Key takeaways
- Cold domestic water must never exceed twenty-five degrees, in order to halt bacterial growth.
- Direct contact between hot and cold pipes in a shaft creates an incubator for Legionella.
- Cold-water insulation requires closed-cell sleeves with sealed glued joints.
- Physical separation in floor penetrations avoids thermal bridges and destructive condensation.
Thermal proximity in the service shaft and the bacteriological hazard
On construction sites for multi-family housing and office buildings, the space allocated to vertical service shafts is often reduced to the strict minimum. The plumber is frequently forced to install the cold-water riser only a few centimetres from the domestic hot-water distribution and its permanent circulation loop. When the pipes are installed without a clearance distance or with only rudimentary insulation, the service shaft quickly turns into a closed oven. The stagnant air there easily reaches temperatures of thirty to forty degrees.
A cold-water pipe that is uninsulated or insufficiently protected absorbs this ambient heat during overnight stagnation or periods of low draw-off. The drinking water then stagnates in a critical temperature range, between twenty-five and forty-five degrees, which is the optimum growth zone for Legionella (Legionella pneumophila) and other pathogenic micro-organisms. This warming degrades the potability of the water and directly exposes users to a severe health risk when using showers.
The installation must be designed and built so that the cold water does not exceed 25 °C at the draw-off point, including after a prolonged period of non-use.
Norme SIA 385/1
To meet the requirement of SIA 385/1, installing the cold water requires a rigorous layout strategy in the shafts. The cold water must systematically run in the coolest part of the shaft, generally at the lowest level in horizontal runs, or along massive unheated walls. Direct crossing in contact, and clamping a cold pipe together with a hot-water or circulation pipe under the same fixing clamp, must be strictly avoided. A clear distance of at least fifty millimetres between the insulation shells must be maintained to prevent any direct radiant transfer.
Surface condensation and installation of vapour-barrier insulation
Besides bacteriological warming, missing or defective insulation on a cold-water pipe causes continuous surface condensation. When the surface temperature of the pipe falls below the dew-point temperature of the ambient air, the moisture contained in the shaft condenses into droplets. This condensation water runs along the pipes, soaks the slab penetrations, corrodes steel fixing clamps and damages the adjacent plasterboard linings.
To stop this physical phenomenon, the insulation intended for cold water must fulfil two functions: limit heat gain and form a continuous vapour barrier. Open-fibre insulation that is not sealed is totally unsuitable for this use, because water vapour migrates towards the cold wall of the metal or multilayer pipe, saturates the insulation with water and destroys its thermal performance. Only closed-cell extruded elastomeric foams or polyethylene sleeves with a sealed external vapour barrier are specified.
| Installation configuration | Main objective | Insulation thickness (λ = 0.036 W/mK) | Recommended material |
|---|---|---|---|
| Service shaft with DHW and circulation loop | Anti-warming and anti-condensation | 20 to 30 mm | Closed-cell elastomer |
| Basement or unheated service void | Surface anti-condensation | 13 to 19 mm | Elastomeric foam or sealed PE |
| Embedded in screed or chase | Thermal and acoustic protection | 9 to 13 mm | Closed PE sheath with vapour barrier |
| Heated damp room (laundry) | Severe anti-condensation | 19 to 25 mm | Elastomer glued continuously |
- Fitting the sleevesMeasure and cut the insulation sleeve to the exact length without stretching the material, to avoid any longitudinal shrinkage due to ageing.
- Gluing the longitudinal lipsApply the special elastomer contact adhesive to both cut faces, allow it to tack for a few moments, then press the edges together firmly to weld the seam.
- Sealing of fittings and jointsGlue the sleeve ends to each other and systematically cover each joint with a compatible vapour-barrier adhesive tape to ensure absolute continuity.
- Insulation of hangersFit specific clamps with integrated rigid polyurethane shells so as not to crush the insulation at the fixing point on the structural work.
The plumber's responsibility covers the durability of the work and compliance with the recognised rules of the trade. The Code of Obligations states in art. 364 CO that the contractor's liability is subject to the same rules as that of the employee in an employment relationship. Careless execution leading to debonded insulation joints inevitably causes hidden damage through running condensation water, with mould appearing behind access hatches long after the acceptance of the work.
Geometric separation and temperature maintenance per SIA 385/1
The coexistence of networks in service shafts is the critical point of sanitary distribution in residential or office buildings. When the circulation loop and the domestic hot-water distribution radiate continuously in a closed, unventilated space, the ambient air in the shaft commonly exceeds 30 °C. A cold domestic water pipe installed without spatial precautions absorbs this thermal load by convection and radiation. The water stagnates between draw-offs, crosses the critical threshold for microbiological growth and exposes the network to the risk of Legionella proliferation.
To meet the hygiene requirements of SIA 385/1 and the SSIGE guidelines, the cold-water temperature must under no circumstances exceed 25 °C at the draw-off point, the operating target ideally being below 20 °C. This target imposes a strict layout rule: in horizontal runs in basements or false ceilings, the cold-water pipe is always installed at the lower level relative to the hot-water and circulation pipes, since hot air rises by natural convection. In vertical risers, a clear distance of at least 100 mm between the finished insulation of the hot and cold pipes must be observed to limit direct radiant transfer.
Horizontal compartmentation of service shafts where they pass through concrete slabs plays a decisive role. Fire-stopping and acoustic sealing of the slab penetration prevents the thermal stack effect that carries overheated air from the lower levels to the upper floors. This sealing must be made airtight while preserving the physical integrity of the insulation sleeves, without crushing them at the clamping point of the mortar or of the resin-bonded rock-wool board.
Insulation thicknesses by use and absolute resistance to vapour diffusion
Insulating a cold network follows the opposite physics to that of a hot network: the partial water-vapour pressure of the ambient air pushes moisture towards the cold surface of the metal or multilayer pipe. If the insulation is permeable or has an unglued slit, the vapour migrates, reaches its dew point on contact with the cold wall and condenses. The liquid water accumulates in the shaft, soaks the insulation, which loses all thermal performance, corrodes the steel clamps and generates mould along the floor penetrations.
| Pipe use | Recommended insulation material | Minimum thickness | Vapour-barrier behaviour |
|---|---|---|---|
| Cold domestic water distribution (CDW) | Closed-cell synthetic elastomeric foam | 13 to 19 mm (depending on DN and ambient conditions) | High diffusion resistance (full barrier) |
| Domestic hot water (DHW) 60 °C | Mineral wool with reinforced aluminium foil or PIR | 100% of the outside diameter (per cantonal standards) | Not required for vapour, mechanical protection required |
| DHW circulation loop in permanent circulation | Aluminium-faced mineral wool shells or rigid PIR foam | Equal to or greater than DHW (loss limitation) | Outer facing resistant to impacts and tearing |
| Interior rainwater / wastewater drainage | Glued elastomer sleeves or sealed sound-insulating felts | 13 to 25 mm depending on noise and condensate risk | Mandatory against condensation from meltwater or rainwater |
- Fitting and longitudinal gluingCut the elastomer sleeve to the exact size without stretching it. Apply the special elastomer contact adhesive to both lips of the longitudinal slit, wait until it is tacky to the touch, then press the lips firmly against each other to ensure a sealed molecular weld.
- Connecting successive sleevesPush the sleeves slightly towards each other when gluing end to end, to create axial compression. Never rely on a surface adhesive tape to close an open joint: the edge adhesive must be present over 100% of the insulation cross-section.
- Treatment of valves and branchesMake valve boxes or cut mitred segments from the elastomer to fit valve bodies, press fittings and branch tees. Each control-spindle penetration must be sealed with a vapour-barrier tape glued under tension.
On construction sites for multi-family housing, the frequent omission of insulation on connection collars or floor branches to individual meters ruins the sanitary effectiveness of the installation. These bare zones create localised thermal bridges where condensation runs directly into the plasterboard linings. The site manager and the foreman must check the sealed continuity before the final closing of access hatches and the fitting of the service shaft enclosures.
Managing insulation non-conformities and remediation in the service shaft
On refurbishment or new-build construction sites, discovering a saturated service shaft where the cold water touches the hot distribution or the circulation loop is a major sanitary defect. According to the principles of SIA 385/1, the cold water must not exceed 25 °C at the draw-off point, while the hot water must remain above 50 °C to curb the growth of Legionella. If the site manager finds a non-conforming installation before the hatches or partitions are closed, the protocol of an immediate stop of the insulation work package applies.
The visual finding must be recorded in a joint photographic report with the sanitary engineer and site management. Where the available gap between bare pipes does not allow the required thicknesses to be applied for each fluid, fitting a split or crushed shell is strictly prohibited. Localised crushing destroys the thermal resistance and creates a vapour-barrier break that causes interstitial condensation, ruining the suspended ceiling below and corroding the metal clamps.
- Formal notice and stop reportDraw up a report of spatial incompatibility before the lining is installed, in accordance with the Code of Obligations, requiring a decision from site management on the routing or the widening of the opening.
- Revising the pipe centre distancesRemove the sections that are too close to restore a minimum clear distance that guarantees the full thickness of closed-cell insulation on the cold pipe and of mineral wool or elastomer on the hot pipe.
- Interposing a thermal screenIf moving the risers is physically impossible, insert a rigid, non-combustible insulating panel acting as a thermal baffle between the two networks.
- Vapour-tightness checkCheck the longitudinal and transverse gluing of the sleeves with suitable solvent-compatible adhesives, with no discontinuity at slab penetrations.
Frequently asked questions
How can cold water be prevented from warming up in a landing shaft shared with the heating?
SIA 385/1 requires limiting the warming of cold drinking water. A sufficient physical centre distance must be respected so that a sealed closed-cell vapour-barrier insulation can be fitted on the cold-water pipe and a thick thermal insulation on the hot one. If space is limited, install a rigid insulating partition between the two bundles and ventilate the shaft with high and low air vents.
What thickness of insulation should be fitted on a cold-water pipe in an unheated basement?
As a general rule, a thickness of 9 to 13 millimetres of closed-cell elastomer sleeve is sufficient against condensation in a temperate environment. In a damp technical room or a passage through a ventilated crawl space, increase to 19 millimetres. All longitudinal and circumferential joints must be bonded with the specific adhesive to block the ambient air.
Why prohibit glass wool without a vapour barrier on cold drinking-water pipes?
Bare glass wool is permeable to air. The water vapour in the ambient air migrates through the mineral fibres and meets the cold wall of the metal or plastic pipe, below the dew point. The water condenses within the insulation, which soaks up, immediately loses all insulating performance and triggers external corrosion under insulation while also promoting mould in the false ceiling.
What should be done if a thermal insulation sleeve is crushed against a fixing clamp?
A compressed insulation loses its trapped air volume and its vapour barrier tears, creating a damp thermal bridge. Clamps with integrated insulating shells in rigid polyurethane or high-density elastomer with a continuous vapour barrier should be used. The flexible sleeve is then butted and glued in a sealed manner against each end of the rigid support.
Texts and standards cited
- SIA 385/1Domestic hot-water installations in buildings - Thermal requirements and drinking-water hygiene