🧱 CFC 250Water hygiene: legionella, temperatures and stagnationChapter 9 of 10 in the section

Designing against stagnation: series loop, most-used fixture at the end

This chapter presents layout methods for eliminating stagnant water in internal drinking-water systems. You will learn how to structure a floor distribution in series, how to position the most heavily used draw-off point at the end of the pipe run, and how to calculate the contained volumes in order to meet the requirements of SIA 385/1.

Key takeaways

  • Placing the WC pan at the end of the line ensures complete renewal of the sanitary branch.
  • Series connection permanently eliminates the dead legs caused by conventional tee branches.
  • SIA 385/1 prescribes rigorous sizing that limits the volume of standing water.
  • The closed floor loop supplies the fixtures from both sides while reducing pressure losses.

Position the most heavily used fixture at the end of the run

The traditional design of a sanitary distribution system often relies on a manifold feeding individual tee branches. This geometry inevitably creates stagnant sections as soon as a fixture remains unused for several days, promoting bacterial growth and impairing the taste of the water. To guarantee impeccable quality without resorting to automated flushing systems that are costly to maintain, the sanitary installer applies a simple layout rule: place the most regularly used draw-off fixture at the very end of the distribution line.

In a flat or an office complex, the WC pan is the fixture with the highest and most predictable rate of use on the cold-water network. Each flush draws between six and nine litres of water through all the upstream pipework. By installing the cistern as the last draw-off point of a through-flow common pipe, the entire horizontal run is flushed several times a day. The stagnant water that has built up in the intermediate sections is thus discharged into the drainage system without wasting energy.

On the domestic hot-water network, the terminal flushing fixture is generally the main washbasin or the kitchen sink, depending on the layout of the wet rooms. SIA 385/1 governs the maintained temperature and requires rapid thermal availability to prevent the growth of legionella. When mixed or hot water is drawn at the end of the line, the residual lukewarm water in the pipework is immediately replaced by water from the circulation loop or from the insulated riser.

  • Define the installation order: start the branch with the occasional-use fixtures such as the bidet, the slop sink or the washing machine.
  • Continue the run with fixtures used daily but intermittently, such as the bath or the shower.
  • Always finish the distribution with the guaranteed-use fixture: the WC cistern for cold water or the washbasin for hot water.

Implement series connection and control the stagnant volume

Through-flow series connection
Distribution method in which the supply pipe passes through the connection of a first sanitary fixture via a double connection box (U-shaped box) before continuing to the next fixture, eliminating dead-end waiting sections.

Series connection relies on the use of double wall elbows or through-flow flush-mounted boxes. The fluid flows directly through the connection piece of the mixer without creating a dead branch. Unlike the traditional tee branch, where the water in the secondary section stagnates when the tap is closed, the through-flow piece ensures complete renewal of the internal volume with every draw-off made further along the line.

Hot-water distribution systems must be sized so as to minimise the volumes of stagnant water in branch pipes that are not connected to the circulation.

Norme SIA 385/1

Compliance with SIA 385/1 requires the hydraulic capacity of individual non-looped connection pipes to be kept to the strict minimum, with a common reference value set at a maximum of three litres of water between the circulation and the draw-off point. The sanitary installer must favour reduced nominal diameters in multilayer or stainless-steel pipe, while checking the flow velocity and the residual pressures required at the terminals.

Indicative volume capacity according to the internal diameter of distribution pipes
External diameter (mm)Internal diameter (mm)Volume per linear metre (l/m)Maximum length for 3 litres (m)
16120,11326,5
20150,17716,9
26200,3149,5
32260,5315,6

As an advanced variant of the series layout, the floor loop closed on itself connects the flow and return of the branch to the distribution pipe. This ring system ensures that each opening of a tap causes a two-way flow of fresh water through two separate paths. This arrangement preserves the microbiological quality of the water even when the wet room is partly unoccupied.

Volume capacity of branches and layout criteria according to SIA 385/1

To eliminate any risk of bacterial growth without depending on manual maintenance operations, the pipework layout must rule out dead zones. The SSIGE directive W3 and SIA 385/1 strictly govern the volume of water contained in the distribution sections located outside the circulation loop. In terminal distribution of both domestic hot water and cold water, the basic rule requires the hydraulic capacity of pipes that are not kept at temperature or flushed daily to be restricted to the strict minimum.

Calculating the volume of stagnant water per branch directly determines the choice of internal diameters and the installation method. Installers favour series connection of the fixtures instead of the traditional manifolds with individual outlets. In a conventional star distribution, each pipe supplying a washbasin, a bidet or a garden tap is a hydraulic dead end in which the water stays at room temperature between widely spaced uses. With a main pipe running from one fixture to the next by means of through-flow connection elbows, putting the water point at the end into service immediately renews all the fluid present in the upstream pipe.

Volume capacity of multilayer pipes and maximum installation lengths to comply with the limits on stagnant water volume.
External diameter x thickness (mm)Useful internal diameter (mm)Volume per linear metre (l/m)Equivalent length for 1.0 litre (m)Equivalent length for 3.0 litres (m)
16 x 2,012,00,1138,8526,55
20 x 2,016,00,2014,9814,93
26 x 3,020,00,3143,189,55
32 x 3,026,00,5311,885,65

Series connection and integration of a terminal flushing fixture

Designing a distribution system without stagnation relies on a rigorous spatial logic: identify the sanitary fixture with the highest daily frequency of use and always install it at the end of the hydraulic chain. In a rented flat or a villa, the WC pan is the ideal flushing point for cold water, because its cistern refills several times a day, drawing between six and nine litres at a sustained flow rate. For the domestic hot-water network, the main washbasin or the shower fulfils this function of mechanically carrying away stagnant volumes.

  1. Direct tee-off from the riserBranch the floor pipe from the riser or the insulated circulation loop without inserting a collective distribution manifold with multiple isolating valves, which create dead-water zones.
  2. Series run to the secondary fixturesSupply the bath, the shower and then the secondary washbasins in succession, using through-flow wall connection boxes fitted with double U-shaped connectors or crimped through-flow tees.
  3. Ending at the priority consumerEnd the cold-water run at the flush-mounted box of the WC cistern, ensuring that each use of the WC flushes the entire bathroom distribution.
  4. Installation of an automated flushing unit for sensitive networksIn administrative buildings, schools or holiday homes subject to prolonged closure periods, connect a timed flushing unit discharging to the drain at the end of the line.

On the construction site, implementation demands great rigour when assembling the through-flow flush-mounted boxes. Unlike a conventional installation in which the tee fittings are embedded in the floor screed, series connection brings the pipe up to the wall-mounted box before it continues to the next consumer. This arrangement eliminates any concealed fitting and ensures that every centimetre of pipe is subject to water circulation. The inlet and outlet fittings on each box must keep a smooth flow cross-section to avoid cumulative pressure losses that would reduce the dynamic pressure available at the last fixture.

Site trade-offs and layout corrections following distribution errors

On the construction site, spatial coordination conflicts in service shafts and suspended ceilings sometimes lead to changes in the planned pipe routing without prior consultation. If a layout deviation places an occasional-use fixture, such as a guest bath or a draw-off tap for a washing machine, at the end of a run instead of the WC pan originally planned, the systematic hydraulic flushing effect is lost. This installation error turns a distribution designed for hygiene into a succession of dead legs conducive to bacterial growth.

As soon as such a deviation is noticed before the screeds are poured, the sanitary team leader must refuse the makeshift adaptation and correct the route. Series connection of the fixtures requires the use of through-flow wall connection boxes with double outlets. The supply flow must pass in succession through the washbasin, the shower or the bath and end at the flushing cistern. If the geometry of the premises makes it impossible to reach the WC as the end point, installing a closed ring loop returning the pipe to the distribution riser is the immediate technical alternative.

  1. Survey of actual volumesCalculate the gross volume capacity of the installed pipework, from the start of the shaft to the last wall connection, and compare this volume with the hygiene requirements of SIA 385/1.
  2. Modification of the distribution boxesReplace the tees embedded under the screed with watertight through-flow wall elbows to ensure that each downstream draw-off passes through the body of the preceding fitting.
  3. Integration of a flushing moduleIf the end point remains without circulation because of insufficient frequent draw-off, connect a timed automatic flushing device concealed in the WC support frame.

When the work is already tiled and the measurements reveal abnormal stagnation, the correction is made by installing electronic sanitary taps programmed to drain the line automatically after a predefined period of inactivity. The self-inspection sheet and the corrected installation diagram must be passed to site management to certify the compliance of the delivered installation.

Frequently asked questions

How should you react if the WC is too far away to serve as the terminal flushing fixture?

If the distance requires an excessive run that increases pressure losses, loop the distribution in a closed ring on the riser or install a terminal electronic draw-off tap programmed for regular automatic flushing. This flushes out the stagnant water without having to run an unnecessarily long pipe through the entire wet room.

How do you check the volume of stagnant water in a branch before the screed is laid?

Measure the actual linear length installed between the riser and the last through-flow connection box. Multiply this length by the internal cross-section of the pipe according to the chosen nominal diameter. The total water capacity must not exceed the maximum permissible volume prescribed by SIA 385/1, in order to avoid any harmful stagnation.

What is the technical difference between a conventional tee and a through-flow connection box?

A traditional tee creates a lateral branch in which the water stays still as long as the fixture connected to that tee is not opened. The through-flow box forces the water to pass directly through its metal body to supply the downstream section, which eliminates dead ends and allows the terminal water point to flush all the fixtures located upstream.

Can mixed water and cold water be distributed with the same series layout?

Yes, but the principle of flushing via the WC applies directly only to domestic cold water. For the hot or mixed water network, the most commonly used fixture, generally the main washbasin or the sink, must be the end point of the series loop in order to ensure rapid discharge of the cooled volumes without wasting water.

Texts and standards cited

  • norme SIA 385/1Domestic hot-water installations in buildings - Calculation bases and hygiene requirements