🧱 CFC 250Drinking water: introduction, protection and meterChapter 6 of 10 in the section

Metering per dwelling: meter positions, accessibility and initial reading

This chapter gives you the method for positioning sub-meters on a landing manifold accessible from the common areas. You will learn how to structure the water distribution per dwelling, how to physically identify each branch to rule out network mix-ups, and how to draw up the zero-reading record that is essential at the acceptance of the sanitary installations.

Key takeaways

  • The landing manifold guarantees access to the meters without entering the private dwellings.
  • Aligning the meters between sixty centimetres and one metre sixty makes technical reading easier.
  • Permanent physical identification formally links each meter number to its cadastral lot.
  • The joint initial reading releases the plumber from responsibility before the occupants arrive.

Centralise the meters on the landing to ensure technical access

Installing water sub-meters inside a private dwelling systematically complicates the operation of the building. From commissioning onwards, the building manager or the meter-reading company runs into closed doors, missed appointments and flat-rate estimates that cause disputes between condominium owners or tenants. For a building constituted under the condominium ownership regime governed by art. 712a CC, or for a rental portfolio, the distribution of drinking water requires a clear separation between the common maintenance areas and the private areas.

The technical solution adopted in modern sanitary plumbing is based on the landing service shaft or the distribution cabinet accessible from the stairwell or the common corridor. The cold and hot domestic water risers feed a dedicated landing manifold on each floor. This manifold centralises all the individual branches. Each apartment thus has its own supply line, which can be isolated without shutting off the neighbours' supply and without crossing the threshold of an entrance door.

Ergonomic accessibility determines the compliance of the sanitary work. The sub-meters must be installed at a height between 0.60 m and 1.60 m above the finished floor of the landing. The reading dial must face the operator, with no visual obstruction. The installer systematically provides standardised straight lengths upstream and downstream of each volumetric or turbine device, failing which the metrological accuracy of the measurement is distorted by hydraulic turbulence.

Order of assembly of the components on a landing manifold branch
PositionSanitary componentTechnical functionSite check point
1. Direct upstreamBall or butterfly stop valveIsolation of the dwelling from the landingLockable or removable handle
2. MeasurementWater sub-meterVolumetric metering of cold or hot waterArrow on the body aligned with the flow direction
3. ProtectionAnti-pollution non-return valvePrevents contaminated water from flowing back into the riserBackflow tightness check
4. Direct downstreamStop valve with manual drainDraining of the individual lineDrain plug present and sealed

Record the zero reading and secure the allocation per dwelling

Swapping two pipes on a distribution manifold is a recurring defect that distorts the individual water cost allocation for months, even years. A low-consumption apartment may end up paying the bill of a large neighbouring family if the original labelling is wrong. Connecting a multilayer or polyethylene pipe from the landing manifold to the internal distribution board requires an indestructible physical marking, made at the rough-in stage and confirmed at final connection.

The identification cannot rely on simple felt-tip markings on the protective sleeve. The plumber fits engraved tags made of rigid synthetic material or aluminium, firmly fixed with metal clamps on each branch pipe. Each tag must clearly state the lot identifier, the floor and the official door number used by the building management. The match with the unique serial number stamped by the manufacturer on the brass body of the meter is then recorded in the revised technical execution plan.

  1. Complete flushing before fitting the mechanismsFlush the pressurised distribution network thoroughly using temporary tubular spacer pieces. Never flush the network through the final meters, so that filings, site sand and hemp residues do not block or damage the measuring turbines.
  2. Fitting the meters and checking the flow directionsReplace the spacer pieces with the sub-meters fitted with their new fibre or elastomer gaskets suitable for drinking water. Check that the arrow engraved on the brass strictly follows the direction of flow towards the dwelling concerned.
  3. Hydraulic identification test dwelling by dwellingClose all the valves on the manifold. Open the draw-off point of lot 101, open the valve labelled 101 on the landing manifold and visually confirm the rotation of the dial of meter 101. Repeat the operation for each apartment to eliminate any risk of physical mix-up.
  4. Drawing up the joint initial readingRead the mechanical index shown on each meter at the end of the sanitary commissioning work. Enter the black digits for cubic metres and the red digits for fractions of litres on the official commissioning sheet.

Design of the landing manifold and accessibility of the fittings

Locating the cold and hot domestic water sub-meters within a landing service shaft is the only lasting arrangement that guarantees permanent access to the metering components without depending on the presence of the occupants. When the meters are enclosed in private bathrooms or kitchens, periodic reading by the property manager or remote-reading companies becomes uncertain, generating flat-rate estimates that are a source of recurring disputes. The distribution manifold on the floor landing makes it possible to group, on a single vertical plane, all the individual branches for the apartments on that level.

To ensure easy reading and to allow maintenance or replacement without destructive dismantling, the geometry of the manifold and of the spacer pieces must respect strict accessibility dimensions. The axis of the meter dials must be positioned between 0.60 m and 1.50 m above the finished floor of the landing. A minimum free frontal distance of 0.70 m in front of the open shaft is required for technicians to work and to handle pliers or adjustable spanners. Any recess that is too deep or hidden behind a slab downstand prevents the rotation of the measuring head or the deployment of the M-Bus radio module.

Mandatory components of each sub-meter branch in the service shaft
ComponentPosition on the lineTechnical functionInstallation requirement
Upstream stop valveDirectly on the branch tee of the manifoldHydraulic isolation of the line without shutting off the rest of the floorFull-bore ball valve with drain
Sub-meterBetween telescopic connectors or shellsVolumetric measurement of the apartment's cold or hot waterHorizontal or vertical mounting according to the certified accuracy class
Non-return valveImmediately downstream of the meterProtection against backflow of hot or polluted water into the upstream networkTestable valve compliant with SSIGE guidelines
Downstream stop valveAt the head of the dwelling's connection pipePrivate shut-off accessible to the tenant or ownerQuarter-turn handle marked with a standardised colour code

Each branch on the manifold must receive a permanent physical identification. Adhesive tape labels or felt-tip markings on the thermal insulation are prohibited, because they disappear or become illegible due to condensation humidity or site dust. The tradesperson fits engraved tags made of two-layer plastic or anodised aluminium, riveted directly on the pipe support clamp or mechanically fixed with a metal clamp. This marking states the official apartment number according to the cantonal register of buildings and dwellings, the compass orientation on the landing and the identifier of the corresponding riser.

Joint zero-reading protocol and clearing of reservations

Filling the water system of a new or heavily converted residential building causes significant consumption that must under no circumstances be passed on to the first tenants or floor owners. Pressure flushing of stainless steel or multilayer pipes, tightness tests, filling of cisterns and riser purge tests consume several hundred litres per section. In addition, the finishing trades frequently use the internal draw-off points for mixing plaster, cleaning tiling or paint trials before the keys are actually handed over.

  1. Physical check of hydraulic correspondenceBefore any signature, open a draw-off tap in the dwelling concerned and visually check the immediate rotation of the measuring star on the corresponding meter on the landing manifold. This operation eliminates any risk of crossed lines between two adjoining apartments.
  2. Recording of identifiers and starting indexesRecord on the acceptance form the manufacturing number stamped on the meter housing, the network address of the radio head where applicable, and the exact volumetric index in cubic metres and litres at the time of transfer of ownership.
  3. Joint signature of the recordHave the reading countersigned by site management and by the representative of the property management or of the client, in accordance with the defect verification provided for in art. 367 CO.
  4. Sealing or security sealFit a numbered plastic seal or a tamper-proof lead seal on the nut of the upstream connector of the meter, in order to prevent any unauthorised removal of the device between acceptance and move-in.

In the event of a later dispute relating to condominium ownership under art. 712a CC, the file of executed works must include the complete summary table of the starting indexes. The sanitary installer provides a signed paper copy and a digital export containing the matching of the meter serial numbers with the floor lots. This documentary rigour protects the sanitary installation company against any claim for faulty execution or negligence at the transfer of risks of the drinking water installation.

Handling anomalies: swapped branch, leak after the meter and disputed reading

In the field, an identification defect on the landing manifold causes immediate disputes as soon as the first bill from the property manager arrives. The swapping of two cold or hot domestic water branches is the most frequent dispute in collective housing. When the occupant of a studio bears the consumption of the neighbouring family dwelling, the sanitary installer's responsibility remains engaged as long as the joint inspection record of commissioning has not validated the physical allocation of each volumetric meter.

  1. Allocation check by thermal draw-offOpen each draw-off point in turn in the designated apartment while visually checking the rotation of the corresponding totaliser on the landing. Measure the temperature rise with a contact thermometer on the hot domestic water branch to formally distinguish two neighbouring pipes in the service shaft.
  2. Isolation and leak test after the meterClose all the private stop valves of the dwelling. If the indicator star of the meter is still turning or if the digital index keeps running, a residual leak exists on the concealed distribution, on a wall-hung WC cistern or on a leaking safety valve.
  3. Correction of identifications and corrective recordReplace without delay the incorrect engraved labels on the valves and meters. Immediately draw up an addendum to the initial reading protocol, recording the new meter serial numbers per dwelling, countersigned by site management and the property management.
Protocol for clearing metering anomalies on the landing manifold
Anomaly observedOn-site checkCorrective action
Index turning without draw-offClosing the landing stop valve, then measuring pressure with a pressure gauge.Replacing the defective gasket or adjusting the cistern flushing mechanism.
Two dwellings crossedDrawing cold water at the sink while directly observing the landing dial.Physical identification of the pipes and updating of the serial number table.
Initial index not recordedPhotographic review of the structural work acceptance or immediate visual reading.Signing a transactional zero-index record with the property management.

Frequently asked questions

How can you quickly prove that a cold water meter is not supplying the wrong apartment?

The most direct method is to close the stop valve located immediately upstream of the meter in question in the landing cabinet, then to check at the kitchen tap of the dwelling concerned that the flow stops completely. If water continues to flow at the private draw-off point, the branch is crossed with a neighbouring dwelling. This simple, repeatable operation eliminates any dispute before the property management.

What should be done if a meter records consumption before the tenant arrives?

The exact index must be read on the day of acceptance of the work and this value recorded on the technical handover form. If consumption appears between the end of the works and the move-in inspection, it corresponds either to installation tests or to a leak on a sanitary appliance. A search for leaks on the WC cisterns is required before signing.

Where should the landing distribution cabinet be installed to meet maintenance requirements?

The distribution cabinet must be located in the common circulation areas or the landing shaft, at an operating height between 60 and 160 centimetres above the finished floor. This location guarantees permanent accessibility for the meter reader and the operating services, without requiring private access. The shaft door must have a standardised lock and a permanent identification of the apartments.

What mandatory information must appear on the nameplate of each meter?

Each branch on the manifold must carry a rigid, engraved label stating the official dwelling number, the floor and the fluid type (cold domestic water or hot domestic water). The metrological serial number engraved on the meter body must correspond exactly to the one recorded on the sanitary installer's as-built plan and on the initial commissioning protocol.

Texts and standards cited

  • norme SIA 118General conditions for the execution of construction work, acceptance of the work and remedying of defects
  • directive SSIGE W3Guidelines for drinking water installations, distribution principles, safety and metering