Key takeaways
- A complete strip-out without compaction produces between three and five cubic metres of bulked volume.
- Art. 17 OLED requires demolition materials and recoverable materials to be sorted on the construction site.
- Sanitary ceramics and the silvered glass of mirrors follow separate treatment routes.
- Brass taps and thermostatic bodies have an immediate market value when recycled.
Dismantling sequence and real volume: controlling bulking in the skip
Disorderly removal of a six-square-metre bathroom fills a seven-cubic-metre construction site skip in record time if the items are thrown in whole. The real volume of a complete strip-out includes the bathtub or shower tray, the wall-hung toilet with its concealed cistern, the vanity unit, the taps, the mirrors, the glass screen and the supply or drain pipework. Thrown in without preparation, these items trap air: an acrylic or enamelled steel bathtub alone takes up nearly one cubic metre in the container while weighing no more than forty kilos, preventing dense loading of the heavy materials.
- Isolating the services and removing the tapsClose the floor isolation valves and drain the hot and cold water network. Unscrew the mixers, shower columns and flexible hoses with an open-ended spanner or a slip-joint pliers without marking the reusable bodies, then temporarily seal the supply points with screw-in plugs.
- Removing glass screens, mirrors and wall accessoriesRemove the glass elements with glazier's suction cups, cutting the silicone beads with a retractable-blade cutter. Remove the bathroom cabinets and mirrors without breaking the glass, to avoid scattering dangerous shards across the construction site.
- Dismantling the furniture and detaching the countertopsUnscrew the drawers, doors and wall units with a screwdriver without tearing the fixings out of the walls. Mechanically separate the basin glued to the countertop before removing the wooden panels flat.
- Removing ceramic sanitary fixtures and tubsDrain the trap of the toilet pans and bidets. Unscrew the threaded rods at the support frames to remove the ceramics intact, then cut the connections of the bathtub or shower tray to extract it in one piece.
Sanitary ceramics and mirror glass raise very different disposal constraints. Sanitary ceramics (vitrified porcelain or stoneware) are an inert mineral waste. However, they are generally refused by crushing routes producing recycled concrete aggregates, because their hardness and glazing disturb the hydraulic binders of concrete plants; they therefore go to type B landfills for inert materials. Mirror glass, for its part, must never be mixed with household packaging glass: the silvered metallic backing and the multilayer safety films prevent conventional remelting in glassworks. It must be sent to the specific demolition flat-glass route or to combustible construction waste if the melamine frame remains stuck on.
Material segregation and recovery: profitable routes versus combustible waste
Melamine furniture and water-resistant particleboard make up the majority of the combustible volume of a strip-out. These items, made of wood chips pressed with formaldehyde resins and covered with a decorative synthetic sheet, cannot enter the untreated solid wood route. They must go to the combustible waste route sent to municipal waste incineration plants (UIOM). To optimise transport costs and skip volume, the foreman requires the units to be fully dismantled: backs, uprights and shelves are stacked flat, hardware removed, dividing the apparent storage volume by four.
| Sanitary component | Type of material | Recommended treatment route | Method of recovery |
|---|---|---|---|
| Mixers, traps and fittings | Chrome-plated brass, copper, stainless steel | Scrap dealer / Non-ferrous metals | Bought back by weight / Metallurgical recycling |
| Washbasin, wall-hung toilet, bidet | Sanitary porcelain, glazed stoneware | Mineral construction waste | Type B landfill / Inert technical backfill |
| Vanity unit and cabinets | Melamine particleboard | Combustible waste | Incineration with energy recovery (UIOM) |
| Mirror and toughened shower screen | Soda-lime glass, silvered glass | Demolition flat-glass route | Industrial crushing / Mineral insulation (glass wool) |
| Steel or cast-iron bathtub | Enamelled steel, ductile iron | Scrap recovery | Electric steelworks / Continuous material recycling |
Skilled installers systematically separate the valuable metal elements before loading the mixed-waste skip. Brass taps are an immediate source of value from local scrap dealers, provided the stainless-steel-braided rubber hoses have been unscrewed and the polymer cartridges removed. Likewise, enamelled cast-iron bathtubs from buildings of the 1960s to 1980s are a metal tonnage that can be sold directly. Apart from metal, recent sanitary fixtures in reputable-brand porcelain, toilet pans with an intact open rim and recent thermostatic mixers can be passed on through professional reuse channels or second-hand material platforms, sparing the company weight-based landfill fees.
Destination of materials: sanitary ceramics, mirrors and furniture under the OLED
The Ordinance on the Avoidance and the Disposal of Waste (OLED) strictly governs the removal of construction site waste in Switzerland. When renovating a bathroom, throwing all the removed items into an ordinary mixed-waste skip causes major extra costs at the weighbridge and breaches the federal sorting rules. A methodical strip-out requires inert rubble, special glass, wood derivatives and technical metals to be isolated from the very start of dismantling. This logistical discipline determines whether the truck is admitted to the regional sorting centres in French-speaking Switzerland. Any mixed load is downgraded with a penalty or reinvoiced at the higher rate for unsorted ordinary industrial waste.
Sanitary ceramics (vitrified porcelain of washbasins, glazed stoneware of toilet pans and shower trays) are a mineral waste that cannot be recovered in recycled concrete. Its glassy, impermeable structure prevents the cement from gripping mechanically, causing adhesion problems in the crushed aggregates. These fixtures must be sent to type B landfills for unpolluted inert materials. Mirror glass requires the same separation. The metallic silvering on the back of the glass and the protective varnishes pollute the cullet when clear flat shower-enclosure glass or packaging glass is remelted. Broken mirrors go exclusively into the class of non-recoverable mineral rejects at the sorting centre.
| Material and component removed | Material status under the OLED | Sorting requirement on the construction site | Approved outlet in French-speaking Switzerland |
|---|---|---|---|
| Sanitary ceramics (washbasin, toilet, bidet) | Inert mineral waste | Unscrew plugs, fixing screws and brass fittings | Controlled type B landfill for inert materials |
| Mirror glass with silvering | Non-recyclable mineral rejects | Must be kept strictly apart from clear toughened flat glass | Cantonal sorting centre, mineral rejects route |
| Vanity furniture and melamine tall units | Waste wood / combustible waste | Remove metal handles, mirrors and runners | Energy recovery in a municipal waste incineration plant |
| Taps, frames and brass pipes | Recoverable metals | Drain the water, remove polymer cartridges and aerators | Non-ferrous metal dealer, material recovery |
Vanity furniture and cabinets made of melamine particleboard fall under the waste wood or municipal combustible waste route. Thermosetting glues and resin coatings rule out any shredding into organic mulch. Installers carefully strip these units by removing steel hinges, telescopic drawer runners and lighting profiles. Once reduced to bare panels stacked up, the furniture is taken to the regional incineration plants to feed urban district heating networks.
Recovery, reuse and controlling the real volume of a complete strip-out
The real volume of a complete strip-out regularly surprises sanitary crews in the field. A modest 5 m² bathroom with a 170 cm acrylic bathtub, a vanity unit with bathroom cabinet, a wall-hung toilet and a glass cubicle generates between 3 and 4.5 m³ of bulked waste if no methodical compaction is carried out. A bathtub thrown in whole creates a hollow dome that fills the skip body in moments. To avoid filling a 6 m³ multi-skip within the first hour, the fitters cut synthetic bathtubs up with a reciprocating saw and take furniture apart flat with a mallet blow on the joints.
Recent sanitary components and quality taps are a worthwhile source of savings. Thermostatic mixers, concealed bodies and brass pipework are a source of non-ferrous metals, bought back at the official price by regional scrap dealers once the flexible hoses have been removed. In addition, intact universal support frames, wall-hung toilet pans free of limescale and toughened glass shower screens without chips are of interest to the material exchanges and construction reuse centres of French-speaking Switzerland. This reuse reduces the tonnage invoiced at the landfill while meeting the circular-economy requirements of Swiss clients.
Handling disposal disputes: downgraded skip, breakage and refused collection
On a sanitary renovation construction site, disposal turns into a dispute as soon as the initial sorting fails. The classic case arises when the skip driver or the sorting centre operator refuses the load for non-compliance with the OLED requirements. A skip ordered for inert waste or mineral demolition materials tolerates neither mirror fragments, nor melamine wood, nor silicone. As soon as a combustible or polluting component contaminates the rubble, the centre automatically downgrades it to mixed construction waste. The treatment invoice can then triple instantly, not counting the cost of the vehicle standing idle.
- Isolate the disputed load immediatelyIf the carrier finds a prohibited mixture on site, stop loading without emptying the container onto the roadway. Take photographs of the disputed volume before any handling.
- Assess the real volume and sort at sourceUnload the non-conforming items by hand: take out the melamine furniture and the glass panes and pack them in bags for combustible waste or in dedicated bins.
- Keep the tracking documents on fileSystematically demand the official weighing tickets and the acceptance certificates of the collection centre to guarantee environmental compliance towards the client.
When fixtures intended for resale or reuse are broken during the strip-out, report the damage without delay in the construction site log. Brass taps and enamelled cast-iron bathtubs retain a market value with metal dealers, even when cracked. However, a chipped washbasin or wall-hung toilet pan loses all second-hand value: put these items straight into the mineral fraction so as not to clutter the buffer zone or block access to the floors.
Frequently asked questions
How should mirror glass be disposed of compared with shower screen glass under the OLED?
Shower screen glass is toughened glazing that goes into the recyclable flat glass routes if the aluminium profiles are removed. The mirror contains silver salts, copper and a protective lacquer layer. These additives disturb glassworks melting furnaces. The OLED requires it to be separated from inert mineral waste. Broken mirror must be disposed of with residual combustible waste or in the dedicated technical glass fractions.
What real volume does the complete strip-out of a standard bathroom represent in the skip?
A six-square-metre bathroom generates between three and five cubic metres of real volume once dismantled. Hollow items such as acrylic bathtubs, toilet pans and vanity units create considerable bulking if thrown in whole. By breaking melamine furniture down flat and crushing the ceramics, the installer reduces this volume to about two compact cubic metres, avoiding the premature ordering of a second skip.
Can melamine furniture be disposed of with old roof-frame timber?
No. Melamine or laminated particleboard contains urea-formaldehyde resins and synthetic coatings. Recovery centres do not accept them in the category of natural or solid wood intended for shredding or composting. This furniture must be taken to the treated wood or combustible industrial waste route intended for incineration with heat recovery, in accordance with the construction site sorting routes prescribed in Switzerland.
Which removed sanitary fixtures have real resale or recovery value?
Mixers, shower columns and chrome-plated brass valves offer an immediate value by weight from scrap dealers. Enamelled cast-iron bathtubs and heated towel rails also sell very well for metal recycling. Ceramic toilet pans and shower trays are almost never resold second-hand, for hygiene reasons and because of invisible microcracks; they go straight to mineral crushing.
Texts and standards cited
- OLEDOrdinance on the Avoidance and the Disposal of Waste: principles for sorting and recovering construction waste