Key takeaways
- Mechanical filtration upstream protects the resins and the fittings against abrasion by sediments.
- Residual hardness must be adjusted to between eight and twelve French degrees to avoid corrosion.
- Brine discharge requires a full air gap to eliminate any risk of sanitary backflow.
- Checking the water hardness and topping up the salt ensure the longevity of the internal installation.
Adjusting residual hardness and protecting the network against corrosion
Installing an ion-exchange resin water softener on a drinking water supply is not merely a comfort requirement for the user; it directly determines the lifespan of the internal distribution network. When the raw water has a high hardness, the precipitation of calcium carbonate and magnesium carbonate quickly clogs the heat exchangers of domestic hot water production, blocks the valves of thermostatic mixers and degrades the sealing gaskets. However, blindly lowering the hardness to zero French degrees causes a severe calcium-carbonate imbalance. Water completely demineralised of calcium and magnesium destroys the natural protective film lining metal pipes and becomes aggressive, promoting pitting corrosion on copper or galvanised steel tubes.
- Initial measurement of raw hardnessUsing a colorimetric titration test kit with liquid reagent, record the exact value of the public network water at the drain valve of the meter. Each drop added equals one French degree (°fH). Note this reference value on the commissioning sheet.
- Adjustment of the built-in blending valveGradually open the micrometric bypass screw located on the control head of the water softener. This needle valve reinjects a fraction of filtered raw water into the softened water leaving the resin tank in order to recompose the target water hardness.
- Stabilised check at the test draw-off pointLet the blended water run for two minutes at a sampling valve located immediately downstream of the appliance. Take a second reading with the reagent to check that the residual hardness settles firmly between 8 and 12 °fH before sealing the setting.
| Hardness range (°fH) | Water classification | Impact on pipes and heat exchangers | Action recommended to the installer |
|---|---|---|---|
| 0 to 7 | Very soft | Aggressive to metals, risk of dissolving protective patinas | Hardness must be raised back via the blending bypass |
| 8 to 15 | Soft to moderately hard | Optimum balance, no thermal scaling, chemical neutrality | Standard setpoint range for softened water in distribution |
| 16 to 25 | Moderately hard | Progressive scaling of hot water circuits above 60 °C | Softening optional depending on the constraints of the hot water generators |
| More than 32 | Very hard | Rapid scaling of pipes, immersion heaters and fittings | Softening recommended while maintaining a hardness reserve |
The contractor is responsible for the conformity of the work and for the suitability of the materials used to the characteristics of the water, under art. 364 CO, which governs the contractor's liability during the execution of the work. An incorrect setting of the blending valve that sent water at 0 °fH into an old network of galvanised steel pipes would engage the installer's warranty in the event of premature perforation by crevice corrosion. For standard equipment in a single dwelling, the hardware investment and commissioning amount to around 2500 to 4200 CHF depending on the calculated peak flow rates.
Securing the hydraulic connection, the drain and the maintenance
Assembling the treatment line requires a strict geometric arrangement from the point where the pipe enters the technical room. First, immediately after the meter and the main non-return valve, the installer must fit a fine mechanical filter, preferably with manual or automatic backwashing, equipped with a stainless steel screen with a filtration fineness of between 80 and 100 micrometres. This filter intercepts grains of sand, oxide particles torn from the public distribution network and residues of hemp or tow. Without this component, impurities enter the resin bed of the water softener, scratch the ceramic discs of the multiport volumetric valve and cause continuous internal leaks to the sewer.
To eliminate this biological risk, protection against backflow of polluted water relies on two essential components. Upstream, the water softener is supplied through a testable disconnector or a non-return valve approved by the SSIGE, supplemented by a manual three-valve bypass assembly to isolate the appliance without shutting off the general supply of the building. Downstream, the discharge of regeneration brine and the overflow pipe of the salt tank must terminate above a drain funnel fitted with an independent trap, leaving a visible air gap of at least 20 millimetres above the overflow level, in accordance with the rules of the standard on drinking water protection.
- Six-monthly check of the fouling condition of the fine inlet filter and operation of the backwash until all visible impurities are completely purged.
- Monthly check of the level of regenerating salt in high-purity tablets certified to the European standard on sodium chloride for drinking water treatment.
- Annual cleaning of the brine suction strainer and disinfection of the ion-exchange resin with a suitable bactericidal agent during planned maintenance.
- Comparative chemical test of the raw hardness and the residual hardness using indicator drops to validate the calibration of the blending valve.
- Replacement of the O-rings of the control head and lubrication exclusively with food-grade silicone grease of the moving parts subject to friction.
Rigorous maintenance, recorded in a maintenance logbook fixed near the appliance, prevents bacteriological fouling of the resins, which frequently occurs when the appliance is under-used or poorly ventilated. In the event of a prolonged absence of water draw-off of more than one month, the sanitary installer must prescribe a forced regeneration followed by abundant rinsing of the resin bed before any water is consumed.
Commissioning checks and calibration of residual hardness
Adjusting an ion-exchange water softener does not mean removing all the limescale from the network. Water softened to 0 °fH becomes aggressive and dissolves the calcium carbonate forming the natural protective layer on the inner walls of copper or galvanised steel tubes. To maintain a lasting calcium-carbonate balance in accordance with SSIGE guideline W3/E1, the sanitary installer adjusts the built-in blending valve to obtain at all times a residual hardness of between 8 and 12 French degrees (°fH), the minimum threshold accepted being 7 °fH. Lowering the hardness below this limit accelerates pitting corrosion, degrades brazed joints and needlessly increases the sodium content of the drinking water.
| Parameter checked | Method or instrument | SSIGE target value | Corrective action |
|---|---|---|---|
| Raw total hardness | Complexometric titration | Local network value | Set the exchange capacity of the appliance |
| Blended residual hardness | Titrating reagent drops | 8 to 12 °fH (minimum 7 °fH) | Adjust the needle screw of the blending bypass |
| Added dissolved sodium | Stoichiometric calculation | Less than 200 mg/l in total | Raise the residual hardness on very hard water |
| Filter differential pressure | Upstream and downstream pressure gauges | Delta P less than 0.5 bar | Operate the backwash or change the screen |
| Drain air gap | Direct geometric measurement | Minimum gap of 20 mm | Reposition the discharge above the trap |
Periodic maintenance, salt supply and microbiological prevention
Operating a softening station requires methodical rigour to prevent fouling of the resins and bacterial contamination. A neglected appliance accumulates mineral particles, forms sterile salt crusts and can turn the exchange bed into an incubator for micro-organisms. The SSIGE W3 guidelines and the hygiene requirements applicable to internal drinking water installations impose a strict maintenance schedule comprising checking the regeneration salt, regular replacement of the upstream filter elements and periodic disinfection of the resin column.
- Cleaning the upstream fine filterCheck the filter screen located immediately downstream of the meter. On a backwash model, operate the valve to flush out sand and rust particles; on a filter with a disposable cartridge, replace the filter element every six months to avoid any pressure drop and the nesting of germs.
- Checking the tank and breaking up the saltCheck the condition of the salt reserve. Break up compact lumps forming a solid bridge above the water with a plastic tool so as not to puncture the tank. Remove the sludge and insoluble particles at the bottom of the tank once a year before refilling with tablets.
- Chemical disinfection of the resin bedInject a specific chlorine-based disinfectant solution during a forced regeneration cycle. This intervention is required at least once a year during the contractual service, and after every prolonged shutdown of the building exceeding four weeks, in order to eliminate any bacterial biofilm.
- Checking the drain air gapCheck the point where the rinse water is discharged to the sewer. The drain hose must terminate in free air above a siphon funnel with a minimum air gap of 20 mm. This hydraulic break prevents any backflow of wastewater or bacteria towards the water softener in the event of a blockage in the network.
- Final hardness measurement and sanitary logbookTitrate the blended water at the test tap after the complete rinse cycle. Record the measured residual hardness, the date, the reference of the salt used and the operations carried out in the maintenance logbook fixed near the appliance.
Softening faults: accelerated corrosion, malfunctions and corrective measures
Poorly controlled treatment causes rapid deterioration of the internal distribution. The appearance of rust-coloured water in galvanised steel pipes or blue-green traces on copper signals chemical aggressiveness resulting from water that is too soft. If the residual water hardness falls below the minimum value recommended by the SSIGE guidelines, the protective calcium-carbonate passivation layer dissolves, exposing the bare metal to dissolved oxygen. The first reflex on the construction site is to switch the manual bypass valve to the full bypass position to supply raw network water immediately, then to measure the total hardness with a volumetric titration test kit.
- Isolation and purgingClose the upstream and downstream isolation valves of the water softener. Open the bypass to ensure continuity of service. Purge the terminal sections of the building thoroughly to remove the aggressive or over-salted water present in the risers.
- Checking the filtration lineCheck the differential pressure gauge of the upstream filter. In the event of excessive pressure loss due to clogging of the screen, operate the backwash or replace the filter screen to avoid flow drops disturbing the regeneration cycles.
- Readjusting the blending valveAdjust the micrometric proportional blending screw integrated in the control head until the residual hardness stabilises between 8 and 12 French degrees. Validate the measurement after a sustained draw-off of at least five minutes.
- Inspecting the salt tank and the disconnectionBreak up the salt lumps caked at the base of the tank to restore a saturated brine. Check the drain funnel: the break in head with free air gap must be intact to eliminate any risk of backflow towards the drinking water network.
Frequently asked questions
Why is it prohibited to soften water to 0 French degrees in a residential building?
Zero hardness removes the calcium and magnesium ions essential for the formation of the protective film on metal walls. The water becomes aggressive, dissolves the zinc of galvanised steel or corrodes copper, which causes localised leaks and discoloration of the water. The SSIGE guidelines require a residual hardness of between 8 and 12 French degrees to be maintained to ensure the lifespan of the network and preserve the calcium-carbonate balance.
How should you react when a salty taste is noticed at the taps after a regeneration?
This brackish taste reveals incomplete rinsing of the cation resins or a problem with an internal valve of the control valve. Isolate the water softener immediately via the technical bypass. Run a forced rinse cycle while checking the upstream service pressure, which must be sufficient to expel the brine. Purge the internal network thoroughly and replace the piston seals or the suction cartridge if the problem persists on the head.
What air gap should be installed on the brine drain pipe of the water softener?
The flexible drain hose of the water softener must never be connected directly and watertight to the wastewater drain trap. In accordance with the SSIGE W3 guidelines and the standard on protection against drinking water pollution, a break in head by total overflow of at least twenty millimetres above the receiving funnel must be provided to prevent any bacterial backflow or return from the sewer towards the appliance.
How often should the upstream filter be cleaned and the resin bed disinfected?
The mechanical filter must be backwashed or have its cartridge changed every two to six months to avoid fouling and the proliferation of biofilm. For the water softener, the salt tank is cleaned annually to remove insoluble sludge. The resins undergo a specific chemical disinfection every year, often triggered automatically by an on-board chlorination cell at each regeneration according to the manufacturer's recommendations.
Texts and standards cited
- Directive SSIGE W3Guidelines for drinking water installations, general principles of design, installation and operation.
- Directive SSIGE W3/E1Protection of drinking water against backflow and pollution in internal distribution installations.
