming airborne. This method requires slurry management and pumping to keep accessways clean and slip-resistant.

In accordance with art. 33 OTConst al. 5, if technical extraction or wet suppression measures alone do not keep concentrations below permitted thresholds, wearing suitable respiratory protective equipment is mandatory. A minimum of an FFP3 valved filtering half-mask is used, or a powered air-purifying respirator during prolonged work in confined spaces.

  1. Connecting the equipmentFit the wrap-around shroud to the grinder or wall chaser and lock the hose onto the Class M dust extractor.
  2. Checking the filter and auto-startCheck the effectiveness of the automatic filter cleaning and test the power take-off socket when starting the motor.
  3. Adjusting personal protectionPut on the FFP3 respirator and carry out a face-fit check (positive/negative pressure test).
  4. End-of-shift maintenanceEmpty the sealed collection bags and clean dust hoods without using compressed air blowing.

On-tool extraction and wet suppression protocols on the construction site

In structural work and special civil engineering, cutting concrete, chasing masonry, and bush-hammering release massive concentrations of respirable crystalline silica. Dry sweeping and blowing with compressed air are strictly prohibited, as they keep this fine dust suspended in the bricklayers' breathing zone.

For anchor dowelling or drilling with a rotary hammer, hollow drill bits connected to an industrial dust extractor must be used. For cutting bricks or concrete walls, wet cutting is preferred whenever a water supply is feasible. Water binds fine particles as soon as they form and prevents them from dispersing.

Technical dust suppression methods by masonry operation type
Masonry operationRecommended technical equipmentCapture / filtration specification
Cutting bricks / concrete blocks with an angle grinderWrap-around dust extraction shroud or wet sawClass M dust extractor with automatic filter cleaning
Drilling anchors and chemical dowelsHollow extraction drill bitDirect extraction through the tool
Grinding and surfacing concrete wallsConcrete grinder with sealing skirtTool-triggered extraction system
Cleaning work areasIndustrial construction site vacuum cleanerAbsolute ban on dry sweeping

Selecting respirators and monitoring exposure

When on-tool extraction or wet working cannot completely reduce the respiratory risk during high-emission operations, wearing personal protective equipment becomes mandatory. Standard disposable half-masks are insufficient for prolonged cutting or breaking work.

Tool-triggered Class M extraction
Industrial extraction unit fitted with an airflow monitoring system and filters retaining at least 99.9% of dust with an occupational exposure limit value, starting automatically as soon as the power tool is switched on.

Site foremen and team leaders must check the fit of respirators on bricklayers' faces. Facial hair impairs the seal of facepieces and negates the effectiveness of the filtration system. For long-duration tasks in confined spaces, powered air-purifying respirators ensure superior protection while reducing breathing resistance.

  1. Pre-work checkCheck the connection of the extraction hose to the machine hood and ensure the electric or pneumatic tool-trigger function of the dust extractor is working.
  2. Inspecting the filtration systemCheck that the collection bag is clean and that the automatic cleaning of the Class M main filter operates properly.
  3. Adjusting the respiratorPut on a half-mask with a P3 filter or an FFP3 respirator, and perform a positive and negative pressure fit check.
  4. Maintenance and cleaningEmpty collection bins without generating dust, clean reusable respirators after every shift, and store equipment protected from contamination.

Equipment failure and managing quartz threshold exceedances

On the masonry construction site, residual crystalline silica is an invisible risk whose cumulative exposure causes irreversible damage to the health of bricklayers and operators. When a failure occurs on the tool-triggered extraction system or cutting work must be carried out in a poorly ventilated room, the site foreman must intervene immediately to halt fine dust emissions.

Art. 33 OTConst requires constant monitoring of air quality at the workplace and the evacuation or filtration of hazardous substances. If technical source-capture measures prove insufficient or fail, the use of appropriate respiratory protective masks becomes mandatory to safeguard personnel health.

  1. Isolating the work area and immediate stoppageStop the power tool (wall chaser, grinder, breaker) as soon as a visible dust cloud is noticed or if the tool-triggered dust extractor stops.
  2. Ventilation and cleaning without dry sweepingVentilate the work area using mechanical ventilation or air extraction. Using a dry broom or a compressed air blower to clean floors or clothing is strictly prohibited, as this resuspends quartz particles. Only a Class M dust extractor or damp wiping is permitted.
  3. Checking PPE and monitoring exposureProvide FFP3 respirators or powered air-purifying respirators equipped with P3 filters to exposed workers. Art. 82 LAA sets out the employer's obligation to implement required preventive measures and the workers' duty to use the protective equipment placed at their disposal.

Frequently asked questions

Can wet cutting be replaced by a simple FFP2 mask when cutting bricks?

No. An FFP2 mask does not provide sufficient protection during intensive dry cutting that generates crystalline silica. Under the construction work ordinance, the absolute priority is to eliminate or capture the risk at source via a water supply or tool-triggered extraction. FFP3 personal respiratory protection supplements technical measures or temporarily replaces them only if source capture is technically impossible.

What should be done if a Class M dust extractor clogs constantly during wall chasing?

Rapid clogging indicates the absence of an integrated automatic filter cleaning system or the use of filter bags unsuited to the volume of fine mineral dust. Work must be stopped immediately, an extractor equipped with automatic pulsed-air filter cleaning must be used, and the condition of the absolute filter checked. Using saturated equipment directly exposes the bricklayer to exceeding SUVA quartz dust exposure limit values.

How can work clothes stained with silica dust be cleaned safely?

Shaking out or dusting clothes with compressed air on the construction site is strictly prohibited, as this action directly resuspends fine quartz particles into the breathing zone. Masonry workwear must be vacuumed directly on the operative using a tool-triggered vacuum with a suitable brush attachment, then washed regularly. Teams must have access to a separate changing room.

Who is responsible for maintaining extraction equipment on the construction site?

The team leader and the site manager ensure the proper maintenance of the equipment provided. Under art. 82 LAA, the employer takes all necessary measures to protect the health of their employees, which includes supplying tools fitted with functional dust shrouds. For their part, bricklayers and workers are obliged to use these protective devices correctly and to report any malfunction.

Texts and standards cited

  • OTConst art. 33Requirements regarding air quality, evacuation of hazardous substances, and wearing respiratory protective equipment
  • LAA art. 82General rules for the prevention of occupational accidents and diseases imposed on the employer and duty of cooperation for the worker