Skip to content
Website
🧱 CFC 250Cold water, hot water and recirculation distributionChapter 9 of 10 in the section

The cylinder: connection, safety group, discharge and anode

This chapter details the installation rules for the cold-water-side connection of a domestic water heater. You will know how to size and position the safety group, connect its tundish to a visible air gap, route drain-offs to the drainage system without risk of backflow, and plan maintenance of the sacrificial anode against corrosion.

Key takeaways

  • The relief valve discharge requires a visible air gap so that any continuous flow can be detected.
  • The safety group discharge requires a dedicated trap connected to the wastewater system.
  • The drain valve must remain accessible at the lowest point to allow maintenance of the water heater.
  • Periodic checking of the magnesium anode ensures the longevity of the enamelled steel tank.

Fit the safety group with an air gap and a visible discharge

The hydraulic connection of a water heater starts on the cold water inlet with specific components: a main stop valve, a non-return valve preventing expanded hot water from flowing back into the drinking water network, a drain valve and a relief valve usually set at six bar. Together these form the safety group. It is installed as close as possible to the inlet connection of the cylinder, with no isolating device between the relief valve and the tank. During heating, the domestic water expands; the relief valve opens to release the excess pressure as a drip.

To make every fault immediately detectable by the operator or during the maintenance visit, the relief valve discharge must fall into a tundish open to the air. This standardised air gap prevents any physical contact between the drinking water in the cylinder and the drainage system, thus eliminating the danger of contaminated water being drawn back in the event of negative pressure in the public network, in accordance with the rules of the Swiss Association for Gas and Water (SSIGE).

Mandatory components on the cold water supply of the water heater
ComponentTechnical functionInstallation rule in the boiler room or plant room
Stop valveIsolating the cylinder for workAccessible without tools, quarter-turn lever or handwheel
Non-return valveProtection of the drinking water networkFitted upstream of the relief valve, with a test point
Safety relief valveLimiting the pressure to six barNo stop valve between the relief valve and the cylinder
Discharge tundishAir break and visibilityVertical, visible air gap, not obstructed

Connect the trap and drain, and check the anode protection

The collecting tundish must be connected to the drainage pipe by an individual, independent trap. This trap retains enough water seal to block drain gases from rising into the plant room. The discharge pipe, made of polyethylene or polypropylene resistant to high temperatures, must have a continuous fall towards the soil stack or the collector. Where the discharge passes through an unheated room, the risk of the standing water in the trap freezing requires careful attention to the routing.

  1. Positioning of the drain valveFit a dedicated drain valve on the lowest connection of the cold water pipework. This valve must have a threaded nozzle to receive a quick coupling or a hose that can be directed to a floor drain.
  2. Connection to the trapFix the tundish under the relief valve with an air gap of at least twenty millimetres. Connect the tundish outlet to the trap using a short run to make unblocking easier.
  3. Anode accessibility checkBefore fixing the cylinder in place, make sure that the free vertical space above the tank allows the magnesium sacrificial anode to be removed without having to remove the whole appliance.
  4. Measuring the protection currentFor magnesium anodes with an external earth cable or for impressed-current anodes, measure the current with a multimeter in accordance with the manufacturer's recommendations before filling with water.

In contractual terms under the Code of Obligations (CO), the plumbing contractor is liable for the correct execution of the joints and the appropriate choice of connection parts. Rigid fixing of the pipework upstream and downstream of the safety group limits the vibrations transmitted when mixer taps are closed abruptly. If the mains pressure exceeds five bar, fitting a general pressure reducing valve upstream of the water heater prevents the relief valve from operating unnecessarily outside the heating cycles.

Visible discharge and drainage pipe: eliminating the risk of concealed flow

Connecting a safety group tolerates no improvised arrangement leading to a crawl space or a blind service duct. A relief valve that opens slightly under the effect of thermal expansion or a piece of debris stuck on its seat releases water continuously without making any perceptible noise. If this trickle of water runs directly under the slab or into a ventilated void that cannot be walked through, the damage only appears after months, in the form of ground subsidence, deterioration of insulation or an exorbitant water bill. The fundamental principle set by the SSIGE guidelines and the recognised rules of sanitary engineering requires that every drinking water discharge present an air break that is visually accessible as soon as one enters the plant room.

The discharge tundish is the sanitary safety interface: it prevents any return of contaminated water by negative pressure into the drinking water distribution network. This tundish must be rigidly fixed under the relief valve, with a free air gap of between 20 and 40 mm. Pushing a flexible hose or a corrugated sleeve directly into the discharge pipe without an atmospheric break is prohibited. Downstream of the tundish, the discharge pipe must be made of a rigid material insensitive to continuous hot water, such as high-density polyethylene or acoustically insulated polypropylene drainage pipe. The run descends with a constant minimum fall to a dedicated trap with a water seal of at least 50 mm.

Execution requirements for the discharge and drainage line of a domestic hot water cylinder
ComponentCompliant installationCommon non-conformity on site
Air breakOpen tundish with a visible 20 mm air gap under the relief valveFlexible hose connected directly and watertight to the drain without an air break
Discharge pipeRigid HDPE or cast iron pipe with a minimum fall of 1 per centFlexible corrugated tube with pockets of standing water
Trap water sealRemovable trap of at least 50 mm with an accessible rodding plugDirect connection without a trap onto a soil stack
Visibility of the discharge pointPositioned on the front or side, lit, visible when the operator passesDischarge routed behind the cylinder insulation or into an unmonitored floor hatch

Positioning of the low drain and preventive maintenance of the cathodic protection

Managing the water held in the domestic water cylinder requires two distinct components that are often confused: the pressure relief valve of the safety group and the full drain valve of the tank. The latter must absolutely be located at the lowest point of the tank, upstream of the group's non-return valve, so that sludge, sand and limescale that have accumulated can be purged completely without drawing the deposits through the group itself. The drain valve must have a threaded connection for a large-diameter hose nozzle, protected by a screwed metal cap to guard against wrong operation or slow leaks from the gland.

  1. Marking and accessibility of the valvePosition the drain valve with a frontal clearance of at least 300 mm from any technical element or masonry, allowing a site drain hose to be connected easily for the full purge.
  2. Checking the magnesium sacrificial anodeIsolate the cylinder, open the drain to relieve the pressure, remove the upper plug or the inspection flange and measure the diameter of the magnesium rod with a calliper. If the wear exceeds 60 per cent of the original mass, replace the anode immediately.
  3. Checking an electronic impressed-current anodeCheck the operating indicator on the control unit or measure the protection potential with a multimeter between the connection plug of the titanium anode and the metal body of the enamelled tank.
  4. Flushing and refilling under pressureClose the drain valve with its sealing cap, open the cold water supply and then the hot water draw-off points to purge the air from the tank before switching the heat source back on.

A cylinder whose anode is not monitored sees its service life divided by three in the presence of corrosive or softened water. Visual accessibility of the anode head on the top or front of the tank is a non-negotiable installation criterion from the moment the installation diagram for the plant room is drawn up.

Handling damage and remedying discharge non-conformities

Discovering a safety group spitting water blindly into a crawl space, or a discharge tundish overflowing, calls for a methodical response. The plumbing installer shuts off the general cold water supply to the water heater, locks off the upstream stop valve and operates the relief valve to check whether the mechanism is blocked by limescale deposits. If water has been flowing unseen for weeks, the foreman records the situation in writing and alerts the site management.

  • Check the static pressure of the cold water network using a test pressure gauge mounted on the drain connection; a pressure above 5 bar requires the fitting or overhaul of a pressure reducing valve.
  • Inspect the air gap: the standard distance between the relief valve nozzle and the receiving tundish must be at least 20 millimetres to prevent any backflow of faecal pollution or wastewater.
  • Check the water seal of the trap dedicated to the cylinder; a trap dried out through lack of maintenance lets drain odours through and promotes surface corrosion of the metal components.
  • Replace the relief valve cartridge or the entire safety group immediately if the built-in non-return valve no longer guarantees tightness on the upstream side.

When a magnesium sacrificial anode reaches the end of its life with a residual diameter of less than 10 millimetres, the steel of the enamelled tank begins to suffer galvanic attack. It must be possible to drain the cylinder completely without an improvised connection: the low drain valve must have a gas-pitch thread that is accessible, with a clear passage for a reinforced hose. Any faulty connection to a crawl space must be removed and extended by a rigid polyethylene or polypropylene pipe with a trap, directed to a gravity drain compliant with the Swiss drinking water supply guidelines.

Frequently asked questions

Why is a direct, watertight connection of the safety discharge prohibited?

A direct connection without an air gap prevents any visual check for leaks and exposes the installation to a risk of drinking water contamination. According to the SSIGE guidelines, the discharge must have an air break of at least 20 millimetres above the tundish. This air gap eliminates the risk of contaminated water being drawn back into the network in the event of negative pressure and immediately signals a leaking valve.

How do you check the wear condition of a magnesium protection anode?

On a standard anode, the check requires depressurising the cylinder, unscrewing the anode plug and measuring its diameter; if the wear exceeds 60% of the initial mass, replacement is necessary. With a titanium impressed-current anode, the check is done simply by looking at the indicator light on the electronic control unit, ensuring continuous protection without dismantling the body of the water heater.

What should be done when the group's relief valve drips continuously outside the heating period?

A permanent flow indicates either debris stuck on the valve seat or excessive mains pressure exceeding the setting of the relief valve, generally calibrated at 6 bar. The manual purge knob should be operated to flush out limescale debris. If the seepage persists, the upstream pressure must be measured; fitting a pressure reducing valve or replacing the group then becomes essential.

Where should the drain valve be positioned to ensure proper sanitary maintenance?

The drain valve must be located at the lowest point of the tank, directly upstream of the non-return valve of the safety group. Its position must provide a clearance of at least 30 centimetres in front of the threaded connection to screw on a hose barb or a discharge hose. An inaccessible valve prevents the flushing of sludge and complicates the future replacement of the heating elements.

Texts and standards cited

  • Directive SSIGE W3Guidelines for drinking water installations: safety principles, protection against backflow and air gap on safety discharges.
  • Norme SIA 118General conditions for the execution of construction work: handling defects in the works, formal notices and rectification.

In the same section